blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2079621

EP2079621 - METHOD FOR CONTROLLING A HYBRID DRIVE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.05.2022
Database last updated on 06.07.2024
FormerThe patent has been granted
Status updated on  28.05.2021
FormerGrant of patent is intended
Status updated on  15.03.2021
FormerExamination is in progress
Status updated on  31.01.2018
Most recent event   Tooltip02.06.2023Lapse of the patent in a contracting state
New state(s): HU
published on 05.07.2023  [2023/27]
Applicant(s)For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
[2020/18]
Former [2009/30]For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
Inventor(s)01 / SCHENK, Rene
Eichenweg 7
71732 Tamm / DE
02 / KAEFER, Oliver
Tannenweg 25
71711 Murr / DE
03 / JUENEMANN, Thorsten
Beethovenstr. 9
71069 Sindelfingen / DE
 [2009/30]
Application number, filing date07788410.414.08.2007
[2009/30]
WO2007EP58390
Priority number, dateDE2006104835812.10.2006         Original published format: DE102006048358
[2009/30]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2008043593
Date:17.04.2008
Language:DE
[2008/16]
Type: A1 Application with search report 
No.:EP2079621
Date:22.07.2009
Language:DE
The application published by WIPO in one of the EPO official languages on 17.04.2008 takes the place of the publication of the European patent application.
[2009/30]
Type: B1 Patent specification 
No.:EP2079621
Date:30.06.2021
Language:DE
[2021/26]
Search report(s)International search report - published on:EP17.04.2008
ClassificationIPC:B60W20/00, B60W10/02, B60W10/06, B60W10/08, B60K6/26, B60L50/16, B60K6/48
[2021/14]
CPC:
B60K6/48 (EP,KR,US); B60W20/00 (EP,KR); B60W20/40 (US);
B60L50/16 (EP,US); B60W10/02 (EP,US); B60W10/06 (EP,US);
B60W10/08 (EP,US); B60K2006/268 (EP); B60W2050/0052 (EP);
B60W2510/0241 (EP,US); B60W2710/025 (EP,US); Y02T10/62 (EP,US);
Y02T10/70 (US); Y02T10/7072 (EP,US) (-)
Former IPC [2020/13]B60L50/16, B60K6/48, B60W10/02, B60W10/06, B60W10/08, B60W20/00
Former IPC [2009/30]B60W20/00, B60K6/48, B60W10/02, B60W10/06, B60W10/08
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2021/26]
Former [2009/30]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
RSNot yet paid
TitleGerman:VERFAHREN FÜR DIE STEUERUNG EINES HYBRIDANTRIEBS[2009/30]
English:METHOD FOR CONTROLLING A HYBRID DRIVE[2009/30]
French:PROCÉDÉ DE COMMANDE D'UN ENTRAÎNEMENT HYBRIDE[2009/30]
Entry into regional phase12.05.2009National basic fee paid 
12.05.2009Designation fee(s) paid 
12.05.2009Examination fee paid 
Examination procedure12.05.2009Examination requested  [2009/30]
19.10.2010Despatch of a communication from the examining division (Time limit: M04)
03.06.2011Reply to a communication from the examining division
22.01.2018Despatch of a communication from the examining division (Time limit: M04)
01.06.2018Reply to a communication from the examining division
02.01.2019Despatch of a communication from the examining division (Time limit: M06)
16.10.2019Reply to a communication from the examining division
09.04.2020Despatch of a communication from the examining division (Time limit: M06)
06.11.2020Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
18.01.2021Reply to a communication from the examining division
16.03.2021Communication of intention to grant the patent
14.05.2021Fee for grant paid
14.05.2021Fee for publishing/printing paid
14.05.2021Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  19.10.2010
Opposition(s)31.03.2022No opposition filed within time limit [2022/23]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
18.01.2021Request for further processing filed
18.01.2021Full payment received (date of receipt of payment)
Request granted
28.01.2021Decision despatched
The application is deemed to be withdrawn due to failure to reply to the examination report
16.10.2019Request for further processing filed
16.10.2019Full payment received (date of receipt of payment)
Request granted
24.10.2019Decision despatched
The application is deemed to be withdrawn due to failure to reply to the examination report
06.06.2011Request for further processing filed
06.06.2011Full payment received (date of receipt of payment)
Request granted
29.06.2011Decision despatched
Fees paidRenewal fee
31.08.2009Renewal fee patent year 03
31.08.2010Renewal fee patent year 04
31.08.2011Renewal fee patent year 05
31.08.2012Renewal fee patent year 06
02.09.2013Renewal fee patent year 07
01.09.2014Renewal fee patent year 08
31.08.2015Renewal fee patent year 09
31.08.2016Renewal fee patent year 10
31.08.2017Renewal fee patent year 11
31.08.2018Renewal fee patent year 12
02.09.2019Renewal fee patent year 13
31.08.2020Renewal fee patent year 14
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU14.08.2007
CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
IT30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
AT14.08.2021
IE14.08.2021
LU14.08.2021
FR30.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
BG30.09.2021
GB30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
[2023/27]
Former [2023/24]CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
IT30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
AT14.08.2021
IE14.08.2021
LU14.08.2021
FR30.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
BG30.09.2021
GB30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2023/19]CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
IT30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
AT14.08.2021
IE14.08.2021
LU14.08.2021
FR30.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
BG30.09.2021
GB30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/48]CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
IT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
AT14.08.2021
IE14.08.2021
LU14.08.2021
FR30.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
BG30.09.2021
GB30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/36]CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
IT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
IE14.08.2021
LU14.08.2021
FR30.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
BG30.09.2021
GB30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/35]CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
IE14.08.2021
LU14.08.2021
FR30.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
BG30.09.2021
GB30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/34]CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
LU14.08.2021
FR30.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
BG30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/29]CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
LU14.08.2021
CH31.08.2021
LI31.08.2021
BG30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/24]CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
SE30.06.2021
SK30.06.2021
LU14.08.2021
CH31.08.2021
LI31.08.2021
BG30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/21]CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
SE30.06.2021
SK30.06.2021
CH31.08.2021
LI31.08.2021
BG30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/18]CZ30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
SE30.06.2021
SK30.06.2021
BG30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/10]CZ30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
SE30.06.2021
SK30.06.2021
BG30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/09]CZ30.06.2021
ES30.06.2021
FI30.06.2021
LV30.06.2021
NL30.06.2021
RO30.06.2021
SE30.06.2021
SK30.06.2021
BG30.09.2021
GR01.10.2021
PT02.11.2021
Former [2022/08]CZ30.06.2021
ES30.06.2021
FI30.06.2021
LV30.06.2021
NL30.06.2021
SE30.06.2021
BG30.09.2021
GR01.10.2021
Former [2022/07]FI30.06.2021
LV30.06.2021
NL30.06.2021
SE30.06.2021
BG30.09.2021
GR01.10.2021
Former [2021/49]FI30.06.2021
LV30.06.2021
SE30.06.2021
BG30.09.2021
GR01.10.2021
Former [2021/47]FI30.06.2021
BG30.09.2021
Former [2021/46]FI30.06.2021
Cited inInternational search[X]DE19838853  (AISIN AW CO [JP]) [X] 1-9 * abstract * * column 2, line 36 - column 2, line 39 * * column 3, line 5 - column 3, line 12 * * column 3, line 42 - column 3, line 66 * * column 4, line 61 - column 4, line 65 * * column 6, line 53 - column 6, line 57 * * column 11, line 56 - column 11, line 57 * * claims 2,3,5,7-9,13-17,19,22,24,25 * * figures 1,3-11,13-16 *;
 [X]DE10316422  (LUK LAMELLEN & KUPPLUNGSBAU [DE]) [X] 1-6,8,9 * paragraphs [0016] , [0028] , [0033] , [0039] - [0042] - [0061] , [0062] , [0088] * * claims 1,5,8-16 * * figures 1-5 *;
 [X]WO2005100777  (AVL LIST GMBH [AT], et al) [X] 1-9 * abstract * * page 6, line 1 - page 6, line 11 * * page 7, line 36 - page 8, line 18 * * page 10, line 29 - page 11, line 2 * * page 20, line 30 - page 21, line 2 * * claims 1,5-7,9,16,22,23,26 * * figures 1-4,7,11,14,15,18,19,22 *;
 [PX]DE102006005468  (ZAHNRADFABRIK FRIEDRICHSHAFEN [DE]) [PX] 1-3,5-9 * abstract * * paragraphs [0037] , [0039] - [0041] - [0044] , [0052] - [0058] * * claims 2-9,14,16,17 * * figures 1,5-8 *;
 [E]EP1860012  (NISSAN MOTOR [JP]) [E] 1-3,5-9 * abstract * * paragraphs [0018] - [0021] - [0035] , [0050] , [0063] - [0068] - [0079] - [0083] - [0089] , [0093] - [0095] - [0102] - [0105] - [0111] - [0113] * * claims 3,4 ** figures 1,2,6-14 *
by applicantDE19838853
 DE10316422
 WO2005100777
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.