blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2065293

EP2065293 - TRACK FRAME FOR WORK MACHINE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  15.06.2012
Database last updated on 24.08.2024
Most recent event   Tooltip15.06.2012No opposition filed within time limitpublished on 18.07.2012  [2012/29]
Applicant(s)For all designated states
Kubota Corporation
2-47, Shikitsuhigashi 1-chome, Naniwa-ku Osaka-shi
Osaka 556-8601 / JP
[2009/23]
Inventor(s)01 / SUGIMOTO, Takatoshi
c/o KUBOTA CORPORATION Sakai Seizosho, 64, Ishizukitamachi Sakai-ku
Sakai-shi, Osaka; 590-0823 / JP
 [2009/23]
Representative(s)Hawkins, Richard Dudley, et al
Keltie LLP
No.1 London Bridge
London SE1 9BA / GB
[N/P]
Former [2009/23]Hawkins, Richard Dudley, et al
Keltie Fleet Place House 2 Fleet Place
London EC4M 7ET / GB
Application number, filing date07828252.219.09.2007
[2009/23]
WO2007JP68140
Priority number, dateJP2006026516428.09.2006         Original published format: JP 2006265164
JP2006026516528.09.2006         Original published format: JP 2006265165
[2009/23]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2008038549
Date:03.04.2008
Language:JA
[2008/14]
Type: A1 Application with search report 
No.:EP2065293
Date:03.06.2009
Language:EN
[2009/23]
Type: B1 Patent specification 
No.:EP2065293
Date:10.08.2011
Language:EN
[2011/32]
Search report(s)International search report - published on:JP03.04.2008
(Supplementary) European search report - dispatched on:EP28.10.2009
ClassificationIPC:B62D21/18, B62D21/06, B62D55/10, E02F9/02
[2009/23]
CPC:
B62D55/10 (EP,US); B62D21/186 (EP,US); B62D33/0633 (EP,US);
E02F9/02 (EP,US); E02F9/121 (EP,US)
Designated contracting statesDE,   FR,   GB,   IT [2010/46]
Former [2009/23]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
RSNot yet paid
TitleGerman:GLEISKETTENRAHMEN EINER ARBEITSMACHINE[2011/13]
English:TRACK FRAME FOR WORK MACHINE[2009/23]
French:CHASSIS CHENILLE POUR ENGIN DE CHANTIER[2011/13]
Former [2009/23]VERFOLGUNGSRAHMEN FÜR EINE ARBEITSMASCHINE
Former [2009/23]STRUCTURE DE CHENILLE POUR ENGIN DE CHANTIER
Entry into regional phase11.02.2009Translation filed 
23.03.2009National basic fee paid 
23.03.2009Search fee paid 
23.03.2009Designation fee(s) paid 
23.03.2009Examination fee paid 
Examination procedure23.03.2009Examination requested  [2009/23]
29.04.2009Loss of particular rights, legal effect: designated state(s)
05.06.2009Despatch of communication of loss of particular rights: designated state(s) AT, BE, BG, CH, CY, CZ, DK, EE, ES, FI, GR, HU, IE, IS, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR
02.02.2010Despatch of a communication from the examining division (Time limit: M04)
13.09.2010Despatch of a communication from the examining division (Time limit: M04)
13.01.2011Reply to a communication from the examining division
04.03.2011Communication of intention to grant the patent
21.06.2011Fee for grant paid
21.06.2011Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  02.02.2010
Opposition(s)11.05.2012No opposition filed within time limit [2012/29]
Fees paidRenewal fee
28.09.2009Renewal fee patent year 03
29.09.2010Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[YA]JP2004268762  (KOMATSU MFG CO LTD, et al) [Y] 2 * figure - * [A] 1,3,7-11;
 [XY]EP1479833  (KOMATSU MFG CO LTD [JP], et al) [X] 1,3-6 * figures 2,3,4B,4C,6A-6D * * paragraph [0077] - paragraph [0083] * [Y] 2,7-11;
 [YA]EP1479831  (KOMATSU MFG CO LTD [JP], et al) [Y] 7-11 * figure - *[A] 1-6
International search[X]JP2005001651  (KOMATSU MFG CO LTD, et al);
 [Y]JP2005001653  (KOMATSU MFG CO LTD, et al)
by applicantJP2005001652
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.