EP2071300 - Tank with electrical elements which are at least partially covered with an elastomere [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 27.03.2015 Database last updated on 19.10.2024 | Most recent event Tooltip | 27.03.2015 | Application deemed to be withdrawn | published on 29.04.2015 [2015/18] | Applicant(s) | For all designated states Robert Bosch GmbH C/IPE Postfach 30 02 20 70442 Stuttgart / DE | [2009/25] | Inventor(s) | 01 /
Haeberer, Rainer Eichenstr 32 75015, Bretten / DE | 02 /
Bruns, Joachim Bruehlweg 17 73669, Lichtenwald / DE | [2009/25] | Application number, filing date | 08105795.2 | 14.11.2008 | [2009/25] | Priority number, date | DE20071059848 | 12.12.2007 Original published format: DE102007059848 | [2009/25] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2071300 | Date: | 17.06.2009 | Language: | DE | [2009/25] | Type: | A3 Search report | No.: | EP2071300 | Date: | 30.04.2014 | Language: | DE | [2014/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 01.04.2014 | Classification | IPC: | G01F23/24, G01F23/26, G01K1/10, G01K7/16, G01K7/34 | [2014/18] | CPC: |
G01F23/24 (EP);
G01F23/26 (EP);
G01K1/08 (EP)
|
Former IPC [2009/25] | G01F23/24, G01F23/26 | Designated contracting states | (deleted) [2015/02] |
Former [2009/25] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | Tank mit elektrischen Elemente welche zumindest teilweise mit einem Elastomer bedeckt sind | [2009/25] | English: | Tank with electrical elements which are at least partially covered with an elastomere | [2009/25] | French: | Réservoir avec des éléments électriques couverts au moins partiellement avec un élastomère | [2009/25] | Examination procedure | 31.10.2014 | Application deemed to be withdrawn, date of legal effect [2015/18] | 08.12.2014 | Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time [2015/18] | Fees paid | Renewal fee | 30.11.2010 | Renewal fee patent year 03 | 30.11.2011 | Renewal fee patent year 04 | 30.11.2012 | Renewal fee patent year 05 | 02.12.2013 | Renewal fee patent year 06 | Penalty fee | Additional fee for renewal fee | 30.11.2014 | 07   M06   Not yet paid |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XI]US3666903 (BATA GEORGE THOMAS, et al) [X] 1,3,4,6,10 * figures 1,2 * * column 2, line 62 - line 65 * [I] 2,5,7-9; | [XI]DE19942723 (FORBACH GMBH [DE], et al) [X] 1,3,4,6,7,10 * figure 1 * [I] 2,8,9; | [XI]EP0580323 (TEXAS INSTRUMENTS INC [US]) [X] 1,3,4,6-8,10 * figure 2 * [I] 2,9; | [XI]GB1524024 (NSF CONTROL LTD) [X] 1,3,4,6,9,10 * figures 1,3 * [I] 2,5,7,8; | [A]US2007185310 (MOORE JOHN C [US], et al) [A] 2 * abstract * | by applicant | WO03052357 |