EP2066719 - POLYLACTIDE-URETHANE COPOLYMERS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.12.2019 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 18.01.2019 | ||
Former | Grant of patent is intended Status updated on 16.08.2018 | ||
Former | Examination is in progress Status updated on 12.02.2018 | Most recent event Tooltip | 23.07.2021 | Lapse of the patent in a contracting state New state(s): MT | published on 25.08.2021 [2021/34] | Applicant(s) | For all designated states Total Research & Technology Feluy SA Zone Industrielle Feluy C 7181 Seneffe / BE | [2019/08] |
Former [2009/24] | For all designated states Futerro S.A. Place d'Escanaffles, 23 7760 Escanaffles / BE | Inventor(s) | 01 /
DUBOIS, Philippe Rue Grande 1 4260 Ciplet / BE | 02 /
COSZACH, Philippe Place d'Escanaffles 23 7760 Escanaffles / BE | 03 /
VENDRELL, Gloria Clos des Acacias 13 1150 Bruxelles / BE | 04 /
DEGEE, Philippe Rue du Petit Villerot 266 7334 Hautrage / BE | 05 /
ALEXANDRE, Michaël Rue de la Jacinthe 10 4102 Ougree / BE | 06 /
BARAKAT, Ibrahim Av. Jules de Trooz 51 1150 Wolume-St-Pierre / BE | 07 /
RAQUEZ, Jean Marie Chemin de la Vallière 59 7000 Mons / BE | [2009/24] | Representative(s) | Raboin, Jean-Christophe, et al Total Research & Technology Feluy Zone Industrielle C 7181 Seneffe / BE | [2019/08] |
Former [2009/24] | Leyder, Francis Total Petrochemicals Research Feluy Zone Industrielle C 7181 Seneffe (Feluy) / BE | Application number, filing date | 07820663.8 | 27.09.2007 | [2009/24] | WO2007EP60275 | Priority number, date | EP20060121560 | 29.09.2006 Original published format: EP 06121560 | [2009/24] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2008037773 | Date: | 03.04.2008 | Language: | EN | [2008/14] | Type: | A1 Application with search report | No.: | EP2066719 | Date: | 10.06.2009 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.04.2008 takes the place of the publication of the European patent application. | [2009/24] | Type: | B1 Patent specification | No.: | EP2066719 | Date: | 20.02.2019 | Language: | EN | [2019/08] | Search report(s) | International search report - published on: | EP | 03.04.2008 | Classification | IPC: | C08G18/42 | [2009/24] | CPC: |
C08G18/4283 (EP,US);
C08G18/0895 (EP,US);
C08G18/10 (EP,US);
C08G18/3206 (US);
C08G18/3228 (US);
C08G18/3231 (US);
| C-Set: |
C08G18/10, C08G18/3225 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2019/08] |
Former [2009/24] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | POLYLACTID-URETHAN-COPOLYMERE | [2009/24] | English: | POLYLACTIDE-URETHANE COPOLYMERS | [2009/24] | French: | COPOLYMÈRES POLYLACTIDE-URÉTHANE | [2009/24] | Entry into regional phase | 27.03.2009 | National basic fee paid | 27.03.2009 | Designation fee(s) paid | 27.03.2009 | Examination fee paid | Examination procedure | 27.03.2009 | Examination requested [2009/24] | 25.08.2009 | Despatch of a communication from the examining division (Time limit: M06) | 09.04.2010 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 08.06.2010 | Reply to a communication from the examining division | 11.03.2013 | Despatch of a communication from the examining division (Time limit: M06) | 23.09.2013 | Reply to a communication from the examining division | 30.11.2015 | Despatch of a communication from the examining division (Time limit: M06) | 06.06.2016 | Reply to a communication from the examining division | 01.02.2018 | Despatch of a communication from the examining division (Time limit: M06) | 24.07.2018 | Reply to a communication from the examining division | 17.08.2018 | Communication of intention to grant the patent | 20.12.2018 | Fee for grant paid | 20.12.2018 | Fee for publishing/printing paid | 20.12.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 25.08.2009 | Opposition(s) | 21.11.2019 | No opposition filed within time limit [2020/05] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 08.06.2010 | Request for further processing filed | 08.06.2010 | Full payment received (date of receipt of payment) Request granted | 23.06.2010 | Decision despatched | Fees paid | Renewal fee | 29.09.2009 | Renewal fee patent year 03 | 20.09.2010 | Renewal fee patent year 04 | 26.09.2011 | Renewal fee patent year 05 | 29.09.2012 | Renewal fee patent year 06 | 27.09.2013 | Renewal fee patent year 07 | 29.09.2014 | Renewal fee patent year 08 | 29.09.2015 | Renewal fee patent year 09 | 26.09.2016 | Renewal fee patent year 10 | 28.09.2017 | Renewal fee patent year 11 | 28.09.2018 | Renewal fee patent year 12 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.09.2007 | AT | 20.02.2019 | CY | 20.02.2019 | CZ | 20.02.2019 | DK | 20.02.2019 | EE | 20.02.2019 | FI | 20.02.2019 | LT | 20.02.2019 | LV | 20.02.2019 | MC | 20.02.2019 | MT | 20.02.2019 | PL | 20.02.2019 | RO | 20.02.2019 | SE | 20.02.2019 | SI | 20.02.2019 | SK | 20.02.2019 | TR | 20.02.2019 | BG | 20.05.2019 | GR | 21.05.2019 | IS | 20.06.2019 | PT | 20.06.2019 | IE | 27.09.2019 | LU | 27.09.2019 | CH | 30.09.2019 | LI | 30.09.2019 | [2021/34] |
Former [2021/33] | HU | 27.09.2007 | |
AT | 20.02.2019 | ||
CY | 20.02.2019 | ||
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
FI | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
TR | 20.02.2019 | ||
BG | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
IE | 27.09.2019 | ||
LU | 27.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2021/26] | AT | 20.02.2019 | |
CY | 20.02.2019 | ||
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
FI | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
TR | 20.02.2019 | ||
BG | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
IE | 27.09.2019 | ||
LU | 27.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/36] | AT | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
FI | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
TR | 20.02.2019 | ||
BG | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
IE | 27.09.2019 | ||
LU | 27.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/35] | AT | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
FI | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
TR | 20.02.2019 | ||
BG | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
LU | 27.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/34] | AT | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
FI | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
TR | 20.02.2019 | ||
BG | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/25] | AT | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
FI | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
TR | 20.02.2019 | ||
BG | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/17] | AT | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
FI | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
TR | 20.02.2019 | ||
BG | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/13] | AT | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
FI | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
BG | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/03] | AT | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
FI | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SK | 20.02.2019 | ||
BG | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/01] | CZ | 20.02.2019 | |
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
FI | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SK | 20.02.2019 | ||
BG | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/49] | CZ | 20.02.2019 | |
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
FI | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SK | 20.02.2019 | ||
BG | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/48] | DK | 20.02.2019 | |
FI | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
SE | 20.02.2019 | ||
BG | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/39] | FI | 20.02.2019 | |
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
SE | 20.02.2019 | ||
BG | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/38] | FI | 20.02.2019 | |
LT | 20.02.2019 | ||
SE | 20.02.2019 | ||
BG | 20.05.2019 | ||
GR | 21.05.2019 | ||
PT | 20.06.2019 | ||
Former [2019/37] | FI | 20.02.2019 | |
LT | 20.02.2019 | ||
SE | 20.02.2019 | ||
GR | 21.05.2019 | ||
PT | 20.06.2019 | ||
Former [2019/34] | FI | 20.02.2019 | |
LT | 20.02.2019 | ||
SE | 20.02.2019 | ||
PT | 20.06.2019 | ||
Former [2019/33] | FI | 20.02.2019 | |
LT | 20.02.2019 | ||
PT | 20.06.2019 | Cited in | International search | [DA]WO9601863 (ALKO GROUP LTD [FI], et al) [DA] 1 * claim - *; | [X]US6372876 (KIM SON NGUYEN [DE], et al) [X] 1-12 * example -; claims 1,3 *; | [A] - KOBAYASHI H ET AL, "WATER-CURABLE AND BIODEGRADABLE PREPOLYMERS", JOURNAL OF BIOMEDICAL MATERIALS RESEARCH, WILEY, NEW YORK, NY, US, (1991), vol. 25, no. 12, ISSN 0021-9304, pages 1481 - 1494, XP000912112 [A] 1 * tables 1,2 * DOI: http://dx.doi.org/10.1002/jbm.820251206 | [DA] - WANG ET AL, "Polylactide-based polyurethane and its shape-memory behavior", EUROPEAN POLYMER JOURNAL, PERGAMON PRESS LTD. OXFORD, GB, (200606), vol. 42, no. 6, ISSN 0014-3057, pages 1240 - 1249, XP005425795 [DA] 1 * scheme 1 * DOI: http://dx.doi.org/10.1016/j.eurpolymj.2005.11.029 |