EP2198352 - METHOD FOR CONFIGURING AN ARRANGEMENT FOR PROTECTING CONTROLLING OR MONITORING AN ELECTRICAL SWITCH OR POWER SUPPLY GEAR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.04.2012 Database last updated on 02.11.2024 | Most recent event Tooltip | 04.10.2013 | Lapse of the patent in a contracting state New state(s): HU | published on 06.11.2013 [2013/45] | Applicant(s) | For all designated states Siemens Aktiengesellschaft Wittelsbacherplatz 2 80333 München / DE | [2010/25] | Inventor(s) | 01 /
DUFAURE, Thierry Boddinstr. 46 12053 Berlin / DE | [2010/25] | Application number, filing date | 07819223.4 | 12.10.2007 | [2010/25] | WO2007EP09160 | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2009049656 | Date: | 23.04.2009 | Language: | DE | [2009/17] | Type: | A1 Application with search report | No.: | EP2198352 | Date: | 23.06.2010 | Language: | DE | The application published by WIPO in one of the EPO official languages on 23.04.2009 takes the place of the publication of the European patent application. | [2010/25] | Type: | B1 Patent specification | No.: | EP2198352 | Date: | 08.06.2011 | Language: | DE | [2011/23] | Search report(s) | International search report - published on: | EP | 23.04.2009 | Classification | IPC: | G05B19/418 | [2010/25] | CPC: |
G05B19/41845 (EP,US);
G05B19/4185 (EP,US);
G05B2219/31103 (EP,US);
G05B2219/33125 (EP,US);
Y02P90/02 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2010/25] | Title | German: | VERFAHREN ZUM KONFIGURIEREN EINER ANORDNUNG ZUM SCHÜTZEN, STEUERN ODER ÜBERWACHEN EINER ELEKTRISCHEN SCHALT- ODER ENERGIEVERSORGUNGSANLAGE | [2010/25] | English: | METHOD FOR CONFIGURING AN ARRANGEMENT FOR PROTECTING CONTROLLING OR MONITORING AN ELECTRICAL SWITCH OR POWER SUPPLY GEAR | [2010/25] | French: | PROCÉDÉ DE CONFIGURATION D'UN ENSEMBLE DESTINÉ À PROTÉGER, À COMMANDER OU À SURVEILLER UNE INSTALLATION D'ALIMENTATION EN ÉNERGIE ÉLECTRIQUE OU DE COMMUTATION ÉLECTRIQUE | [2010/25] | Entry into regional phase | 30.03.2010 | National basic fee paid | 30.03.2010 | Designation fee(s) paid | 30.03.2010 | Examination fee paid | Examination procedure | 30.03.2010 | Examination requested [2010/25] | 20.12.2010 | Communication of intention to grant the patent | 18.04.2011 | Fee for grant paid | 18.04.2011 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 20.12.2010 | Opposition(s) | 09.03.2012 | No opposition filed within time limit [2012/20] | Fees paid | Renewal fee | 19.04.2010 | Renewal fee patent year 03 | 18.10.2010 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 08.06.2011 | CZ | 08.06.2011 | DK | 08.06.2011 | EE | 08.06.2011 | FI | 08.06.2011 | HU | 08.06.2011 | IE | 08.06.2011 | LT | 08.06.2011 | LV | 08.06.2011 | MT | 08.06.2011 | NL | 08.06.2011 | PL | 08.06.2011 | RO | 08.06.2011 | SE | 08.06.2011 | SI | 08.06.2011 | SK | 08.06.2011 | TR | 08.06.2011 | BG | 08.09.2011 | GR | 09.09.2011 | ES | 19.09.2011 | IS | 08.10.2011 | PT | 10.10.2011 | LU | 12.10.2011 | BE | 31.10.2011 | CH | 31.10.2011 | LI | 31.10.2011 | MC | 31.10.2011 | [2013/45] |
Former [2013/44] | CY | 08.06.2011 | |
CZ | 08.06.2011 | ||
DK | 08.06.2011 | ||
EE | 08.06.2011 | ||
FI | 08.06.2011 | ||
IE | 08.06.2011 | ||
LT | 08.06.2011 | ||
LV | 08.06.2011 | ||
MT | 08.06.2011 | ||
NL | 08.06.2011 | ||
PL | 08.06.2011 | ||
RO | 08.06.2011 | ||
SE | 08.06.2011 | ||
SI | 08.06.2011 | ||
SK | 08.06.2011 | ||
TR | 08.06.2011 | ||
BG | 08.09.2011 | ||
GR | 09.09.2011 | ||
ES | 19.09.2011 | ||
IS | 08.10.2011 | ||
PT | 10.10.2011 | ||
LU | 12.10.2011 | ||
BE | 31.10.2011 | ||
CH | 31.10.2011 | ||
LI | 31.10.2011 | ||
MC | 31.10.2011 | ||
Former [2013/29] | CY | 08.06.2011 | |
CZ | 08.06.2011 | ||
DK | 08.06.2011 | ||
EE | 08.06.2011 | ||
FI | 08.06.2011 | ||
IE | 08.06.2011 | ||
LT | 08.06.2011 | ||
LV | 08.06.2011 | ||
MT | 08.06.2011 | ||
NL | 08.06.2011 | ||
PL | 08.06.2011 | ||
RO | 08.06.2011 | ||
SE | 08.06.2011 | ||
SI | 08.06.2011 | ||
SK | 08.06.2011 | ||
BG | 08.09.2011 | ||
GR | 09.09.2011 | ||
ES | 19.09.2011 | ||
IS | 08.10.2011 | ||
PT | 10.10.2011 | ||
LU | 12.10.2011 | ||
BE | 31.10.2011 | ||
CH | 31.10.2011 | ||
LI | 31.10.2011 | ||
MC | 31.10.2011 | ||
Former [2013/25] | CY | 08.06.2011 | |
CZ | 08.06.2011 | ||
DK | 08.06.2011 | ||
EE | 08.06.2011 | ||
FI | 08.06.2011 | ||
IE | 08.06.2011 | ||
LT | 08.06.2011 | ||
LV | 08.06.2011 | ||
MT | 08.06.2011 | ||
NL | 08.06.2011 | ||
PL | 08.06.2011 | ||
RO | 08.06.2011 | ||
SE | 08.06.2011 | ||
SI | 08.06.2011 | ||
SK | 08.06.2011 | ||
GR | 09.09.2011 | ||
ES | 19.09.2011 | ||
IS | 08.10.2011 | ||
PT | 10.10.2011 | ||
LU | 12.10.2011 | ||
BE | 31.10.2011 | ||
CH | 31.10.2011 | ||
LI | 31.10.2011 | ||
MC | 31.10.2011 | ||
Former [2013/14] | CY | 08.06.2011 | |
CZ | 08.06.2011 | ||
DK | 08.06.2011 | ||
EE | 08.06.2011 | ||
FI | 08.06.2011 | ||
IE | 08.06.2011 | ||
LT | 08.06.2011 | ||
LV | 08.06.2011 | ||
MT | 08.06.2011 | ||
NL | 08.06.2011 | ||
PL | 08.06.2011 | ||
RO | 08.06.2011 | ||
SE | 08.06.2011 | ||
SI | 08.06.2011 | ||
SK | 08.06.2011 | ||
GR | 09.09.2011 | ||
ES | 19.09.2011 | ||
IS | 08.10.2011 | ||
PT | 10.10.2011 | ||
BE | 31.10.2011 | ||
CH | 31.10.2011 | ||
LI | 31.10.2011 | ||
MC | 31.10.2011 | ||
Former [2012/34] | CY | 08.06.2011 | |
CZ | 08.06.2011 | ||
DK | 08.06.2011 | ||
EE | 08.06.2011 | ||
FI | 08.06.2011 | ||
IE | 08.06.2011 | ||
LT | 08.06.2011 | ||
LV | 08.06.2011 | ||
NL | 08.06.2011 | ||
PL | 08.06.2011 | ||
RO | 08.06.2011 | ||
SE | 08.06.2011 | ||
SI | 08.06.2011 | ||
SK | 08.06.2011 | ||
GR | 09.09.2011 | ||
ES | 19.09.2011 | ||
IS | 08.10.2011 | ||
PT | 10.10.2011 | ||
BE | 31.10.2011 | ||
CH | 31.10.2011 | ||
LI | 31.10.2011 | ||
MC | 31.10.2011 | ||
Former [2012/31] | CY | 08.06.2011 | |
CZ | 08.06.2011 | ||
DK | 08.06.2011 | ||
EE | 08.06.2011 | ||
FI | 08.06.2011 | ||
IE | 08.06.2011 | ||
LT | 08.06.2011 | ||
LV | 08.06.2011 | ||
NL | 08.06.2011 | ||
PL | 08.06.2011 | ||
RO | 08.06.2011 | ||
SE | 08.06.2011 | ||
SI | 08.06.2011 | ||
SK | 08.06.2011 | ||
GR | 09.09.2011 | ||
ES | 19.09.2011 | ||
IS | 08.10.2011 | ||
PT | 10.10.2011 | ||
MC | 31.10.2011 | ||
Former [2012/25] | CY | 08.06.2011 | |
CZ | 08.06.2011 | ||
EE | 08.06.2011 | ||
FI | 08.06.2011 | ||
IE | 08.06.2011 | ||
LT | 08.06.2011 | ||
LV | 08.06.2011 | ||
NL | 08.06.2011 | ||
PL | 08.06.2011 | ||
RO | 08.06.2011 | ||
SE | 08.06.2011 | ||
SI | 08.06.2011 | ||
SK | 08.06.2011 | ||
GR | 09.09.2011 | ||
ES | 19.09.2011 | ||
IS | 08.10.2011 | ||
PT | 10.10.2011 | ||
MC | 31.10.2011 | ||
Former [2012/12] | CY | 08.06.2011 | |
CZ | 08.06.2011 | ||
EE | 08.06.2011 | ||
FI | 08.06.2011 | ||
IE | 08.06.2011 | ||
LT | 08.06.2011 | ||
LV | 08.06.2011 | ||
NL | 08.06.2011 | ||
PL | 08.06.2011 | ||
RO | 08.06.2011 | ||
SE | 08.06.2011 | ||
SI | 08.06.2011 | ||
SK | 08.06.2011 | ||
GR | 09.09.2011 | ||
ES | 19.09.2011 | ||
IS | 08.10.2011 | ||
PT | 10.10.2011 | ||
Former [2012/02] | CY | 08.06.2011 | |
FI | 08.06.2011 | ||
LT | 08.06.2011 | ||
LV | 08.06.2011 | ||
NL | 08.06.2011 | ||
SE | 08.06.2011 | ||
SI | 08.06.2011 | ||
GR | 09.09.2011 | ||
ES | 19.09.2011 | ||
Former [2011/50] | CY | 08.06.2011 | |
FI | 08.06.2011 | ||
LT | 08.06.2011 | ||
LV | 08.06.2011 | ||
SE | 08.06.2011 | ||
SI | 08.06.2011 | ||
GR | 09.09.2011 | ||
ES | 19.09.2011 | ||
Former [2011/49] | CY | 08.06.2011 | |
FI | 08.06.2011 | ||
LT | 08.06.2011 | ||
SE | 08.06.2011 | ||
GR | 09.09.2011 | ||
ES | 19.09.2011 | ||
Former [2011/48] | LT | 08.06.2011 | |
SE | 08.06.2011 | Cited in | International search | [A]WO2006060371 (ABB RESEARCH LTD [CH], et al) [A] 1-14 * the whole document *; | [A] - VICTOR FLORES ET AL, "Case Study: Design and Implementation of IEC 61850 From Multiple Vendors at CFE La Venta II", CFE/SEL, (20070406), pages 1 - 14, XP002469904 [A] 1-14 * the whole document * | [A] - CRISPINO F ET AL, "An experiment using an object-oriented standard-IEC 61850 to integrate IEDs systems in substations", TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXPOSITION: LATIN AMERICA, 2004 IEEE/PES SAO PAULO, BRAZIL 8-11 NOV. 2004, PISCATAWAY, NJ, USA,IEEE, US, (20041108), ISBN 0-7803-8775-9, pages 22 - 27, XP010799829 [A] 1-14 * the whole document * DOI: http://dx.doi.org/10.1109/TDC.2004.1432345 | [A] - HOGA C ET AL, "IEC 61850: open communication in practice in substations", POWER SYSTEMS CONFERENCE AND EXPOSITION, 2004. IEEE PES NEW YORK CITY, NY, USA 10-13 OCT. 2004, PISCATAWAY, NJ, USA,IEEE, (20041010), ISBN 0-7803-8718-X, pages 1531 - 1536, XP010787994 [A] 1-14 * the whole document * DOI: http://dx.doi.org/10.1109/PSCE.2004.1397694 | [A] - SCHNEIDER ELECTRIC, "Sepam series 20,40,80; IEC 61850 communication", USER'S MANUAL, France, (200705), pages 1 - 72, XP002469905 [A] 1-14 * the whole document * | by applicant | WO2006060371 |