blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2014430

EP2014430 - Installation for preparing a moist material such as concrete or mortar and its use [Right-click to bookmark this link]
Former [2009/03]Installation for preparing a moist material such as concrete or mortar
[2015/16]
StatusNo opposition filed within time limit
Status updated on  12.08.2016
Database last updated on 02.11.2024
Most recent event   Tooltip17.08.2018Lapse of the patent in a contracting state
New state(s): BG
published on 19.09.2018  [2018/38]
Applicant(s)For all designated states
Saint-Gobain Weber France
Rue de Brie
77170 Servon / FR
[2009/49]
Former [2009/03]For all designated states
Weber et Broutin France
Rue de Brie
77170 Servon / FR
Inventor(s)01 / Comoy, Daniel
Près Village
01400 Condeissiat / FR
02 / Royer, Nicolas
19 Chemin Moulin des Loups
01000 Bourg-en-Bresse / FR
03 / Courtes, Luc
11 rue du Moulin de Conilh
33450 Saint Loubes / FR
 [2009/03]
Representative(s)Intès, Didier Gérard André, et al
Cabinet Beau de Loménie
158 rue de l'Université
75340 Paris Cedex 07 / FR
[N/P]
Former [2009/52]Besnard, Christophe Laurent, et al
Cabinet Beau de Loménie 158, rue de l'Université
75340 Paris Cedex 07 / FR
Former [2009/03]Besnard, Christophe Laurent, et al
Cabinet Beau de Loménie 158, rue de l'Université
75007 Paris Cedex 07 / FR
Application number, filing date08158278.513.06.2008
[2009/03]
Priority number, dateFR2007005574013.06.2007         Original published format: FR 0755740
[2009/03]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP2014430
Date:14.01.2009
Language:FR
[2009/03]
Type: B1 Patent specification 
No.:EP2014430
Date:07.10.2015
Language:FR
[2015/41]
Search report(s)(Supplementary) European search report - dispatched on:EP15.10.2008
ClassificationIPC:B28C5/12, B28C7/06
[2015/16]
CPC:
B28C5/1276 (EP); B28C5/1292 (EP); B28C7/064 (EP)
Former IPC [2009/03]B28C5/12
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2015/41]
Former [2009/03]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Anlage zur Herstellung von Feuchtmaterial vom Typ Beton oder Mörtel und seine Verwendung[2015/16]
English:Installation for preparing a moist material such as concrete or mortar and its use[2015/16]
French:Installation de preparation d'un materiau humide de type beton ou mortier et son utilisation[2015/16]
Former [2009/03]Anlage zur Herstellung von Feuchtmaterial vom Typ Beton oder Mörtel
Former [2009/03]Installation for preparing a moist material such as concrete or mortar
Former [2009/03]Installation de preparation d'un materiau humide de type beton ou mortier
Examination procedure06.07.2009Examination requested  [2009/33]
21.09.2009Despatch of a communication from the examining division (Time limit: M06)
04.02.2010Reply to a communication from the examining division
10.07.2014Despatch of a communication from the examining division (Time limit: M04)
10.11.2014Reply to a communication from the examining division
14.04.2015Communication of intention to grant the patent
06.08.2015Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
06.08.2015Fee for grant paid
06.08.2015Fee for publishing/printing paid
31.08.2015Information about intention to grant a patent
31.08.2015Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  21.09.2009
Opposition(s)08.07.2016No opposition filed within time limit [2016/37]
Fees paidRenewal fee
31.03.2010Renewal fee patent year 03
26.08.2011Renewal fee patent year 04
02.10.2012Renewal fee patent year 05
28.06.2013Renewal fee patent year 06
05.05.2014Renewal fee patent year 07
24.06.2015Renewal fee patent year 08
Penalty fee
Additional fee for renewal fee
30.06.201104   M06   Fee paid on   26.08.2011
30.06.201205   M06   Fee paid on   02.10.2012
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.06.2008
AT07.10.2015
BG07.10.2015
CY07.10.2015
CZ07.10.2015
DK07.10.2015
EE07.10.2015
ES07.10.2015
FI07.10.2015
HR07.10.2015
IT07.10.2015
LT07.10.2015
LV07.10.2015
MC07.10.2015
MT07.10.2015
NL07.10.2015
PL07.10.2015
RO07.10.2015
SE07.10.2015
SI07.10.2015
SK07.10.2015
TR07.10.2015
NO07.01.2016
GR08.01.2016
IS07.02.2016
PT08.02.2016
GB13.06.2016
IE13.06.2016
LU13.06.2016
BE30.06.2016
CH30.06.2016
LI30.06.2016
[2018/38]
Former [2018/32]HU13.06.2008
AT07.10.2015
CY07.10.2015
CZ07.10.2015
DK07.10.2015
EE07.10.2015
ES07.10.2015
FI07.10.2015
HR07.10.2015
IT07.10.2015
LT07.10.2015
LV07.10.2015
MC07.10.2015
MT07.10.2015
NL07.10.2015
PL07.10.2015
RO07.10.2015
SE07.10.2015
SI07.10.2015
SK07.10.2015
TR07.10.2015
NO07.01.2016
GR08.01.2016
IS07.02.2016
PT08.02.2016
GB13.06.2016
IE13.06.2016
LU13.06.2016
BE30.06.2016
CH30.06.2016
LI30.06.2016
Former [2018/29]HU13.06.2008
AT07.10.2015
CY07.10.2015
CZ07.10.2015
DK07.10.2015
EE07.10.2015
ES07.10.2015
FI07.10.2015
HR07.10.2015
IT07.10.2015
LT07.10.2015
LV07.10.2015
MC07.10.2015
NL07.10.2015
PL07.10.2015
RO07.10.2015
SE07.10.2015
SI07.10.2015
SK07.10.2015
TR07.10.2015
NO07.01.2016
GR08.01.2016
IS07.02.2016
PT08.02.2016
GB13.06.2016
IE13.06.2016
LU13.06.2016
BE30.06.2016
CH30.06.2016
LI30.06.2016
Former [2018/28]HU13.06.2008
AT07.10.2015
CY07.10.2015
CZ07.10.2015
DK07.10.2015
EE07.10.2015
ES07.10.2015
FI07.10.2015
HR07.10.2015
IT07.10.2015
LT07.10.2015
LV07.10.2015
MC07.10.2015
NL07.10.2015
PL07.10.2015
RO07.10.2015
SE07.10.2015
SI07.10.2015
SK07.10.2015
NO07.01.2016
GR08.01.2016
IS07.02.2016
PT08.02.2016
GB13.06.2016
IE13.06.2016
BE30.06.2016
CH30.06.2016
LI30.06.2016
Former [2017/24]AT07.10.2015
CZ07.10.2015
DK07.10.2015
EE07.10.2015
ES07.10.2015
FI07.10.2015
HR07.10.2015
IT07.10.2015
LT07.10.2015
LV07.10.2015
MC07.10.2015
NL07.10.2015
PL07.10.2015
RO07.10.2015
SE07.10.2015
SI07.10.2015
SK07.10.2015
NO07.01.2016
GR08.01.2016
IS07.02.2016
PT08.02.2016
GB13.06.2016
IE13.06.2016
BE30.06.2016
CH30.06.2016
LI30.06.2016
Former [2017/07]AT07.10.2015
CZ07.10.2015
DK07.10.2015
EE07.10.2015
ES07.10.2015
FI07.10.2015
HR07.10.2015
IT07.10.2015
LT07.10.2015
LV07.10.2015
MC07.10.2015
NL07.10.2015
PL07.10.2015
RO07.10.2015
SE07.10.2015
SI07.10.2015
SK07.10.2015
NO07.01.2016
GR08.01.2016
IS07.02.2016
PT08.02.2016
BE30.06.2016
Former [2017/03]AT07.10.2015
CZ07.10.2015
DK07.10.2015
EE07.10.2015
ES07.10.2015
FI07.10.2015
HR07.10.2015
IT07.10.2015
LT07.10.2015
LV07.10.2015
NL07.10.2015
PL07.10.2015
RO07.10.2015
SE07.10.2015
SI07.10.2015
SK07.10.2015
NO07.01.2016
GR08.01.2016
IS07.02.2016
PT08.02.2016
BE30.06.2016
Former [2016/49]AT07.10.2015
CZ07.10.2015
DK07.10.2015
EE07.10.2015
ES07.10.2015
FI07.10.2015
HR07.10.2015
IT07.10.2015
LT07.10.2015
LV07.10.2015
NL07.10.2015
PL07.10.2015
RO07.10.2015
SE07.10.2015
SI07.10.2015
SK07.10.2015
NO07.01.2016
GR08.01.2016
IS07.02.2016
PT08.02.2016
Former [2016/39]AT07.10.2015
CZ07.10.2015
DK07.10.2015
EE07.10.2015
ES07.10.2015
FI07.10.2015
HR07.10.2015
IT07.10.2015
LT07.10.2015
LV07.10.2015
NL07.10.2015
PL07.10.2015
RO07.10.2015
SE07.10.2015
SK07.10.2015
NO07.01.2016
GR08.01.2016
IS07.02.2016
PT08.02.2016
Former [2016/36]AT07.10.2015
CZ07.10.2015
EE07.10.2015
ES07.10.2015
FI07.10.2015
HR07.10.2015
IT07.10.2015
LT07.10.2015
LV07.10.2015
NL07.10.2015
PL07.10.2015
RO07.10.2015
SE07.10.2015
SK07.10.2015
NO07.01.2016
GR08.01.2016
IS07.02.2016
PT08.02.2016
Former [2016/34]AT07.10.2015
CZ07.10.2015
ES07.10.2015
FI07.10.2015
HR07.10.2015
IT07.10.2015
LT07.10.2015
LV07.10.2015
NL07.10.2015
PL07.10.2015
SE07.10.2015
NO07.01.2016
GR08.01.2016
IS07.02.2016
PT08.02.2016
Former [2016/25]AT07.10.2015
ES07.10.2015
FI07.10.2015
HR07.10.2015
IT07.10.2015
LT07.10.2015
LV07.10.2015
NL07.10.2015
PL07.10.2015
SE07.10.2015
NO07.01.2016
GR08.01.2016
IS07.02.2016
PT08.02.2016
Former [2016/24]AT07.10.2015
ES07.10.2015
FI07.10.2015
HR07.10.2015
IT07.10.2015
LT07.10.2015
NL07.10.2015
PL07.10.2015
SE07.10.2015
NO07.01.2016
GR08.01.2016
IS07.02.2016
PT08.02.2016
Former [2016/23]ES07.10.2015
HR07.10.2015
IT07.10.2015
LT07.10.2015
NL07.10.2015
SE07.10.2015
NO07.01.2016
IS07.02.2016
Former [2016/22]ES07.10.2015
IT07.10.2015
LT07.10.2015
NL07.10.2015
NO07.01.2016
IS07.02.2016
Former [2016/21]ES07.10.2015
IT07.10.2015
LT07.10.2015
NO07.01.2016
Former [2016/20]ES07.10.2015
LT07.10.2015
Documents cited:Search[XY]FR529108  (EDGAR ROUSE SUTCLIFFE [FR]) [X] 1,7,8,15 * page 1, line 35 - page 2, line 63 * * page 2, line 103 - page 3, line 58; figure - * [Y] 2-6,9-14;
 [Y]EP1527811  (WAM SPA [IT]) [Y] 2-6 * paragraphs [0012] - [0018]; figure - *;
 [DY]FR2832349  (LAFARGE MORTIERS SA [FR]) [DY] 9-14 * page 10, lines 6-11 * * page 12 * * page 14, lines 21-28; figure - *
ExaminationUS4449826
by applicantFR2832349
 EP1527811
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.