| EP2177060 - IMPROVEMENTS IN, OR RELATING TO, E-UTRAN AND HANDOVER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.05.2019 Database last updated on 14.03.2026 | |
| Former | The patent has been granted Status updated on 08.06.2018 | ||
| Former | Grant of patent is intended Status updated on 28.03.2018 | ||
| Former | Examination is in progress Status updated on 29.09.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2018/28] |
| Former [2010/16] | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
KAZMI, Muhammad Svartviksslingan 110, 3 tr S-167 39 Bromma / SE | 02 /
BALDEMAIR, Robert Ängkärrsgatan 3 S-171 70 Solna / SE | [2010/16] | Representative(s) | Brann AB P.O. Box 3690 Sveavägen 63 103 59 Stockholm / SE | [N/P] |
| Former [2018/28] | Brann AB P.O. Box 3690 Drottninggatan 27 103 59 Stockholm / SE | ||
| Former [2010/29] | HOFFMANN EITLE Patent- und Rechtsanwälte Arabellastrasse 4 81925 München / DE | ||
| Former [2010/16] | Kühn, Friedrich Heinrich Ericsson AB Patent Unit LTE Torshamnsgatan 23 164 80 Stockholm / SE | Application number, filing date | 07794152.4 | 10.08.2007 | [2010/16] | WO2007SE50542 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009022948 | Date: | 19.02.2009 | Language: | EN | [2009/08] | Type: | A1 Application with search report | No.: | EP2177060 | Date: | 21.04.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.02.2009 takes the place of the publication of the European patent application. | [2010/16] | Type: | B1 Patent specification | No.: | EP2177060 | Date: | 11.07.2018 | Language: | EN | [2018/28] | Search report(s) | International search report - published on: | SE | 19.02.2009 | (Supplementary) European search report - dispatched on: | EP | 20.11.2013 | Classification | IPC: | H04W36/30, // H04W74/08 | [2018/14] | CPC: |
H04W36/0077 (EP,US);
H04W52/40 (US);
H04W36/0016 (US);
H04W36/302 (EP,US);
H04W74/0833 (EP,US);
H04W74/0836 (EP,US);
H04W74/0866 (EP,US)
(-)
|
| Former IPC [2013/51] | H04W36/30, H04W4/00 | ||
| Former IPC [2010/16] | H04W4/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2018/28] |
| Former [2010/16] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | VERBESSERUNGEN IN BEZUG AUF E-UTRAN UND HANDOVER | [2010/16] | English: | IMPROVEMENTS IN, OR RELATING TO, E-UTRAN AND HANDOVER | [2010/16] | French: | AMÉLIORATIONS À UN RÉSEAU E-UTRAN, OU S'Y RAPPORTANT, ET TRANSFERT | [2010/16] | Entry into regional phase | 20.01.2010 | National basic fee paid | 20.01.2010 | Search fee paid | 20.01.2010 | Designation fee(s) paid | 20.01.2010 | Examination fee paid | Examination procedure | 20.01.2010 | Examination requested [2010/16] | 28.05.2014 | Amendment by applicant (claims and/or description) | 02.10.2017 | Despatch of a communication from the examining division (Time limit: M04) | 05.02.2018 | Reply to a communication from the examining division | 29.03.2018 | Communication of intention to grant the patent | 30.05.2018 | Fee for grant paid | 30.05.2018 | Fee for publishing/printing paid | 30.05.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 02.10.2017 | Opposition(s) | 12.04.2019 | No opposition filed within time limit [2019/25] | Fees paid | Renewal fee | 26.10.2009 | Renewal fee patent year 03 | 25.08.2010 | Renewal fee patent year 04 | 25.08.2011 | Renewal fee patent year 05 | 27.08.2012 | Renewal fee patent year 06 | 27.08.2013 | Renewal fee patent year 07 | 27.08.2014 | Renewal fee patent year 08 | 27.08.2015 | Renewal fee patent year 09 | 29.08.2016 | Renewal fee patent year 10 | 28.08.2017 | Renewal fee patent year 11 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.08.2007 | AT | 11.07.2018 | CY | 11.07.2018 | CZ | 11.07.2018 | DK | 11.07.2018 | EE | 11.07.2018 | ES | 11.07.2018 | FI | 11.07.2018 | IT | 11.07.2018 | LT | 11.07.2018 | LV | 11.07.2018 | MC | 11.07.2018 | PL | 11.07.2018 | PT | 11.07.2018 | RO | 11.07.2018 | SE | 11.07.2018 | SI | 11.07.2018 | SK | 11.07.2018 | TR | 11.07.2018 | IE | 10.08.2018 | LU | 10.08.2018 | MT | 10.08.2018 | BE | 31.08.2018 | CH | 31.08.2018 | LI | 31.08.2018 | FR | 11.09.2018 | BG | 11.10.2018 | GR | 12.10.2018 | IS | 11.11.2018 | [2020/32] |
| Former [2020/27] | HU | 10.08.2007 | |
| AT | 11.07.2018 | ||
| CZ | 11.07.2018 | ||
| DK | 11.07.2018 | ||
| EE | 11.07.2018 | ||
| ES | 11.07.2018 | ||
| FI | 11.07.2018 | ||
| IT | 11.07.2018 | ||
| LT | 11.07.2018 | ||
| LV | 11.07.2018 | ||
| MC | 11.07.2018 | ||
| PL | 11.07.2018 | ||
| PT | 11.07.2018 | ||
| RO | 11.07.2018 | ||
| SE | 11.07.2018 | ||
| SI | 11.07.2018 | ||
| SK | 11.07.2018 | ||
| TR | 11.07.2018 | ||
| IE | 10.08.2018 | ||
| LU | 10.08.2018 | ||
| MT | 10.08.2018 | ||
| BE | 31.08.2018 | ||
| CH | 31.08.2018 | ||
| LI | 31.08.2018 | ||
| FR | 11.09.2018 | ||
| BG | 11.10.2018 | ||
| GR | 12.10.2018 | ||
| IS | 11.11.2018 | ||
| Former [2020/16] | AT | 11.07.2018 | |
| CZ | 11.07.2018 | ||
| DK | 11.07.2018 | ||
| EE | 11.07.2018 | ||
| ES | 11.07.2018 | ||
| FI | 11.07.2018 | ||
| IT | 11.07.2018 | ||
| LT | 11.07.2018 | ||
| LV | 11.07.2018 | ||
| MC | 11.07.2018 | ||
| PL | 11.07.2018 | ||
| RO | 11.07.2018 | ||
| SE | 11.07.2018 | ||
| SI | 11.07.2018 | ||
| SK | 11.07.2018 | ||
| TR | 11.07.2018 | ||
| IE | 10.08.2018 | ||
| LU | 10.08.2018 | ||
| MT | 10.08.2018 | ||
| BE | 31.08.2018 | ||
| CH | 31.08.2018 | ||
| LI | 31.08.2018 | ||
| FR | 11.09.2018 | ||
| BG | 11.10.2018 | ||
| GR | 12.10.2018 | ||
| IS | 11.11.2018 | ||
| Former [2020/08] | AT | 11.07.2018 | |
| CZ | 11.07.2018 | ||
| DK | 11.07.2018 | ||
| EE | 11.07.2018 | ||
| ES | 11.07.2018 | ||
| FI | 11.07.2018 | ||
| IT | 11.07.2018 | ||
| LT | 11.07.2018 | ||
| LV | 11.07.2018 | ||
| MC | 11.07.2018 | ||
| PL | 11.07.2018 | ||
| RO | 11.07.2018 | ||
| SE | 11.07.2018 | ||
| SI | 11.07.2018 | ||
| SK | 11.07.2018 | ||
| IE | 10.08.2018 | ||
| LU | 10.08.2018 | ||
| MT | 10.08.2018 | ||
| BE | 31.08.2018 | ||
| CH | 31.08.2018 | ||
| LI | 31.08.2018 | ||
| FR | 11.09.2018 | ||
| BG | 11.10.2018 | ||
| GR | 12.10.2018 | ||
| IS | 11.11.2018 | ||
| Former [2019/38] | AT | 11.07.2018 | |
| CZ | 11.07.2018 | ||
| DK | 11.07.2018 | ||
| EE | 11.07.2018 | ||
| ES | 11.07.2018 | ||
| FI | 11.07.2018 | ||
| IT | 11.07.2018 | ||
| LT | 11.07.2018 | ||
| LV | 11.07.2018 | ||
| MC | 11.07.2018 | ||
| PL | 11.07.2018 | ||
| RO | 11.07.2018 | ||
| SE | 11.07.2018 | ||
| SI | 11.07.2018 | ||
| SK | 11.07.2018 | ||
| IE | 10.08.2018 | ||
| LU | 10.08.2018 | ||
| BE | 31.08.2018 | ||
| CH | 31.08.2018 | ||
| LI | 31.08.2018 | ||
| FR | 11.09.2018 | ||
| BG | 11.10.2018 | ||
| GR | 12.10.2018 | ||
| IS | 11.11.2018 | ||
| Former [2019/37] | AT | 11.07.2018 | |
| CZ | 11.07.2018 | ||
| DK | 11.07.2018 | ||
| EE | 11.07.2018 | ||
| ES | 11.07.2018 | ||
| FI | 11.07.2018 | ||
| IT | 11.07.2018 | ||
| LT | 11.07.2018 | ||
| LV | 11.07.2018 | ||
| MC | 11.07.2018 | ||
| PL | 11.07.2018 | ||
| RO | 11.07.2018 | ||
| SE | 11.07.2018 | ||
| SI | 11.07.2018 | ||
| SK | 11.07.2018 | ||
| IE | 10.08.2018 | ||
| LU | 10.08.2018 | ||
| CH | 31.08.2018 | ||
| LI | 31.08.2018 | ||
| BG | 11.10.2018 | ||
| GR | 12.10.2018 | ||
| IS | 11.11.2018 | ||
| Former [2019/33] | AT | 11.07.2018 | |
| CZ | 11.07.2018 | ||
| DK | 11.07.2018 | ||
| EE | 11.07.2018 | ||
| ES | 11.07.2018 | ||
| FI | 11.07.2018 | ||
| IT | 11.07.2018 | ||
| LT | 11.07.2018 | ||
| LV | 11.07.2018 | ||
| MC | 11.07.2018 | ||
| PL | 11.07.2018 | ||
| RO | 11.07.2018 | ||
| SE | 11.07.2018 | ||
| SK | 11.07.2018 | ||
| IE | 10.08.2018 | ||
| LU | 10.08.2018 | ||
| CH | 31.08.2018 | ||
| LI | 31.08.2018 | ||
| BG | 11.10.2018 | ||
| GR | 12.10.2018 | ||
| IS | 11.11.2018 | ||
| Former [2019/26] | AT | 11.07.2018 | |
| CZ | 11.07.2018 | ||
| DK | 11.07.2018 | ||
| EE | 11.07.2018 | ||
| ES | 11.07.2018 | ||
| FI | 11.07.2018 | ||
| IT | 11.07.2018 | ||
| LT | 11.07.2018 | ||
| LV | 11.07.2018 | ||
| MC | 11.07.2018 | ||
| PL | 11.07.2018 | ||
| RO | 11.07.2018 | ||
| SE | 11.07.2018 | ||
| SK | 11.07.2018 | ||
| LU | 10.08.2018 | ||
| CH | 31.08.2018 | ||
| LI | 31.08.2018 | ||
| BG | 11.10.2018 | ||
| GR | 12.10.2018 | ||
| IS | 11.11.2018 | ||
| Former [2019/24] | AT | 11.07.2018 | |
| CZ | 11.07.2018 | ||
| EE | 11.07.2018 | ||
| ES | 11.07.2018 | ||
| FI | 11.07.2018 | ||
| IT | 11.07.2018 | ||
| LT | 11.07.2018 | ||
| LV | 11.07.2018 | ||
| MC | 11.07.2018 | ||
| PL | 11.07.2018 | ||
| RO | 11.07.2018 | ||
| SE | 11.07.2018 | ||
| SK | 11.07.2018 | ||
| LU | 10.08.2018 | ||
| CH | 31.08.2018 | ||
| LI | 31.08.2018 | ||
| BG | 11.10.2018 | ||
| GR | 12.10.2018 | ||
| IS | 11.11.2018 | ||
| Former [2019/22] | AT | 11.07.2018 | |
| CZ | 11.07.2018 | ||
| ES | 11.07.2018 | ||
| FI | 11.07.2018 | ||
| IT | 11.07.2018 | ||
| LT | 11.07.2018 | ||
| LV | 11.07.2018 | ||
| PL | 11.07.2018 | ||
| RO | 11.07.2018 | ||
| SE | 11.07.2018 | ||
| LU | 10.08.2018 | ||
| CH | 31.08.2018 | ||
| LI | 31.08.2018 | ||
| BG | 11.10.2018 | ||
| GR | 12.10.2018 | ||
| IS | 11.11.2018 | ||
| Former [2019/21] | AT | 11.07.2018 | |
| ES | 11.07.2018 | ||
| FI | 11.07.2018 | ||
| IT | 11.07.2018 | ||
| LT | 11.07.2018 | ||
| LV | 11.07.2018 | ||
| PL | 11.07.2018 | ||
| SE | 11.07.2018 | ||
| LU | 10.08.2018 | ||
| CH | 31.08.2018 | ||
| LI | 31.08.2018 | ||
| BG | 11.10.2018 | ||
| GR | 12.10.2018 | ||
| IS | 11.11.2018 | ||
| Former [2019/13] | AT | 11.07.2018 | |
| ES | 11.07.2018 | ||
| FI | 11.07.2018 | ||
| LT | 11.07.2018 | ||
| LV | 11.07.2018 | ||
| PL | 11.07.2018 | ||
| SE | 11.07.2018 | ||
| BG | 11.10.2018 | ||
| GR | 12.10.2018 | ||
| IS | 11.11.2018 | ||
| Former [2019/10] | AT | 11.07.2018 | |
| FI | 11.07.2018 | ||
| LT | 11.07.2018 | ||
| PL | 11.07.2018 | ||
| SE | 11.07.2018 | ||
| BG | 11.10.2018 | ||
| GR | 12.10.2018 | ||
| IS | 11.11.2018 | ||
| Former [2019/08] | FI | 11.07.2018 | |
| LT | 11.07.2018 | ||
| IS | 11.11.2018 | ||
| Former [2019/07] | LT | 11.07.2018 | Documents cited: | Search | [XI] FUJITSU: "Random Access for less-contention-based handover", 3GPP TSG-RAN-WG1 MEETING #46BIS, 3GPP TSG-RAN-WG2 MEETING #55, SEOUL, KOREA,, vol. R1-062893, R1-062886, 9 October 2006 (2006-10-09), pages 1 - 9, XP003022788 [X] 1,2,4,5,7-9 * UE receives RACH parameters of the target node via the source node prior to handover; target node provides in advance a sequence index based on the CAZAC sequence; paragraph [0004] - paragraph [0005] *[I] 3,6 | [XI] TEXAS INSTRUMENTS INC: "A Pre-synchronization method for E-UTRA Handovers", 3GPP DRAFT; R2-072506_PRESYNCH_METHOD_FOR_E_UTRA_HO_TI, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Orlando, USA; 20070622, 22 June 2007 (2007-06-22), XP050135325 [X] 1,2,4,5,7-9 * paragraph [0001] * * Transmission of RACH parameters of the target node to the UE by the source node prior to handover to said target node; use of reserved HO signatures; paragraph [0003] - paragraph [03.1] *[I] 3,6 | [A] 3RD GENERATION PARTNERSHIP PROJECT ET AL: "3GPP TS 36.300 V8.1.0 (2007-06); Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN); Overall description; Stage 2 (Release 8)", INTERNET CITATION, June 2007 (2007-06-01), XP002468452, Retrieved from the Internet | [A] "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Physical layer procedures (Release 8)", 3RD GENERATION PARTNERSHIP PROJECT (3GPP); TECHNICAL SPECIFICATION (TS),, no. 3GPP TS 6.213 V1.2.0, 1 May 2007 (2007-05-01), pages 1 - 10, XP003022789 [A] 1,5,7-9 * Zadoff-Chu root sequense index used for RACH; paragraph [0006] * | International search | [X] FUJITSU: "Random Access for less-contention-based handover", 3GPP TSG-RAN-WG1 MEETING #46BIS, 3GPP TSG-RAN-WG2 MEETING #55, SEOUL, KOREA, vol. R1-062893, R1-062886, 9 October 2006 (2006-10-09) - 13 October 2006 (2006-10-13), XP003022788, Retrieved from the Internet | [A] "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Physical layer procedures (Release 8)", 3GPP TS 6.213 V1.2.0, May 2007 (2007-05-01), XP003022789, Retrieved from the Internet | [A] "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN); Overall description; Stage 2 (Release 8)", 3GPP TS 36.300 V8.1.0, June 2007 (2007-06-01), XP002468452, Retrieved from the Internet | [A] SIEMENS: "Power Control for E-UTRA Random Access and TP", 3GPP TSG-RAN WG1 #44BIS, ATHENS, GREECE, vol. R1-061041, 27 March 2006 (2006-03-27) - 31 March 2006 (2006-03-31), XP003022790, Retrieved from the Internet | [A] "3rd Generation Partnership Project; Technical Specification Group Radio Access Ntework; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN); Radio interface protocol aspects (Release 7)", 3GPP TR 25.813 V7.0.0, June 2006 (2006-06-01), XP002426125, Retrieved from the Internet | [A] TEXAS INSTRUMENTS: "Random Access Preamble L1 Parameters in E-UTRA", 3GPP TS RAN WG1 #49BIS, ORLANDO, USA, vol. R1-072838, 25 June 2007 (2007-06-25) - 29 June 2007 (2007-06-29), XP003022791, Retrieved from the Internet | Examination | ALCATEL-LUCENT: "Power Control for RACH", 3GPP DRAFT; R1-073063, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Orlando, USA; 20070620, 20 June 2007 (2007-06-20), XP050106719 [X] 1,2,4,5,7-9 * UE receives RACH parameters of the target node via the source node prior to handover; target node provides in advance a sequence index based on the CAZAC sequence; paragraph [0004] - paragraph [0005] * [I] 3,6 | TEXAS INSTRUMENTS: "Random Access Preamble L1 Parameters in E-UTRA", 3RD GENERATION PARTNERSHIP PROJECT (3GPP); TECHNICAL SPECIFICATION GROUP (TSG) RADIO ACCESS NETWORK (RAN); WORKINGGROUP 1 (WG1), XX, XX,, vol. R1-072838, no. 3GPP TS RAN WG1 #49BIS, ORLANDO, USA, 25 June 2007 (2007-06-25), pages 1 - 5, XP003022791 [X] 1,2,4,5,7-9 * paragraph [0001] * * Transmission of RACH parameters of the target node to the UE by the source node prior to handover to said target node; use of reserved HO signatures; paragraph [0003] - paragraph [03.1] *[I] 3,6 |