blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2195951

EP2195951 - INCLUDING IN THE UPLINK GRANT AN INDICATION OF SPECIFIC AMOUNT OF CQI TO BE REPORTED [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  20.12.2013
Database last updated on 31.08.2024
Most recent event   Tooltip20.12.2013Application deemed to be withdrawnpublished on 22.01.2014  [2014/04]
Applicant(s)For all designated states
Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm / SE
[N/P]
Former [2010/24]For all designated states
Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm / SE
Inventor(s)01 / JERSENIUS, Kristina
Rekrytgatan 4, lgh 443
S-58 214 Linköping / SE
02 / ENGLUND, Eva
Alholmsvägen 4
S-589 37 Linköping / SE
03 / FRENGER, Pål
Tomatvägen 20
S-582 75 Linköping / SE
 [2010/24]
Representative(s)Kühn, Friedrich Heinrich
Ericsson AB
Patent Unit LTE
Torshamnsgatan 23
164 80 Stockholm / SE
[N/P]
Former [2010/24]Kühn, Friedrich Heinrich
Ericsson AB Patent Unit LTE Torshamnsgatan 23
164 80 Stockholm / SE
Application number, filing date07861146.420.12.2007
[2010/24]
WO2007SE51051
Priority number, dateUS20070976906P02.10.2007         Original published format: US 976906 P
[2010/24]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2009045139
Date:09.04.2009
Language:EN
[2009/15]
Type: A1 Application with search report 
No.:EP2195951
Date:16.06.2010
Language:EN
The application published by WIPO in one of the EPO official languages on 09.04.2009 takes the place of the publication of the European patent application.
[2010/24]
Search report(s)International search report - published on:SE09.04.2009
(Supplementary) European search report - dispatched on:EP03.01.2013
ClassificationIPC:H04L1/00, H04B17/00, H04W88/08, H04W88/02, H04W72/12
[2013/07]
CPC:
H04L1/0026 (EP,US); H04W72/23 (US); H04B17/24 (EP,US);
H04L1/0027 (EP,US); H04L1/003 (EP,US); H04W72/20 (EP,US);
H04W72/21 (US); H04W88/02 (US); H04W88/08 (US) (-)
Former IPC [2010/24]H04L1/00, H04B17/00, H04L12/56, H04W88/08, H04W88/02
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2010/24]
TitleGerman:EINFÜGEN EINER ANGABE DER SPEZIFISCHEN ZU MELDENDEN CQI-MENGE IN DIE AUFWÄRTSSTRECKENGEWÄHRUNG[2010/24]
English:INCLUDING IN THE UPLINK GRANT AN INDICATION OF SPECIFIC AMOUNT OF CQI TO BE REPORTED[2010/24]
French:INCLUSION DANS L'ALLOCATION DE LIAISON MONTANTE D'UNE INDICATION DE QUANTITÉ SPÉCIFIQUE DE CQI DEVANT ÊTRE REPORTÉE[2010/24]
Entry into regional phase12.02.2010National basic fee paid 
12.02.2010Search fee paid 
12.02.2010Designation fee(s) paid 
12.02.2010Examination fee paid 
Examination procedure06.07.2009Request for preliminary examination filed
International Preliminary Examining Authority: SE
12.02.2010Examination requested  [2010/24]
23.07.2013Application deemed to be withdrawn, date of legal effect  [2014/04]
09.09.2013Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2014/04]
Fees paidRenewal fee
24.02.2010Renewal fee patent year 03
27.12.2010Renewal fee patent year 04
27.12.2011Renewal fee patent year 05
26.12.2012Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]EP1564953  (SAMSUNG ELECTRONICS CO LTD [KR]) [A] 1-21 * column 2, paragraph 6 - paragraph 9 *;
 [XI]  - ERICSSON, "On CQI Reporting", 3GPP TSG RAN WG1 MEETING #50BIS,, (20070820), no. R1-073746, pages 1 - 4, XP003023447 [X] 1,3,5-7,9,11,12,14,16,17,19,21 * page 1, paragraph 2.1 - page 2 * [I] 2,4,8,10,13,15,18,20
 [XI]  - NOKIA ET AL, "CQI Trigger Mechanism", 3GPP DRAFT; R1-073680, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070815), vol. RAN WG1, no. Athens, Greece; 20070815, XP050107276 [X] 1,3,5-7,9,11,12,14,16,17,19,21 * page 3, paragraph 3 - page 4 * [I] 2,4,8,10,13,15,18,20
 [XI]  - IPWIRELESS, "Overhead for Periodic and Triggered CQI Reporting", 3GPP DRAFT; R1-063509, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20061101), vol. RAN WG1, no. Riga, Latvia; 20061101, XP050103943 [X] 1,3,5-7,9,11,12,14,16,17,19,21 * page 2, paragraph 3 - page 3; figure 2 * [I] 2,4,8,10,13,15,18,20
 [XI]  - INTERDIGITAL, "Scheduling and Multiplexing of CQI and ACK/NACK Feedback for Single Carrier FDMA in Evolved UTRA Uplink", 3GPP TSG-RAN WG1 MEETING AD HOC LTE, XX, XX, (20060123), no. R1-060155, pages 1 - 8, XP002446639 [X] 1,3,5-7,9,11,12,14,16,17,19,21 * page 1, paragraph 2.1 * * page 7, paragraph 9.1.2.2.1.1 - page 8 * [I] 2,4,8,10,13,15,18,20
 [A]  - BENQ MOBILE, "Dynamic control of CQI reporting", 3GPP DRAFT; R2-062448_DYNAMIC_CONTROL_OF_CQI_REPORTING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20060823), vol. RAN WG2, no. Tallinn; 20060823, XP050132028 [A] 1-21 * figure 1 *
 [A]  - INTEL, "E-UTRA Uplink and Downlink Control Signaling - Text Proposal", 3GPP DRAFT; R1-061534 UL-DL CONTROL SIGNALING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20060502), vol. RAN WG1, no. Shanghai, China; 20060502, XP050102383 [A] 1-21 * page 2, paragraph 9.1.1.2.4.2 *
International search[X]  - "On CQI Reporting", Rl-073746 3GPP TSG-RAN WG1 Meeting #50, ATHENS, GREECE, (20070820), pages 1 - 2
 [A]  - "Scheduling and Multiplexing of CQI and ACK/NACK Feedback for Single Carrier FDMA in Evolved UTRA Uplink", Rl-060155, TSG-RAN WG1 WG1 LTE Ad Hoc Meeting, HELSINKI, FINLAND, (20060123), pages 1 - 8, XP002446639
 [A]  - "CQI Feedback Control and Content in E-UTRA", Rl-071524, 3GPP TSG-RAN WG1 Meeting #48bis, ST JULIANS, MALTA, (20070326), pages 1 - 4
 [XP]  - "Channel feedback format selection", R1-074854, 3GPP TSG-RAN WG1 meeting #51, KOREA, (20071105), pages 1 - 6
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.