EP2079621 - METHOD FOR CONTROLLING A HYBRID DRIVE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.05.2022 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 28.05.2021 | ||
Former | Grant of patent is intended Status updated on 15.03.2021 | ||
Former | Examination is in progress Status updated on 31.01.2018 | Most recent event Tooltip | 02.06.2023 | Lapse of the patent in a contracting state New state(s): HU | published on 05.07.2023 [2023/27] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
Former [2009/30] | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
SCHENK, Rene Eichenweg 7 71732 Tamm / DE | 02 /
KAEFER, Oliver Tannenweg 25 71711 Murr / DE | 03 /
JUENEMANN, Thorsten Beethovenstr. 9 71069 Sindelfingen / DE | [2009/30] | Application number, filing date | 07788410.4 | 14.08.2007 | [2009/30] | WO2007EP58390 | Priority number, date | DE20061048358 | 12.10.2006 Original published format: DE102006048358 | [2009/30] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2008043593 | Date: | 17.04.2008 | Language: | DE | [2008/16] | Type: | A1 Application with search report | No.: | EP2079621 | Date: | 22.07.2009 | Language: | DE | The application published by WIPO in one of the EPO official languages on 17.04.2008 takes the place of the publication of the European patent application. | [2009/30] | Type: | B1 Patent specification | No.: | EP2079621 | Date: | 30.06.2021 | Language: | DE | [2021/26] | Search report(s) | International search report - published on: | EP | 17.04.2008 | Classification | IPC: | B60W20/00, B60W10/02, B60W10/06, B60W10/08, B60K6/26, B60L50/16, B60K6/48 | [2021/14] | CPC: |
B60K6/48 (EP,KR,US);
B60W20/00 (EP,KR);
B60W20/40 (US);
B60L50/16 (EP,US);
B60W10/02 (EP,US);
B60W10/06 (EP,US);
B60W10/08 (EP,US);
B60K2006/268 (EP);
B60W2050/0052 (EP);
B60W2510/0241 (EP,US);
B60W2710/025 (EP,US);
Y02T10/62 (EP,US);
|
Former IPC [2020/13] | B60L50/16, B60K6/48, B60W10/02, B60W10/06, B60W10/08, B60W20/00 | ||
Former IPC [2009/30] | B60W20/00, B60K6/48, B60W10/02, B60W10/06, B60W10/08 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2021/26] |
Former [2009/30] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN FÜR DIE STEUERUNG EINES HYBRIDANTRIEBS | [2009/30] | English: | METHOD FOR CONTROLLING A HYBRID DRIVE | [2009/30] | French: | PROCÉDÉ DE COMMANDE D'UN ENTRAÎNEMENT HYBRIDE | [2009/30] | Entry into regional phase | 12.05.2009 | National basic fee paid | 12.05.2009 | Designation fee(s) paid | 12.05.2009 | Examination fee paid | Examination procedure | 12.05.2009 | Examination requested [2009/30] | 19.10.2010 | Despatch of a communication from the examining division (Time limit: M04) | 03.06.2011 | Reply to a communication from the examining division | 22.01.2018 | Despatch of a communication from the examining division (Time limit: M04) | 01.06.2018 | Reply to a communication from the examining division | 02.01.2019 | Despatch of a communication from the examining division (Time limit: M06) | 16.10.2019 | Reply to a communication from the examining division | 09.04.2020 | Despatch of a communication from the examining division (Time limit: M06) | 06.11.2020 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 18.01.2021 | Reply to a communication from the examining division | 16.03.2021 | Communication of intention to grant the patent | 14.05.2021 | Fee for grant paid | 14.05.2021 | Fee for publishing/printing paid | 14.05.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.10.2010 | Opposition(s) | 31.03.2022 | No opposition filed within time limit [2022/23] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 18.01.2021 | Request for further processing filed | 18.01.2021 | Full payment received (date of receipt of payment) Request granted | 28.01.2021 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the examination report | 16.10.2019 | Request for further processing filed | 16.10.2019 | Full payment received (date of receipt of payment) Request granted | 24.10.2019 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the examination report | 06.06.2011 | Request for further processing filed | 06.06.2011 | Full payment received (date of receipt of payment) Request granted | 29.06.2011 | Decision despatched | Fees paid | Renewal fee | 31.08.2009 | Renewal fee patent year 03 | 31.08.2010 | Renewal fee patent year 04 | 31.08.2011 | Renewal fee patent year 05 | 31.08.2012 | Renewal fee patent year 06 | 02.09.2013 | Renewal fee patent year 07 | 01.09.2014 | Renewal fee patent year 08 | 31.08.2015 | Renewal fee patent year 09 | 31.08.2016 | Renewal fee patent year 10 | 31.08.2017 | Renewal fee patent year 11 | 31.08.2018 | Renewal fee patent year 12 | 02.09.2019 | Renewal fee patent year 13 | 31.08.2020 | Renewal fee patent year 14 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.08.2007 | CY | 30.06.2021 | CZ | 30.06.2021 | DK | 30.06.2021 | EE | 30.06.2021 | ES | 30.06.2021 | FI | 30.06.2021 | IT | 30.06.2021 | LT | 30.06.2021 | LV | 30.06.2021 | MC | 30.06.2021 | NL | 30.06.2021 | PL | 30.06.2021 | RO | 30.06.2021 | SE | 30.06.2021 | SI | 30.06.2021 | SK | 30.06.2021 | AT | 14.08.2021 | IE | 14.08.2021 | LU | 14.08.2021 | FR | 30.08.2021 | BE | 31.08.2021 | CH | 31.08.2021 | LI | 31.08.2021 | BG | 30.09.2021 | GB | 30.09.2021 | GR | 01.10.2021 | IS | 30.10.2021 | PT | 02.11.2021 | [2023/27] |
Former [2023/24] | CY | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
AT | 14.08.2021 | ||
IE | 14.08.2021 | ||
LU | 14.08.2021 | ||
FR | 30.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
GB | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2023/19] | CZ | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
AT | 14.08.2021 | ||
IE | 14.08.2021 | ||
LU | 14.08.2021 | ||
FR | 30.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
GB | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/48] | CZ | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
AT | 14.08.2021 | ||
IE | 14.08.2021 | ||
LU | 14.08.2021 | ||
FR | 30.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
GB | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/36] | CZ | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
IE | 14.08.2021 | ||
LU | 14.08.2021 | ||
FR | 30.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
GB | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/35] | CZ | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
IE | 14.08.2021 | ||
LU | 14.08.2021 | ||
FR | 30.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
GB | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/34] | CZ | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
LU | 14.08.2021 | ||
FR | 30.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/29] | CZ | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
LU | 14.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/24] | CZ | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
LU | 14.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/21] | CZ | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/18] | CZ | 30.06.2021 | |
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
BG | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/10] | CZ | 30.06.2021 | |
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
BG | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/09] | CZ | 30.06.2021 | |
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
BG | 30.09.2021 | ||
GR | 01.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/08] | CZ | 30.06.2021 | |
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2022/07] | FI | 30.06.2021 | |
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/49] | FI | 30.06.2021 | |
LV | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/47] | FI | 30.06.2021 | |
BG | 30.09.2021 | ||
Former [2021/46] | FI | 30.06.2021 | Cited in | International search | [X]DE19838853 (AISIN AW CO [JP]) [X] 1-9 * abstract * * column 2, line 36 - column 2, line 39 * * column 3, line 5 - column 3, line 12 * * column 3, line 42 - column 3, line 66 * * column 4, line 61 - column 4, line 65 * * column 6, line 53 - column 6, line 57 * * column 11, line 56 - column 11, line 57 * * claims 2,3,5,7-9,13-17,19,22,24,25 * * figures 1,3-11,13-16 *; | [X]DE10316422 (LUK LAMELLEN & KUPPLUNGSBAU [DE]) [X] 1-6,8,9 * paragraphs [0016] , [0028] , [0033] , [0039] - [0042] - [0061] , [0062] , [0088] * * claims 1,5,8-16 * * figures 1-5 *; | [X]WO2005100777 (AVL LIST GMBH [AT], et al) [X] 1-9 * abstract * * page 6, line 1 - page 6, line 11 * * page 7, line 36 - page 8, line 18 * * page 10, line 29 - page 11, line 2 * * page 20, line 30 - page 21, line 2 * * claims 1,5-7,9,16,22,23,26 * * figures 1-4,7,11,14,15,18,19,22 *; | [PX]DE102006005468 (ZAHNRADFABRIK FRIEDRICHSHAFEN [DE]) [PX] 1-3,5-9 * abstract * * paragraphs [0037] , [0039] - [0041] - [0044] , [0052] - [0058] * * claims 2-9,14,16,17 * * figures 1,5-8 *; | [E]EP1860012 (NISSAN MOTOR [JP]) [E] 1-3,5-9 * abstract * * paragraphs [0018] - [0021] - [0035] , [0050] , [0063] - [0068] - [0079] - [0083] - [0089] , [0093] - [0095] - [0102] - [0105] - [0111] - [0113] * * claims 3,4 ** figures 1,2,6-14 * | by applicant | DE19838853 | DE10316422 | WO2005100777 |