Extract from the Register of European Patents

EP About this file: EP2024219

EP2024219 - SYSTEM FOR LOCKING A FIRST SHAFT WITH RESPECT TO A SECOND SHAFT ELIMINATING CLEARANCES BETWEEN SAID SHAFTS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.10.2010
Database last updated on 11.04.2026
Most recent event   Tooltip19.10.2012Lapse of the patent in a contracting state
New state(s): TR
published on 21.11.2012  [2012/47]
Applicant(s)For all designated states
ZF Systemes de Direction Nacam, S.A.S.
Z.I. Sud, 2 Route de Blois
41100 Vendome / FR
[2009/08]
Inventor(s)01 / LAISEMENT, André
9 rue des Chaumes
41290 La Chapelle Encherie / FR
02 / EMERY, Vincent
7 rue Honoré de Balzac
41310 Saint Amand Longpre / FR
03 / MILLET, Pascal
3 Impasse du Gué - Meslay
41100 Vendome / FR
 [2009/08]
Representative(s)Novagraaf Technologies
Bâtiment O2
2, Rue Sarah Bernhardt
CS90017
92665 Asnières-sur-Seine Cedex / FR
[N/P]
Former [2009/08]Bredema
38, avenue de l'Opéra
75002 Paris / FR
Application number, filing date07766066.016.05.2007
[2009/08]
WO2007FR51292
Priority number, dateFR2006000443417.05.2006         Original published format: FR 0604434
[2009/08]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2007132133
Date:22.11.2007
Language:FR
[2007/47]
Type: A1 Application with search report 
No.:EP2024219
Date:18.02.2009
Language:FR
The application published by WIPO in one of the EPO official languages on 22.11.2007 takes the place of the publication of the European patent application.
[2009/08]
Type: B1 Patent specification 
No.:EP2024219
Date:25.11.2009
Language:FR
[2009/48]
Search report(s)International search report - published on:EP22.11.2007
ClassificationIPC:B62D1/20, B62D1/10
[2009/08]
CPC:
B62D1/10 (EP,US); B62D1/20 (EP,US); F16B7/042 (EP,US);
F16D1/108 (EP,US); F16D3/387 (EP,US); F16B2200/10 (EP,US);
F16B2200/69 (EP,US); Y10T403/60 (EP,US); Y10T403/7086 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2009/08]
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
RSNot yet paid
TitleGerman:SYSTEM ZUR ARRETIERUNG EINES SCHAFTS IN EINER BESTIMMTEN LAGE IM VERHÄLTNIS ZU EINEM ANDEREN SCHAFT UNTER ELIMINIERUNG DES SPIELRAUMS ZWISCHEN DEN BEIDEN SCHÄFTEN[2009/08]
English:SYSTEM FOR LOCKING A FIRST SHAFT WITH RESPECT TO A SECOND SHAFT ELIMINATING CLEARANCES BETWEEN SAID SHAFTS[2009/08]
French:SYSTEME DE VERROUILLAGE D'UN PREMIER ARBRE PAR RAPPORT A UN DEUXIEME ARBRE SUPPRIMANT LES JEUX ENTRE LESDITS ARBRES[2009/08]
Entry into regional phase19.11.2008National basic fee paid 
19.11.2008Designation fee(s) paid 
19.11.2008Examination fee paid 
Examination procedure19.11.2008Examination requested  [2009/08]
20.05.2009Communication of intention to grant the patent
15.09.2009Fee for grant paid
15.09.2009Fee for publishing/printing paid
Opposition(s)26.08.2010No opposition filed within time limit [2010/44]
Fees paidRenewal fee
26.05.2009Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT25.11.2009
CY25.11.2009
CZ25.11.2009
DK25.11.2009
EE25.11.2009
FI25.11.2009
IE25.11.2009
LT25.11.2009
LV25.11.2009
MT25.11.2009
NL25.11.2009
PL25.11.2009
RO25.11.2009
SE25.11.2009
SI25.11.2009
SK25.11.2009
TR25.11.2009
BG25.02.2010
GR26.02.2010
ES08.03.2010
IS25.03.2010
PT25.03.2010
LU16.05.2010
HU26.05.2010
BE31.05.2010
MC31.05.2010
[2012/47]
Former [2012/43]AT25.11.2009
CY25.11.2009
CZ25.11.2009
DK25.11.2009
EE25.11.2009
FI25.11.2009
IE25.11.2009
LT25.11.2009
LV25.11.2009
MT25.11.2009
NL25.11.2009
PL25.11.2009
RO25.11.2009
SE25.11.2009
SI25.11.2009
SK25.11.2009
BG25.02.2010
GR26.02.2010
ES08.03.2010
IS25.03.2010
PT25.03.2010
LU16.05.2010
HU26.05.2010
BE31.05.2010
MC31.05.2010
Former [2012/42]AT25.11.2009
CY25.11.2009
CZ25.11.2009
DK25.11.2009
EE25.11.2009
FI25.11.2009
IE25.11.2009
LT25.11.2009
LV25.11.2009
MT25.11.2009
NL25.11.2009
PL25.11.2009
RO25.11.2009
SE25.11.2009
SI25.11.2009
SK25.11.2009
BG25.02.2010
GR26.02.2010
ES08.03.2010
IS25.03.2010
PT25.03.2010
HU26.05.2010
BE31.05.2010
MC31.05.2010
Former [2011/41]AT25.11.2009
CY25.11.2009
CZ25.11.2009
DK25.11.2009
EE25.11.2009
FI25.11.2009
IE25.11.2009
LT25.11.2009
LV25.11.2009
MT25.11.2009
NL25.11.2009
PL25.11.2009
RO25.11.2009
SE25.11.2009
SI25.11.2009
SK25.11.2009
BG25.02.2010
GR26.02.2010
ES08.03.2010
IS25.03.2010
PT25.03.2010
BE31.05.2010
MC31.05.2010
Former [2011/25]AT25.11.2009
CY25.11.2009
CZ25.11.2009
DK25.11.2009
EE25.11.2009
FI25.11.2009
IE25.11.2009
LT25.11.2009
LV25.11.2009
MT25.11.2009
NL25.11.2009
PL25.11.2009
RO25.11.2009
SE25.11.2009
SI25.11.2009
SK25.11.2009
BG25.02.2010
GR26.02.2010
ES08.03.2010
IS25.03.2010
PT25.03.2010
IT16.05.2010
BE31.05.2010
MC31.05.2010
Former [2010/43]AT25.11.2009
CY25.11.2009
CZ25.11.2009
DK25.11.2009
EE25.11.2009
FI25.11.2009
IE25.11.2009
LT25.11.2009
LV25.11.2009
NL25.11.2009
PL25.11.2009
RO25.11.2009
SE25.11.2009
SI25.11.2009
SK25.11.2009
BG25.02.2010
ES08.03.2010
IS25.03.2010
PT25.03.2010
Former [2010/33]AT25.11.2009
CY25.11.2009
FI25.11.2009
LT25.11.2009
LV25.11.2009
NL25.11.2009
PL25.11.2009
SE25.11.2009
SI25.11.2009
ES08.03.2010
IS25.03.2010
PT25.03.2010
Former [2010/30]AT25.11.2009
CY25.11.2009
FI25.11.2009
LT25.11.2009
LV25.11.2009
PL25.11.2009
SE25.11.2009
SI25.11.2009
IS25.03.2010
PT25.03.2010
Former [2010/28]CY25.11.2009
FI25.11.2009
LT25.11.2009
LV25.11.2009
PL25.11.2009
SE25.11.2009
SI25.11.2009
IS25.03.2010
PT25.03.2010
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.