| EP2072993 - Smear slide preparing apparatus and smear slide preparing method [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.10.2021 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 20.11.2020 | ||
| Former | Grant of patent is intended Status updated on 29.06.2020 | ||
| Former | Examination is in progress Status updated on 20.03.2017 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states SYSMEX CORPORATION 5-1, Wakinohama-Kaigandori 1-chome, Chuo-ku Kobe-shi Hyogo 651-0073 / JP | [2009/26] | Inventor(s) | 01 /
Yamasaki, Mitsuo Sysmex Corporation 5-1, Wakinohama-Kaigandori 1-chome Chuo-ku Kobe-shi, Hyogo 651-0073 / JP | [2020/31] |
| Former [2009/26] | 01 /
Yamasaki, Mitsuo c/o Sysmex Corporation 5-1, Wakinohama-Kaigandori 1-chome Chuo-ku Kobe-shi Hyogo 651-0073 / JP | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2020/52] |
| Former [2009/26] | HOFFMANN EITLE Patent- und Rechtsanwälte Arabellastraße 4 81925 München / DE | Application number, filing date | 08020232.8 | 20.11.2008 | [2009/26] | Priority number, date | JP20070324611 | 17.12.2007 Original published format: JP 2007324611 | [2009/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2072993 | Date: | 24.06.2009 | Language: | EN | [2009/26] | Type: | A3 Search report | No.: | EP2072993 | Date: | 17.11.2010 | [2010/46] | Type: | B1 Patent specification | No.: | EP2072993 | Date: | 23.12.2020 | Language: | EN | [2020/52] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.10.2010 | Classification | IPC: | G01N1/28, G01N1/31 | [2009/26] | CPC: |
G01N1/312 (EP,US);
G01N1/2813 (EP,US);
G01N35/00029 (EP,US);
G01N35/00732 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2020/52] |
| Former [2009/26] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | Vorrichtung zur Vorbereitung von Abstrichtestplättchen und Verfahren zur Vorbereitung Abstrichtestplättchen | [2009/26] | English: | Smear slide preparing apparatus and smear slide preparing method | [2009/26] | French: | Appareil de préparation de frottis sur lame et procédé de préparation de frottis sur lame | [2009/26] | Examination procedure | 17.05.2011 | Amendment by applicant (claims and/or description) | 17.05.2011 | Examination requested [2011/26] | 23.05.2012 | Despatch of a communication from the examining division (Time limit: M04) | 20.09.2012 | Reply to a communication from the examining division | 08.03.2017 | Despatch of a communication from the examining division (Time limit: M06) | 06.09.2017 | Reply to a communication from the examining division | 29.05.2020 | Cancellation of oral proceeding that was planned for 08.06.2020 | 08.06.2020 | Date of oral proceedings (cancelled) | 30.06.2020 | Communication of intention to grant the patent | 22.10.2020 | Fee for grant paid | 22.10.2020 | Fee for publishing/printing paid | 22.10.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.05.2012 | Opposition(s) | 24.09.2021 | No opposition filed within time limit [2021/48] | Fees paid | Renewal fee | 23.11.2010 | Renewal fee patent year 03 | 23.11.2011 | Renewal fee patent year 04 | 14.11.2012 | Renewal fee patent year 05 | 16.11.2013 | Renewal fee patent year 06 | 25.11.2014 | Renewal fee patent year 07 | 18.11.2015 | Renewal fee patent year 08 | 24.11.2016 | Renewal fee patent year 09 | 23.11.2017 | Renewal fee patent year 10 | 28.11.2018 | Renewal fee patent year 11 | 20.11.2019 | Renewal fee patent year 12 | 13.11.2020 | Renewal fee patent year 13 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.11.2008 | AT | 23.12.2020 | CY | 23.12.2020 | CZ | 23.12.2020 | DK | 23.12.2020 | EE | 23.12.2020 | ES | 23.12.2020 | FI | 23.12.2020 | HR | 23.12.2020 | IT | 23.12.2020 | LT | 23.12.2020 | LV | 23.12.2020 | MC | 23.12.2020 | MT | 23.12.2020 | NL | 23.12.2020 | PL | 23.12.2020 | RO | 23.12.2020 | SE | 23.12.2020 | SI | 23.12.2020 | SK | 23.12.2020 | TR | 23.12.2020 | BG | 23.03.2021 | NO | 23.03.2021 | GR | 24.03.2021 | IS | 23.04.2021 | PT | 23.04.2021 | [2026/04] |
| Former [2024/41] | HU | 20.11.2008 | |
| AT | 23.12.2020 | ||
| CY | 23.12.2020 | ||
| CZ | 23.12.2020 | ||
| DK | 23.12.2020 | ||
| EE | 23.12.2020 | ||
| ES | 23.12.2020 | ||
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| IT | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| MC | 23.12.2020 | ||
| MT | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| PL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SI | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| IS | 23.04.2021 | ||
| PT | 23.04.2021 | ||
| Former [2023/29] | HU | 20.11.2008 | |
| AT | 23.12.2020 | ||
| CY | 23.12.2020 | ||
| CZ | 23.12.2020 | ||
| DK | 23.12.2020 | ||
| EE | 23.12.2020 | ||
| ES | 23.12.2020 | ||
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| IT | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| MC | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| PL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SI | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| IS | 23.04.2021 | ||
| PT | 23.04.2021 | ||
| Former [2023/24] | AT | 23.12.2020 | |
| CY | 23.12.2020 | ||
| CZ | 23.12.2020 | ||
| DK | 23.12.2020 | ||
| EE | 23.12.2020 | ||
| ES | 23.12.2020 | ||
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| IT | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| MC | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| PL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SI | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| IS | 23.04.2021 | ||
| PT | 23.04.2021 | ||
| Former [2022/33] | AT | 23.12.2020 | |
| CZ | 23.12.2020 | ||
| DK | 23.12.2020 | ||
| EE | 23.12.2020 | ||
| ES | 23.12.2020 | ||
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| IT | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| MC | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| PL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SI | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| IS | 23.04.2021 | ||
| PT | 23.04.2021 | ||
| Former [2022/23] | AT | 23.12.2020 | |
| CZ | 23.12.2020 | ||
| DK | 23.12.2020 | ||
| EE | 23.12.2020 | ||
| ES | 23.12.2020 | ||
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| IT | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| PL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SI | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| IS | 23.04.2021 | ||
| PT | 23.04.2021 | ||
| Former [2022/13] | AT | 23.12.2020 | |
| CZ | 23.12.2020 | ||
| DK | 23.12.2020 | ||
| EE | 23.12.2020 | ||
| ES | 23.12.2020 | ||
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| IT | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| PL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SI | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| PT | 23.04.2021 | ||
| Former [2022/10] | AT | 23.12.2020 | |
| CZ | 23.12.2020 | ||
| DK | 23.12.2020 | ||
| EE | 23.12.2020 | ||
| ES | 23.12.2020 | ||
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| IT | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| PL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| PT | 23.04.2021 | ||
| Former [2021/51] | AT | 23.12.2020 | |
| CZ | 23.12.2020 | ||
| DK | 23.12.2020 | ||
| EE | 23.12.2020 | ||
| ES | 23.12.2020 | ||
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| IT | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| PL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| IS | 23.04.2021 | ||
| PT | 23.04.2021 | ||
| Former [2021/49] | AT | 23.12.2020 | |
| CZ | 23.12.2020 | ||
| DK | 23.12.2020 | ||
| EE | 23.12.2020 | ||
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| IT | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| PL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| IS | 23.04.2021 | ||
| PT | 23.04.2021 | ||
| Former [2021/48] | AT | 23.12.2020 | |
| CZ | 23.12.2020 | ||
| EE | 23.12.2020 | ||
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| IT | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| PL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| IS | 23.04.2021 | ||
| PT | 23.04.2021 | ||
| Former [2021/42] | AT | 23.12.2020 | |
| CZ | 23.12.2020 | ||
| EE | 23.12.2020 | ||
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| PL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| IS | 23.04.2021 | ||
| PT | 23.04.2021 | ||
| Former [2021/39] | AT | 23.12.2020 | |
| CZ | 23.12.2020 | ||
| EE | 23.12.2020 | ||
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| PL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| PT | 23.04.2021 | ||
| Former [2021/37] | AT | 23.12.2020 | |
| CZ | 23.12.2020 | ||
| EE | 23.12.2020 | ||
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| PT | 23.04.2021 | ||
| Former [2021/36] | CZ | 23.12.2020 | |
| EE | 23.12.2020 | ||
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| PT | 23.04.2021 | ||
| Former [2021/35] | CZ | 23.12.2020 | |
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| RO | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| SK | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| PT | 23.04.2021 | ||
| Former [2021/34] | CZ | 23.12.2020 | |
| FI | 23.12.2020 | ||
| HR | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| PT | 23.04.2021 | ||
| Former [2021/33] | FI | 23.12.2020 | |
| HR | 23.12.2020 | ||
| LT | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| PT | 23.04.2021 | ||
| Former [2021/30] | FI | 23.12.2020 | |
| HR | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| NL | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| Former [2021/28] | FI | 23.12.2020 | |
| HR | 23.12.2020 | ||
| LV | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| Former [2021/24] | FI | 23.12.2020 | |
| LV | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| BG | 23.03.2021 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| Former [2021/23] | FI | 23.12.2020 | |
| LV | 23.12.2020 | ||
| SE | 23.12.2020 | ||
| NO | 23.03.2021 | ||
| GR | 24.03.2021 | ||
| Former [2021/22] | FI | 23.12.2020 | |
| NO | 23.03.2021 | ||
| Former [2021/20] | FI | 23.12.2020 | Documents cited: | Search | [Y] US2006029519 (NAKAYA MASANORI et al.) | [Y] US5650327 (COPELAND KEITH G et al.) [Y] 1-15 * paragraphs [0035] , [0 37] , [0 39] * * paragraphs [0040] , [0 41] , [0 43] , [0 45] * * paragraph [0109]; claim 32 * * figures 2, 3, 4, * | Examination | US4087154 | by applicant | US2006029519 |