blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2046564

EP2046564 - Method for production of several fibre composite components [Right-click to bookmark this link]
Former [2009/16]METHOD FOR PRODUCTION OF SEVERAL FIBRE COMPOSITE COMPONENTS
[2011/49]
StatusNo opposition filed within time limit
Status updated on  01.03.2013
Database last updated on 09.09.2024
Most recent event   Tooltip18.07.2014Lapse of the patent in a contracting state
New state(s): HU
published on 20.08.2014  [2014/34]
Applicant(s)For all designated states
Airbus SAS
1 Rond-Point Maurice Bellonte
31707 Blagnac Cedex / FR
[2009/16]
Inventor(s)01 / FILSINGER, Jürgen
Birkenstrasse 6
85635-Hoehenkirchen-Siegertsbrunn / DE
02 / MAIDL, Franz
Neusling 15
94574 Wallerfing / DE
03 / GESSLER, Andreas
Brunnenstr. 6
85540 Haar / DE
04 / SCHOUTEN, Marinus
Münchner Strasse 45
83607 Holzkirchen / DE
 [2009/19]
Former [2009/16]01 / FILSINGER, Jürgen
Münchener Str. 15a
83620 Feldkirchen-Westerham / DE
02 / MAIDL, Franz
Neusling 15
94574 Wallerfing / DE
03 / GESSLER, Andreas
Brunnenstr. 6
85540 Haar / DE
04 / SCHOUTEN, Marinus
Münchner Strasse 45
83607 Holzkirchen / DE
Representative(s)Petit, Maxime
Santarelli
14, Avenue de la Grande Armée
BP 237
75822 Paris Cedex 17 / FR
[N/P]
Former [2012/17]Petit, Maxime
Santarelli 14, avenue de la Grande Armée
75017 Paris / FR
Former [2009/16]Petit, Maxime
Santarelli 14, avenue de la Grande Armée
75017 Paris / FR
Application number, filing date07765007.503.07.2007
[2009/16]
WO2007EP05856
Priority number, dateDE2006103593931.07.2006         Original published format: DE102006035939
[2009/16]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2008014858
Date:07.02.2008
Language:DE
[2008/06]
Type: A1 Application with search report 
No.:EP2046564
Date:15.04.2009
Language:DE
The application published by WIPO in one of the EPO official languages on 07.02.2008 takes the place of the publication of the European patent application.
[2009/16]
Type: B1 Patent specification 
No.:EP2046564
Date:25.04.2012
Language:DE
[2012/17]
Search report(s)International search report - published on:EP07.02.2008
ClassificationIPC:B29C70/08, B29C70/44, B29C70/50, B29C70/86
[2011/45]
CPC:
B29C70/443 (EP,US); B29C70/086 (EP,US); B29C70/50 (EP,US);
B29C70/545 (EP,US); B29C70/865 (EP,US); B29C2793/009 (EP,US);
B29L2031/003 (EP,US); Y02T50/40 (EP,US); Y10T156/10 (EP,US);
Y10T428/24628 (EP,US) (-)
Former IPC [2009/16]B29C70/54, B29C70/30, B29D31/00
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2009/16]
TitleGerman:Verfahren zur Herstellung von mehreren Faserverbundbauteilen[2011/49]
English:Method for production of several fibre composite components[2011/49]
French:Procédé de production de plusieurs éléments composites à base de fibres[2011/49]
Former [2009/16]VERFAHREN ZUR HERSTELLUNG VON MEHREREN FASERVERBUNDBAUTEILEN
Former [2009/16]METHOD FOR PRODUCTION OF SEVERAL FIBRE COMPOSITE COMPONENTS
Former [2009/16]PROCÉDÉ DE PRODUCTION DE PLUSIEURS ÉLÉMENTS COMPOSITES À BASE DE FIBRES
Entry into regional phase20.01.2009National basic fee paid 
20.01.2009Designation fee(s) paid 
20.01.2009Examination fee paid 
Examination procedure20.01.2009Examination requested  [2009/16]
14.10.2009Despatch of a communication from the examining division (Time limit: M06)
01.06.2010Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
24.06.2010Reply to a communication from the examining division
01.12.2010Despatch of a communication from the examining division (Time limit: M04)
24.03.2011Reply to a communication from the examining division
11.11.2011Communication of intention to grant the patent
07.03.2012Fee for grant paid
07.03.2012Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  14.10.2009
Opposition(s)28.01.2013No opposition filed within time limit [2013/14]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
24.06.2010Request for further processing filed
24.06.2010Full payment received (date of receipt of payment)
Fees paidRenewal fee
20.07.2009Renewal fee patent year 03
27.07.2010Renewal fee patent year 04
25.07.2011Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU03.07.2007
CY25.04.2012
CZ25.04.2012
DK25.04.2012
EE25.04.2012
FI25.04.2012
IT25.04.2012
LT25.04.2012
LV25.04.2012
MT25.04.2012
NL25.04.2012
PL25.04.2012
RO25.04.2012
SE25.04.2012
SI25.04.2012
SK25.04.2012
TR25.04.2012
IE03.07.2012
LU03.07.2012
BG25.07.2012
GR26.07.2012
AT31.07.2012
BE31.07.2012
CH31.07.2012
LI31.07.2012
MC31.07.2012
ES05.08.2012
IS25.08.2012
PT27.08.2012
[2014/34]
Former [2014/27]CY25.04.2012
CZ25.04.2012
DK25.04.2012
EE25.04.2012
FI25.04.2012
IT25.04.2012
LT25.04.2012
LV25.04.2012
MT25.04.2012
NL25.04.2012
PL25.04.2012
RO25.04.2012
SE25.04.2012
SI25.04.2012
SK25.04.2012
TR25.04.2012
IE03.07.2012
LU03.07.2012
BG25.07.2012
GR26.07.2012
AT31.07.2012
BE31.07.2012
CH31.07.2012
LI31.07.2012
MC31.07.2012
ES05.08.2012
IS25.08.2012
PT27.08.2012
Former [2014/21]CY25.04.2012
CZ25.04.2012
DK25.04.2012
EE25.04.2012
FI25.04.2012
IT25.04.2012
LT25.04.2012
LV25.04.2012
MT25.04.2012
NL25.04.2012
PL25.04.2012
RO25.04.2012
SE25.04.2012
SI25.04.2012
SK25.04.2012
TR25.04.2012
IE03.07.2012
BG25.07.2012
GR26.07.2012
AT31.07.2012
BE31.07.2012
CH31.07.2012
LI31.07.2012
MC31.07.2012
ES05.08.2012
IS25.08.2012
PT27.08.2012
Former [2013/48]CY25.04.2012
CZ25.04.2012
DK25.04.2012
EE25.04.2012
FI25.04.2012
IT25.04.2012
LT25.04.2012
LV25.04.2012
MT25.04.2012
NL25.04.2012
PL25.04.2012
RO25.04.2012
SE25.04.2012
SI25.04.2012
SK25.04.2012
IE03.07.2012
BG25.07.2012
GR26.07.2012
AT31.07.2012
BE31.07.2012
CH31.07.2012
LI31.07.2012
MC31.07.2012
ES05.08.2012
IS25.08.2012
PT27.08.2012
Former [2013/34]CY25.04.2012
CZ25.04.2012
DK25.04.2012
EE25.04.2012
FI25.04.2012
IT25.04.2012
LT25.04.2012
LV25.04.2012
MT25.04.2012
NL25.04.2012
PL25.04.2012
RO25.04.2012
SE25.04.2012
SI25.04.2012
SK25.04.2012
IE03.07.2012
BG25.07.2012
GR26.07.2012
BE31.07.2012
CH31.07.2012
LI31.07.2012
MC31.07.2012
ES05.08.2012
IS25.08.2012
PT27.08.2012
Former [2013/33]CY25.04.2012
CZ25.04.2012
DK25.04.2012
EE25.04.2012
FI25.04.2012
IT25.04.2012
LT25.04.2012
LV25.04.2012
NL25.04.2012
PL25.04.2012
RO25.04.2012
SE25.04.2012
SI25.04.2012
SK25.04.2012
IE03.07.2012
GR26.07.2012
BE31.07.2012
CH31.07.2012
LI31.07.2012
MC31.07.2012
ES05.08.2012
IS25.08.2012
PT27.08.2012
Former [2013/24]CY25.04.2012
CZ25.04.2012
DK25.04.2012
EE25.04.2012
FI25.04.2012
IT25.04.2012
LT25.04.2012
LV25.04.2012
NL25.04.2012
PL25.04.2012
RO25.04.2012
SE25.04.2012
SI25.04.2012
SK25.04.2012
GR26.07.2012
BE31.07.2012
CH31.07.2012
LI31.07.2012
MC31.07.2012
ES05.08.2012
IS25.08.2012
PT27.08.2012
Former [2013/22]CY25.04.2012
CZ25.04.2012
DK25.04.2012
EE25.04.2012
FI25.04.2012
IT25.04.2012
LT25.04.2012
LV25.04.2012
NL25.04.2012
PL25.04.2012
RO25.04.2012
SE25.04.2012
SI25.04.2012
SK25.04.2012
GR26.07.2012
CH31.07.2012
LI31.07.2012
MC31.07.2012
ES05.08.2012
IS25.08.2012
PT27.08.2012
Former [2013/20]CY25.04.2012
CZ25.04.2012
DK25.04.2012
EE25.04.2012
FI25.04.2012
IT25.04.2012
LT25.04.2012
LV25.04.2012
NL25.04.2012
PL25.04.2012
RO25.04.2012
SE25.04.2012
SI25.04.2012
SK25.04.2012
GR26.07.2012
CH31.07.2012
LI31.07.2012
MC31.07.2012
IS25.08.2012
PT27.08.2012
Former [2013/11]CY25.04.2012
CZ25.04.2012
DK25.04.2012
EE25.04.2012
FI25.04.2012
IT25.04.2012
LT25.04.2012
LV25.04.2012
NL25.04.2012
PL25.04.2012
RO25.04.2012
SE25.04.2012
SI25.04.2012
SK25.04.2012
GR26.07.2012
MC31.07.2012
IS25.08.2012
PT27.08.2012
Former [2013/10]CY25.04.2012
CZ25.04.2012
DK25.04.2012
EE25.04.2012
FI25.04.2012
LT25.04.2012
LV25.04.2012
NL25.04.2012
PL25.04.2012
RO25.04.2012
SE25.04.2012
SI25.04.2012
SK25.04.2012
GR26.07.2012
IS25.08.2012
PT27.08.2012
Former [2013/09]CY25.04.2012
DK25.04.2012
EE25.04.2012
FI25.04.2012
LT25.04.2012
LV25.04.2012
NL25.04.2012
PL25.04.2012
SE25.04.2012
SI25.04.2012
GR26.07.2012
IS25.08.2012
PT27.08.2012
Former [2013/08]CY25.04.2012
DK25.04.2012
FI25.04.2012
LT25.04.2012
LV25.04.2012
NL25.04.2012
PL25.04.2012
SE25.04.2012
SI25.04.2012
GR26.07.2012
IS25.08.2012
PT27.08.2012
Former [2013/01]CY25.04.2012
FI25.04.2012
LT25.04.2012
LV25.04.2012
PL25.04.2012
SE25.04.2012
SI25.04.2012
GR26.07.2012
IS25.08.2012
PT27.08.2012
Former [2012/51]CY25.04.2012
FI25.04.2012
LT25.04.2012
LV25.04.2012
PL25.04.2012
SE25.04.2012
SI25.04.2012
GR26.07.2012
IS25.08.2012
Former [2012/50]CY25.04.2012
FI25.04.2012
LT25.04.2012
LV25.04.2012
PL25.04.2012
SE25.04.2012
GR26.07.2012
IS25.08.2012
Former [2012/49]CY25.04.2012
FI25.04.2012
LT25.04.2012
PL25.04.2012
SE25.04.2012
IS25.08.2012
Former [2012/48]FI25.04.2012
LT25.04.2012
SE25.04.2012
Former [2012/47]LT25.04.2012
Cited inInternational search[X]EP0069539  (BRITISH PETROLEUM CO PLC [GB]) [X] 1-8 * claims 1,8,9 * * figure 6 *;
 [X]US4512835  (GARDINER RICHARD J [US]) [X] 1-8 * claim 1 * * figures 3-9 * * abstract *;
 [Y]FR2760397  (DAVID JEAN ALPHONSE [FR]) [Y] 1-7 * figures 1-3 * * page 2, line 1 - line 9 *;
 [Y]DE10326422  (EADS DEUTSCHLAND GMBH [DE]) [Y] 1-7 * claim 1 * * figure 1 *;
 [PX]EP1798428  (EADS DEUTSCHLAND GMBH [DE]) [PX] 1-8 * claims 16,21,25,30 ** paragraphs [0015] , [0047] , [0048] , [0051] , [0053] , [0055] - [0057] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.