EP2060144 - DYNAMIC RESOURCE ALLOCATION, SCHEDULING AND SIGNALLING FOR VARIABLE DATA RATE SERVICE IN LTE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.10.2011 Database last updated on 20.12.2024 | Most recent event Tooltip | 04.10.2013 | Lapse of the patent in a contracting state New state(s): HU | published on 06.11.2013 [2013/45] | Applicant(s) | For all designated states InterDigital Technology Corporation Concord Plaza, Suite 105 Hagley Building 3411 Silverside Road Wilmington, DE 19810 / US | [N/P] |
Former [2009/21] | For all designated states Interdigital Technology Corporation Concord Plaza, Suite 105 Hagley Building 3411 Silverside Road Wilmington, DE 19810 / US | Inventor(s) | 01 /
WANG, Jin 34 Fairlawn Drive Central Islip, New York 11722 / US | 02 /
SAMMOUR, Mohammed 2555 Modugno, Apt. 705 Montreal, Québec H4R 2L5 / CA | 03 /
CHANDRA, Arty 31 Jeffrey Place Manhasset Hills, New York 11040 / US | [2009/21] | Representative(s) | Hjalmarsson, Magnus Axel Awapatent AB Box 5117 200 71 Malmö / SE | [N/P] |
Former [2009/21] | Hjalmarsson, Magnus Axel Awapatent AB, Box 5117 200 71 Malmö / SE | Application number, filing date | 07811443.6 | 20.08.2007 | [2009/21] | WO2007US18440 | Priority number, date | US20060839110P | 21.08.2006 Original published format: US 839110 P | [2009/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2008024321 | Date: | 28.02.2008 | Language: | EN | [2008/09] | Type: | A2 Application without search report | No.: | EP2060144 | Date: | 20.05.2009 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.02.2008 takes the place of the publication of the European patent application. | [2009/21] | Type: | B1 Patent specification | No.: | EP2060144 | Date: | 01.12.2010 | Language: | EN | [2010/48] | Search report(s) | International search report - published on: | EP | 29.05.2008 | Classification | IPC: | H04W4/00 | [2009/22] | CPC: |
H04L47/15 (EP,BR,US);
H04W72/543 (EP,BR,KR,US);
H04B1/713 (EP,BR,US);
H04L1/18 (US);
H04L1/1822 (EP,BR,US);
H04L1/1896 (EP,BR,US);
H04L47/70 (EP,BR,US);
H04L47/762 (EP,BR,US);
H04L47/824 (EP,BR,US);
H04L5/0007 (US);
H04L5/003 (EP,US);
H04L5/0064 (EP,BR,KR,US);
H04L5/0094 (EP,BR,US);
H04L5/0096 (EP,BR,US);
H04W72/0446 (US);
H04W72/23 (KR)
(-)
|
Former IPC [2009/21] | H04Q7/38 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2009/21] | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | DYNAMISCHE BETRIEBSMITTELZUTEILUNG, ABLAUFPLANUNG UND SIGNALISIERUNG FÜR EINEN DIENST MIT VARIABLER DATENRATE BEI LTE | [2009/21] | English: | DYNAMIC RESOURCE ALLOCATION, SCHEDULING AND SIGNALLING FOR VARIABLE DATA RATE SERVICE IN LTE | [2009/21] | French: | ALLOCATION DE RESSOURCES DYNAMIQUE, ORDONNANCEMENT ET SIGNALISATION POUR UN SERVICE À DÉBIT DE DONNÉES VARIABLE DANS DES SYSTÈMES LTE | [2009/21] | Entry into regional phase | 19.03.2009 | National basic fee paid | 19.03.2009 | Designation fee(s) paid | 19.03.2009 | Examination fee paid | Examination procedure | 17.07.2008 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 19.03.2009 | Examination requested [2009/21] | 14.05.2009 | Amendment by applicant (claims and/or description) | 20.07.2009 | Despatch of a communication from the examining division (Time limit: M04) | 20.11.2009 | Reply to a communication from the examining division | 30.03.2010 | Despatch of a communication from the examining division (Time limit: M02) | 31.03.2010 | Reply to a communication from the examining division | 10.06.2010 | Communication of intention to grant the patent | 19.10.2010 | Fee for grant paid | 19.10.2010 | Fee for publishing/printing paid | Divisional application(s) | EP10188095.3 / EP2271165 | EP11174664.0 / EP2381728 | EP11174665.7 / EP2381729 | EP14177571.8 / EP2800435 | EP17159349.4 / EP3200537 | EP19182116.4 / EP3565360 | EP21183602.8 | Opposition(s) | 02.09.2011 | No opposition filed within time limit [2011/45] | Fees paid | Renewal fee | 12.08.2009 | Renewal fee patent year 03 | 17.08.2010 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 01.12.2010 | BE | 01.12.2010 | CY | 01.12.2010 | CZ | 01.12.2010 | EE | 01.12.2010 | HU | 01.12.2010 | LT | 01.12.2010 | LV | 01.12.2010 | MT | 01.12.2010 | RO | 01.12.2010 | SI | 01.12.2010 | SK | 01.12.2010 | TR | 01.12.2010 | BG | 01.03.2011 | GR | 02.03.2011 | IS | 01.04.2011 | PT | 01.04.2011 | LU | 20.08.2011 | CH | 31.08.2011 | LI | 31.08.2011 | MC | 31.08.2011 | [2013/45] |
Former [2013/44] | AT | 01.12.2010 | |
BE | 01.12.2010 | ||
CY | 01.12.2010 | ||
CZ | 01.12.2010 | ||
EE | 01.12.2010 | ||
LT | 01.12.2010 | ||
LV | 01.12.2010 | ||
MT | 01.12.2010 | ||
RO | 01.12.2010 | ||
SI | 01.12.2010 | ||
SK | 01.12.2010 | ||
TR | 01.12.2010 | ||
BG | 01.03.2011 | ||
GR | 02.03.2011 | ||
IS | 01.04.2011 | ||
PT | 01.04.2011 | ||
LU | 20.08.2011 | ||
CH | 31.08.2011 | ||
LI | 31.08.2011 | ||
MC | 31.08.2011 | ||
Former [2013/25] | AT | 01.12.2010 | |
BE | 01.12.2010 | ||
CY | 01.12.2010 | ||
CZ | 01.12.2010 | ||
EE | 01.12.2010 | ||
LT | 01.12.2010 | ||
LV | 01.12.2010 | ||
MT | 01.12.2010 | ||
RO | 01.12.2010 | ||
SI | 01.12.2010 | ||
SK | 01.12.2010 | ||
BG | 01.03.2011 | ||
GR | 02.03.2011 | ||
IS | 01.04.2011 | ||
PT | 01.04.2011 | ||
LU | 20.08.2011 | ||
CH | 31.08.2011 | ||
LI | 31.08.2011 | ||
MC | 31.08.2011 | ||
Former [2012/20] | AT | 01.12.2010 | |
BE | 01.12.2010 | ||
CY | 01.12.2010 | ||
CZ | 01.12.2010 | ||
EE | 01.12.2010 | ||
LT | 01.12.2010 | ||
LV | 01.12.2010 | ||
MT | 01.12.2010 | ||
RO | 01.12.2010 | ||
SI | 01.12.2010 | ||
SK | 01.12.2010 | ||
BG | 01.03.2011 | ||
GR | 02.03.2011 | ||
IS | 01.04.2011 | ||
PT | 01.04.2011 | ||
CH | 31.08.2011 | ||
LI | 31.08.2011 | ||
MC | 31.08.2011 | ||
Former [2012/18] | AT | 01.12.2010 | |
BE | 01.12.2010 | ||
CY | 01.12.2010 | ||
CZ | 01.12.2010 | ||
EE | 01.12.2010 | ||
LT | 01.12.2010 | ||
LV | 01.12.2010 | ||
MT | 01.12.2010 | ||
RO | 01.12.2010 | ||
SI | 01.12.2010 | ||
SK | 01.12.2010 | ||
BG | 01.03.2011 | ||
GR | 02.03.2011 | ||
IS | 01.04.2011 | ||
PT | 01.04.2011 | ||
MC | 31.08.2011 | ||
Former [2012/05] | AT | 01.12.2010 | |
BE | 01.12.2010 | ||
CY | 01.12.2010 | ||
CZ | 01.12.2010 | ||
EE | 01.12.2010 | ||
LT | 01.12.2010 | ||
LV | 01.12.2010 | ||
MT | 01.12.2010 | ||
RO | 01.12.2010 | ||
SI | 01.12.2010 | ||
SK | 01.12.2010 | ||
BG | 01.03.2011 | ||
GR | 02.03.2011 | ||
IS | 01.04.2011 | ||
PT | 01.04.2011 | ||
Former [2011/37] | AT | 01.12.2010 | |
BE | 01.12.2010 | ||
CY | 01.12.2010 | ||
CZ | 01.12.2010 | ||
EE | 01.12.2010 | ||
LT | 01.12.2010 | ||
LV | 01.12.2010 | ||
RO | 01.12.2010 | ||
SI | 01.12.2010 | ||
SK | 01.12.2010 | ||
BG | 01.03.2011 | ||
GR | 02.03.2011 | ||
IS | 01.04.2011 | ||
PT | 01.04.2011 | ||
Former [2011/35] | AT | 01.12.2010 | |
BE | 01.12.2010 | ||
CY | 01.12.2010 | ||
CZ | 01.12.2010 | ||
EE | 01.12.2010 | ||
LT | 01.12.2010 | ||
LV | 01.12.2010 | ||
SI | 01.12.2010 | ||
BG | 01.03.2011 | ||
GR | 02.03.2011 | ||
IS | 01.04.2011 | ||
PT | 01.04.2011 | ||
Former [2011/34] | AT | 01.12.2010 | |
BE | 01.12.2010 | ||
CY | 01.12.2010 | ||
LT | 01.12.2010 | ||
LV | 01.12.2010 | ||
SI | 01.12.2010 | ||
BG | 01.03.2011 | ||
GR | 02.03.2011 | ||
PT | 01.04.2011 | ||
Former [2011/29] | AT | 01.12.2010 | |
CY | 01.12.2010 | ||
LT | 01.12.2010 | ||
LV | 01.12.2010 | ||
SI | 01.12.2010 | ||
BG | 01.03.2011 | ||
GR | 02.03.2011 | Cited in | International search | [X]WO2006019267 (SAMSUNG ELECTRONICS CO LTD [KR], et al); | [PX]EP1718010 (SAMSUNG ELECTRONICS CO LTD [KR]); |