EP2038482 - TRACK CONSTRUCTION MACHINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.09.2010 Database last updated on 03.06.2024 | Most recent event Tooltip | 19.10.2012 | Lapse of the patent in a contracting state New state(s): TR | published on 21.11.2012 [2012/47] | Applicant(s) | For all designated states Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Johannesgasse 3 1010 Wien / AT | [2009/13] | Inventor(s) | 01 /
THEURER, Josef Johannesgasse 3 A-1010 Wien / AT | 02 /
BRUNNINGER, Manfred Bergweg 10 A-4203 Altenberg / AT | 03 /
FRANZ, Florian Urlingerweg 13 A-3270 Scheibbs / AT | [2009/13] | Application number, filing date | 07764549.7 | 29.05.2007 | [2009/13] | WO2007EP04724 | Priority number, date | AT20060001081 | 27.06.2006 Original published format: AT 10812006 | [2009/13] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2008000328 | Date: | 03.01.2008 | Language: | DE | [2008/01] | Type: | A1 Application with search report | No.: | EP2038482 | Date: | 25.03.2009 | Language: | DE | The application published by WIPO in one of the EPO official languages on 03.01.2008 takes the place of the publication of the European patent application. | [2009/13] | Type: | B1 Patent specification | No.: | EP2038482 | Date: | 18.11.2009 | Language: | DE | [2009/47] | Search report(s) | International search report - published on: | EP | 03.01.2008 | Classification | IPC: | E01B29/05 | [2009/13] | CPC: |
E01B29/05 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2009/13] | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | GLEISBAUMASCHINE | [2009/13] | English: | TRACK CONSTRUCTION MACHINE | [2009/13] | French: | ENGIN DE POSE DE VOIE | [2009/13] | Entry into regional phase | 27.01.2009 | National basic fee paid | 27.01.2009 | Designation fee(s) paid | 29.12.2008 | Examination fee paid | Examination procedure | 29.12.2008 | Examination requested [2009/13] | 16.04.2009 | Despatch of a communication from the examining division (Time limit: M04) | 04.05.2009 | Reply to a communication from the examining division | 20.07.2009 | Communication of intention to grant the patent | 28.09.2009 | Fee for grant paid | 28.09.2009 | Fee for publishing/printing paid | Opposition(s) | 19.08.2010 | No opposition filed within time limit [2010/43] | Fees paid | Renewal fee | 02.06.2009 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 18.11.2009 | DK | 18.11.2009 | EE | 18.11.2009 | FI | 18.11.2009 | IE | 18.11.2009 | LT | 18.11.2009 | LV | 18.11.2009 | MT | 18.11.2009 | SE | 18.11.2009 | SI | 18.11.2009 | SK | 18.11.2009 | TR | 18.11.2009 | BG | 18.02.2010 | GR | 19.02.2010 | IS | 18.03.2010 | PT | 18.03.2010 | LU | 29.05.2010 | BE | 31.05.2010 | MC | 31.05.2010 | [2012/47] |
Former [2012/43] | CY | 18.11.2009 | |
DK | 18.11.2009 | ||
EE | 18.11.2009 | ||
FI | 18.11.2009 | ||
IE | 18.11.2009 | ||
LT | 18.11.2009 | ||
LV | 18.11.2009 | ||
MT | 18.11.2009 | ||
SE | 18.11.2009 | ||
SI | 18.11.2009 | ||
SK | 18.11.2009 | ||
BG | 18.02.2010 | ||
GR | 19.02.2010 | ||
IS | 18.03.2010 | ||
PT | 18.03.2010 | ||
LU | 29.05.2010 | ||
BE | 31.05.2010 | ||
MC | 31.05.2010 | ||
Former [2011/41] | CY | 18.11.2009 | |
DK | 18.11.2009 | ||
EE | 18.11.2009 | ||
FI | 18.11.2009 | ||
IE | 18.11.2009 | ||
LT | 18.11.2009 | ||
LV | 18.11.2009 | ||
MT | 18.11.2009 | ||
SE | 18.11.2009 | ||
SI | 18.11.2009 | ||
SK | 18.11.2009 | ||
BG | 18.02.2010 | ||
GR | 19.02.2010 | ||
IS | 18.03.2010 | ||
PT | 18.03.2010 | ||
BE | 31.05.2010 | ||
MC | 31.05.2010 | ||
Former [2011/25] | CY | 18.11.2009 | |
DK | 18.11.2009 | ||
EE | 18.11.2009 | ||
FI | 18.11.2009 | ||
IE | 18.11.2009 | ||
LT | 18.11.2009 | ||
LV | 18.11.2009 | ||
MT | 18.11.2009 | ||
SE | 18.11.2009 | ||
SI | 18.11.2009 | ||
SK | 18.11.2009 | ||
BG | 18.02.2010 | ||
GR | 19.02.2010 | ||
IS | 18.03.2010 | ||
PT | 18.03.2010 | ||
IT | 29.05.2010 | ||
BE | 31.05.2010 | ||
MC | 31.05.2010 | ||
Former [2010/43] | CY | 18.11.2009 | |
DK | 18.11.2009 | ||
EE | 18.11.2009 | ||
FI | 18.11.2009 | ||
IE | 18.11.2009 | ||
LT | 18.11.2009 | ||
LV | 18.11.2009 | ||
SE | 18.11.2009 | ||
SI | 18.11.2009 | ||
SK | 18.11.2009 | ||
BG | 18.02.2010 | ||
IS | 18.03.2010 | ||
PT | 18.03.2010 | ||
Former [2010/28] | CY | 18.11.2009 | |
FI | 18.11.2009 | ||
LT | 18.11.2009 | ||
LV | 18.11.2009 | ||
SE | 18.11.2009 | ||
SI | 18.11.2009 | ||
IS | 18.03.2010 | ||
PT | 18.03.2010 | Cited in | International search | [A]CH511332 (MATISA MATERIEL IND SA [CH]) [A] 1 * column 3, line 17 - line 45; figure - *; | [A]GB1322544 (PLASSER BAHNBAUMASCH FRANZ) [A] 1 * page 3, line 32 - line 97; figure - *; | [DA]US4342165 (THEURER JOSEF, et al) [DA] 1 * column 3, line 10 - line 35; figure - *; | [A]EP0388573 (SCHEUCHZER FILS AUGUSTE [CH]) |