| EP2076732 - METHODS AND APPARATUSES FOR ELECTRONIC TIME DELAY AND SYSTEMS INCLUDING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.08.2012 Database last updated on 28.03.2026 | Most recent event Tooltip | 04.10.2013 | Lapse of the patent in a contracting state New state(s): HU | published on 06.11.2013 [2013/45] | Applicant(s) | For all designated states Alliant Techsystems Inc. 5050 Lincoln Drive Edina, MN 55436-1097 / US | [2009/28] | Inventor(s) | 01 /
PRINZ, Francois X. 1521 Via Cassia Henderson, Nevada 89052 / US | 02 /
ARRELL, John A. Jr. 57 Pickwick Lane Lincoln University, Pennsylvania 19352 / US | 03 /
BORJA, Ronald S. 2 Peterson Place Bear, Delaware 19701 / US | 04 /
SLADE, William J. 102 Sypherd Drive Newark, Delaware 19711 / US | [2011/43] |
| Former [2009/28] | 01 /
PRINZ, Francois X. 1521 Via Cassia Henderson, Nevada 89052 / US | ||
| 02 /
ARRELL, John A. Jr. 57 Pickwick Lane Lincoln University, Pennsylvania 19352 / US | |||
| 03 /
BORJA, Ronald S. 1 Wenard Drive, 7 Newark, Delaware 19713 / US | |||
| 04 /
SLADE, William J. 102 Sypherd Drive Newark, Delaware 19711 / US | Representative(s) | Lang, Johannes, et al Bardehle Pagenberg Partnerschaft mbB Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [N/P] |
| Former [2011/43] | Lang, Johannes, et al Bardehle Pagenberg Prinzregentenplatz 7 81675 München / DE | ||
| Former [2011/13] | Lang, Johannes, et al Bardehle Pagenberg Galileiplatz 1 81679 München / DE | ||
| Former [2009/28] | Altenburg, Udo Patent- und Rechtsanwälte Bardehle . Pagenberg . Dost . Altenburg . Geissler Galileiplatz 1 81679 München / DE | Application number, filing date | 07871261.9 | 26.10.2007 | [2009/28] | WO2007US82641 | Priority number, date | US20060553361 | 26.10.2006 Original published format: US 553361 | US20070876841 | 23.10.2007 Original published format: US 876841 | [2009/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2008070343 | Date: | 12.06.2008 | Language: | EN | [2008/24] | Type: | A2 Application without search report | No.: | EP2076732 | Date: | 08.07.2009 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.06.2008 takes the place of the publication of the European patent application. | [2009/28] | Type: | B1 Patent specification | No.: | EP2076732 | Date: | 26.10.2011 | Language: | EN | [2011/43] | Search report(s) | International search report - published on: | EP | 11.12.2008 | Classification | IPC: | F42B3/192, F42C11/06, F42D1/055, E21B43/1185 | [2009/28] | CPC: |
F42B3/192 (EP,US);
E21B43/1185 (EP,US);
F42C11/06 (EP,US);
F42C15/00 (EP,US);
F42C15/16 (EP,US);
F42C15/32 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2009/28] | Title | German: | VERFAHREN UND VORRICHTUNGEN FÜR ELEKTRONISCHE ZEITVERZÖGERUNG UND SYSTEME DAMIT | [2009/28] | English: | METHODS AND APPARATUSES FOR ELECTRONIC TIME DELAY AND SYSTEMS INCLUDING SAME | [2009/28] | French: | PROCÉDÉS ET APPAREILS POUR LE RETARD DE TEMPS ÉLECTRONIQUE ET SYSTÈMES COMPRENANT CEUX-CI | [2009/28] | Entry into regional phase | 28.04.2009 | National basic fee paid | 28.04.2009 | Designation fee(s) paid | 28.04.2009 | Examination fee paid | Examination procedure | 28.04.2009 | Amendment by applicant (claims and/or description) | 28.04.2009 | Examination requested [2009/28] | 31.05.2010 | Despatch of a communication from the examining division (Time limit: M06) | 22.10.2010 | Reply to a communication from the examining division | 18.04.2011 | Communication of intention to grant the patent | 24.08.2011 | Fee for grant paid | 24.08.2011 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 31.05.2010 | Opposition(s) | 27.07.2012 | No opposition filed within time limit [2012/40] | Fees paid | Renewal fee | 26.10.2009 | Renewal fee patent year 03 | 25.10.2010 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 26.10.2011 | BE | 26.10.2011 | CY | 26.10.2011 | CZ | 26.10.2011 | EE | 26.10.2011 | FI | 26.10.2011 | HU | 26.10.2011 | IE | 26.10.2011 | LT | 26.10.2011 | LU | 26.10.2011 | LV | 26.10.2011 | MT | 26.10.2011 | NL | 26.10.2011 | PL | 26.10.2011 | RO | 26.10.2011 | SE | 26.10.2011 | SI | 26.10.2011 | SK | 26.10.2011 | TR | 26.10.2011 | CH | 31.10.2011 | LI | 31.10.2011 | MC | 31.10.2011 | FR | 26.12.2011 | BG | 26.01.2012 | GR | 27.01.2012 | ES | 06.02.2012 | IS | 26.02.2012 | PT | 27.02.2012 | [2013/45] |
| Former [2013/44] | AT | 26.10.2011 | |
| BE | 26.10.2011 | ||
| CY | 26.10.2011 | ||
| CZ | 26.10.2011 | ||
| EE | 26.10.2011 | ||
| FI | 26.10.2011 | ||
| IE | 26.10.2011 | ||
| LT | 26.10.2011 | ||
| LU | 26.10.2011 | ||
| LV | 26.10.2011 | ||
| MT | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| PL | 26.10.2011 | ||
| RO | 26.10.2011 | ||
| SE | 26.10.2011 | ||
| SI | 26.10.2011 | ||
| SK | 26.10.2011 | ||
| TR | 26.10.2011 | ||
| CH | 31.10.2011 | ||
| LI | 31.10.2011 | ||
| MC | 31.10.2011 | ||
| FR | 26.12.2011 | ||
| BG | 26.01.2012 | ||
| GR | 27.01.2012 | ||
| ES | 06.02.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2013/29] | AT | 26.10.2011 | |
| BE | 26.10.2011 | ||
| CY | 26.10.2011 | ||
| CZ | 26.10.2011 | ||
| EE | 26.10.2011 | ||
| FI | 26.10.2011 | ||
| IE | 26.10.2011 | ||
| LT | 26.10.2011 | ||
| LU | 26.10.2011 | ||
| LV | 26.10.2011 | ||
| MT | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| PL | 26.10.2011 | ||
| RO | 26.10.2011 | ||
| SE | 26.10.2011 | ||
| SI | 26.10.2011 | ||
| SK | 26.10.2011 | ||
| CH | 31.10.2011 | ||
| LI | 31.10.2011 | ||
| MC | 31.10.2011 | ||
| FR | 26.12.2011 | ||
| BG | 26.01.2012 | ||
| GR | 27.01.2012 | ||
| ES | 06.02.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2013/25] | AT | 26.10.2011 | |
| BE | 26.10.2011 | ||
| CY | 26.10.2011 | ||
| CZ | 26.10.2011 | ||
| EE | 26.10.2011 | ||
| IE | 26.10.2011 | ||
| LT | 26.10.2011 | ||
| LU | 26.10.2011 | ||
| LV | 26.10.2011 | ||
| MT | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| PL | 26.10.2011 | ||
| RO | 26.10.2011 | ||
| SE | 26.10.2011 | ||
| SI | 26.10.2011 | ||
| SK | 26.10.2011 | ||
| CH | 31.10.2011 | ||
| LI | 31.10.2011 | ||
| MC | 31.10.2011 | ||
| FR | 26.12.2011 | ||
| BG | 26.01.2012 | ||
| GR | 27.01.2012 | ||
| ES | 06.02.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2013/22] | AT | 26.10.2011 | |
| BE | 26.10.2011 | ||
| CY | 26.10.2011 | ||
| CZ | 26.10.2011 | ||
| EE | 26.10.2011 | ||
| IE | 26.10.2011 | ||
| LT | 26.10.2011 | ||
| LV | 26.10.2011 | ||
| MT | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| PL | 26.10.2011 | ||
| RO | 26.10.2011 | ||
| SE | 26.10.2011 | ||
| SI | 26.10.2011 | ||
| SK | 26.10.2011 | ||
| CH | 31.10.2011 | ||
| LI | 31.10.2011 | ||
| MC | 31.10.2011 | ||
| FR | 26.12.2011 | ||
| BG | 26.01.2012 | ||
| GR | 27.01.2012 | ||
| ES | 06.02.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2013/19] | AT | 26.10.2011 | |
| BE | 26.10.2011 | ||
| CY | 26.10.2011 | ||
| CZ | 26.10.2011 | ||
| EE | 26.10.2011 | ||
| IE | 26.10.2011 | ||
| LT | 26.10.2011 | ||
| LV | 26.10.2011 | ||
| MT | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| PL | 26.10.2011 | ||
| RO | 26.10.2011 | ||
| SE | 26.10.2011 | ||
| SI | 26.10.2011 | ||
| SK | 26.10.2011 | ||
| CH | 31.10.2011 | ||
| LI | 31.10.2011 | ||
| MC | 31.10.2011 | ||
| FR | 26.12.2011 | ||
| BG | 26.01.2012 | ||
| GR | 27.01.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2013/14] | AT | 26.10.2011 | |
| BE | 26.10.2011 | ||
| CY | 26.10.2011 | ||
| CZ | 26.10.2011 | ||
| EE | 26.10.2011 | ||
| IE | 26.10.2011 | ||
| LT | 26.10.2011 | ||
| LV | 26.10.2011 | ||
| MT | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| PL | 26.10.2011 | ||
| RO | 26.10.2011 | ||
| SE | 26.10.2011 | ||
| SI | 26.10.2011 | ||
| SK | 26.10.2011 | ||
| CH | 31.10.2011 | ||
| LI | 31.10.2011 | ||
| MC | 31.10.2011 | ||
| BG | 26.01.2012 | ||
| GR | 27.01.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2013/07] | AT | 26.10.2011 | |
| BE | 26.10.2011 | ||
| CY | 26.10.2011 | ||
| CZ | 26.10.2011 | ||
| EE | 26.10.2011 | ||
| IE | 26.10.2011 | ||
| LT | 26.10.2011 | ||
| LV | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| PL | 26.10.2011 | ||
| RO | 26.10.2011 | ||
| SE | 26.10.2011 | ||
| SI | 26.10.2011 | ||
| SK | 26.10.2011 | ||
| CH | 31.10.2011 | ||
| LI | 31.10.2011 | ||
| MC | 31.10.2011 | ||
| BG | 26.01.2012 | ||
| GR | 27.01.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2012/47] | BE | 26.10.2011 | |
| CY | 26.10.2011 | ||
| CZ | 26.10.2011 | ||
| EE | 26.10.2011 | ||
| IE | 26.10.2011 | ||
| LT | 26.10.2011 | ||
| LV | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| PL | 26.10.2011 | ||
| RO | 26.10.2011 | ||
| SE | 26.10.2011 | ||
| SI | 26.10.2011 | ||
| SK | 26.10.2011 | ||
| CH | 31.10.2011 | ||
| LI | 31.10.2011 | ||
| MC | 31.10.2011 | ||
| BG | 26.01.2012 | ||
| GR | 27.01.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2012/36] | BE | 26.10.2011 | |
| CY | 26.10.2011 | ||
| CZ | 26.10.2011 | ||
| EE | 26.10.2011 | ||
| LT | 26.10.2011 | ||
| LV | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| PL | 26.10.2011 | ||
| RO | 26.10.2011 | ||
| SE | 26.10.2011 | ||
| SI | 26.10.2011 | ||
| SK | 26.10.2011 | ||
| CH | 31.10.2011 | ||
| LI | 31.10.2011 | ||
| MC | 31.10.2011 | ||
| BG | 26.01.2012 | ||
| GR | 27.01.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2012/35] | BE | 26.10.2011 | |
| CY | 26.10.2011 | ||
| CZ | 26.10.2011 | ||
| EE | 26.10.2011 | ||
| LT | 26.10.2011 | ||
| LV | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| PL | 26.10.2011 | ||
| SE | 26.10.2011 | ||
| SI | 26.10.2011 | ||
| CH | 31.10.2011 | ||
| LI | 31.10.2011 | ||
| MC | 31.10.2011 | ||
| BG | 26.01.2012 | ||
| GR | 27.01.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2012/34] | BE | 26.10.2011 | |
| CY | 26.10.2011 | ||
| CZ | 26.10.2011 | ||
| LT | 26.10.2011 | ||
| LV | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| PL | 26.10.2011 | ||
| SE | 26.10.2011 | ||
| SI | 26.10.2011 | ||
| CH | 31.10.2011 | ||
| LI | 31.10.2011 | ||
| MC | 31.10.2011 | ||
| GR | 27.01.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2012/28] | BE | 26.10.2011 | |
| CY | 26.10.2011 | ||
| LT | 26.10.2011 | ||
| LV | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| PL | 26.10.2011 | ||
| SE | 26.10.2011 | ||
| SI | 26.10.2011 | ||
| MC | 31.10.2011 | ||
| GR | 27.01.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2012/26] | BE | 26.10.2011 | |
| LT | 26.10.2011 | ||
| LV | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| PL | 26.10.2011 | ||
| SE | 26.10.2011 | ||
| SI | 26.10.2011 | ||
| MC | 31.10.2011 | ||
| GR | 27.01.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2012/24] | BE | 26.10.2011 | |
| LT | 26.10.2011 | ||
| LV | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| SE | 26.10.2011 | ||
| SI | 26.10.2011 | ||
| MC | 31.10.2011 | ||
| GR | 27.01.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2012/23] | BE | 26.10.2011 | |
| LT | 26.10.2011 | ||
| NL | 26.10.2011 | ||
| GR | 27.01.2012 | ||
| IS | 26.02.2012 | ||
| PT | 27.02.2012 | ||
| Former [2012/21] | BE | 26.10.2011 | |
| LT | 26.10.2011 | ||
| IS | 26.02.2012 | ||
| Former [2012/20] | LT | 26.10.2011 | |