EP2022893 - Method for identifying a break in a sheet of fibrous material in a section of a production machine for fibrous sheet material and device for implementing the method [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.10.2013 Database last updated on 02.11.2024 | Most recent event Tooltip | 17.07.2015 | Lapse of the patent in a contracting state New state(s): HU, LU | published on 19.08.2015 [2015/34] | Applicant(s) | For all designated states Voith Patent GmbH St. Pöltener Str. 43 89522 Heidenheim / DE | [N/P] |
Former [2012/51] | For all designated states Voith Patent GmbH Sankt Pöltener Strasse 43 89522 Heidenheim / DE | ||
Former [2009/07] | For all designated states Voith Patent GmbH Sankt Pöltener Strasse 43 89522 Heidenheim / DE | Inventor(s) | 01 /
Bauer, Armin Mariazellerstrasse 18 3100 St. Pölten / AT | 02 /
Üblacker, Armin Reichersdorf 8 3364 Neuhofen / AT | [2009/07] | Application number, filing date | 08161037.0 | 24.07.2008 | [2009/07] | Priority number, date | DE20071034828 | 26.07.2007 Original published format: DE102007034828 | [2009/07] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2022893 | Date: | 11.02.2009 | Language: | DE | [2009/07] | Type: | A3 Search report | No.: | EP2022893 | Date: | 21.12.2011 | Language: | DE | [2011/51] | Type: | B1 Patent specification | No.: | EP2022893 | Date: | 19.12.2012 | Language: | DE | [2012/51] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.11.2011 | Classification | IPC: | D21F7/04 | [2009/07] | CPC: |
D21F7/04 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2009/07] | Title | German: | Verfahren zur Erfassung eines Abrisses einer Faserstoffbahn in einer Sektion einer Maschine zur Herstellung der Faserstoffbahn und Vorrichtung zur Durchfühung des Verfahrens | [2009/07] | English: | Method for identifying a break in a sheet of fibrous material in a section of a production machine for fibrous sheet material and device for implementing the method | [2009/07] | French: | Procédé destiné à détecter un condensé d'une bande fibreuse dans une section d'une machine destinée à la fabrication d'une bande fibreuse et dispositif destiné à la réalisation du procédé | [2009/07] | Examination procedure | 21.06.2012 | Amendment by applicant (claims and/or description) | 21.06.2012 | Examination requested [2012/31] | 23.07.2012 | Communication of intention to grant the patent | 12.11.2012 | Fee for grant paid | 12.11.2012 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.07.2012 | Opposition(s) | 20.09.2013 | No opposition filed within time limit [2013/48] | Fees paid | Renewal fee | 02.08.2010 | Renewal fee patent year 03 | 01.08.2011 | Renewal fee patent year 04 | 31.07.2012 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.07.2008 | CY | 19.12.2012 | CZ | 19.12.2012 | DK | 19.12.2012 | EE | 19.12.2012 | HR | 19.12.2012 | IT | 19.12.2012 | LT | 19.12.2012 | LV | 19.12.2012 | MC | 19.12.2012 | MT | 19.12.2012 | NL | 19.12.2012 | PL | 19.12.2012 | RO | 19.12.2012 | SI | 19.12.2012 | SK | 19.12.2012 | TR | 19.12.2012 | BG | 19.03.2013 | NO | 19.03.2013 | GR | 20.03.2013 | ES | 30.03.2013 | IS | 19.04.2013 | PT | 19.04.2013 | GB | 24.07.2013 | IE | 24.07.2013 | LU | 24.07.2013 | BE | 31.07.2013 | CH | 31.07.2013 | FR | 31.07.2013 | LI | 31.07.2013 | [2015/34] |
Former [2015/32] | CY | 19.12.2012 | |
CZ | 19.12.2012 | ||
DK | 19.12.2012 | ||
EE | 19.12.2012 | ||
HR | 19.12.2012 | ||
IT | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
MC | 19.12.2012 | ||
MT | 19.12.2012 | ||
NL | 19.12.2012 | ||
PL | 19.12.2012 | ||
RO | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
TR | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
PT | 19.04.2013 | ||
GB | 24.07.2013 | ||
IE | 24.07.2013 | ||
BE | 31.07.2013 | ||
CH | 31.07.2013 | ||
FR | 31.07.2013 | ||
LI | 31.07.2013 | ||
Former [2014/33] | CY | 19.12.2012 | |
CZ | 19.12.2012 | ||
DK | 19.12.2012 | ||
EE | 19.12.2012 | ||
HR | 19.12.2012 | ||
IT | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
MC | 19.12.2012 | ||
NL | 19.12.2012 | ||
PL | 19.12.2012 | ||
RO | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
PT | 19.04.2013 | ||
GB | 24.07.2013 | ||
IE | 24.07.2013 | ||
BE | 31.07.2013 | ||
CH | 31.07.2013 | ||
FR | 31.07.2013 | ||
LI | 31.07.2013 | ||
Former [2014/24] | CY | 19.12.2012 | |
CZ | 19.12.2012 | ||
DK | 19.12.2012 | ||
EE | 19.12.2012 | ||
HR | 19.12.2012 | ||
IT | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
MC | 19.12.2012 | ||
NL | 19.12.2012 | ||
PL | 19.12.2012 | ||
RO | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
PT | 19.04.2013 | ||
GB | 24.07.2013 | ||
BE | 31.07.2013 | ||
CH | 31.07.2013 | ||
FR | 31.07.2013 | ||
LI | 31.07.2013 | ||
Former [2014/23] | CY | 19.12.2012 | |
CZ | 19.12.2012 | ||
DK | 19.12.2012 | ||
EE | 19.12.2012 | ||
HR | 19.12.2012 | ||
IT | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
MC | 19.12.2012 | ||
NL | 19.12.2012 | ||
PL | 19.12.2012 | ||
RO | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
PT | 19.04.2013 | ||
GB | 24.07.2013 | ||
BE | 31.07.2013 | ||
CH | 31.07.2013 | ||
LI | 31.07.2013 | ||
Former [2014/21] | CY | 19.12.2012 | |
CZ | 19.12.2012 | ||
DK | 19.12.2012 | ||
EE | 19.12.2012 | ||
HR | 19.12.2012 | ||
IT | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
MC | 19.12.2012 | ||
NL | 19.12.2012 | ||
PL | 19.12.2012 | ||
RO | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
PT | 19.04.2013 | ||
GB | 24.07.2013 | ||
CH | 31.07.2013 | ||
LI | 31.07.2013 | ||
Former [2014/20] | CY | 19.12.2012 | |
CZ | 19.12.2012 | ||
DK | 19.12.2012 | ||
EE | 19.12.2012 | ||
HR | 19.12.2012 | ||
IT | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
MC | 19.12.2012 | ||
NL | 19.12.2012 | ||
PL | 19.12.2012 | ||
RO | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
PT | 19.04.2013 | ||
CH | 31.07.2013 | ||
LI | 31.07.2013 | ||
Former [2014/14] | CY | 19.12.2012 | |
CZ | 19.12.2012 | ||
DK | 19.12.2012 | ||
EE | 19.12.2012 | ||
HR | 19.12.2012 | ||
IT | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
MC | 19.12.2012 | ||
NL | 19.12.2012 | ||
PL | 19.12.2012 | ||
RO | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
PT | 19.04.2013 | ||
Former [2014/03] | CY | 19.12.2012 | |
CZ | 19.12.2012 | ||
DK | 19.12.2012 | ||
EE | 19.12.2012 | ||
HR | 19.12.2012 | ||
IT | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
NL | 19.12.2012 | ||
PL | 19.12.2012 | ||
RO | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
PT | 19.04.2013 | ||
Former [2013/52] | CY | 19.12.2012 | |
CZ | 19.12.2012 | ||
DK | 19.12.2012 | ||
EE | 19.12.2012 | ||
HR | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
NL | 19.12.2012 | ||
PL | 19.12.2012 | ||
RO | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
PT | 19.04.2013 | ||
Former [2013/51] | CZ | 19.12.2012 | |
DK | 19.12.2012 | ||
EE | 19.12.2012 | ||
HR | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
NL | 19.12.2012 | ||
PL | 19.12.2012 | ||
RO | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
PT | 19.04.2013 | ||
Former [2013/48] | CZ | 19.12.2012 | |
DK | 19.12.2012 | ||
EE | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
NL | 19.12.2012 | ||
PL | 19.12.2012 | ||
RO | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
PT | 19.04.2013 | ||
Former [2013/40] | CZ | 19.12.2012 | |
EE | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
NL | 19.12.2012 | ||
PL | 19.12.2012 | ||
RO | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
PT | 19.04.2013 | ||
Former [2013/37] | CZ | 19.12.2012 | |
EE | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
NL | 19.12.2012 | ||
PL | 19.12.2012 | ||
RO | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
Former [2013/36] | CZ | 19.12.2012 | |
EE | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
PL | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
Former [2013/35] | CZ | 19.12.2012 | |
EE | 19.12.2012 | ||
LT | 19.12.2012 | ||
LV | 19.12.2012 | ||
SI | 19.12.2012 | ||
SK | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
Former [2013/34] | LT | 19.12.2012 | |
LV | 19.12.2012 | ||
SI | 19.12.2012 | ||
BG | 19.03.2013 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
IS | 19.04.2013 | ||
Former [2013/26] | LT | 19.12.2012 | |
LV | 19.12.2012 | ||
SI | 19.12.2012 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
Former [2013/24] | LT | 19.12.2012 | |
LV | 19.12.2012 | ||
NO | 19.03.2013 | ||
GR | 20.03.2013 | ||
ES | 30.03.2013 | ||
Former [2013/23] | LT | 19.12.2012 | |
LV | 19.12.2012 | ||
NO | 19.03.2013 | ||
ES | 30.03.2013 | ||
Former [2013/20] | LT | 19.12.2012 | |
NO | 19.03.2013 | Documents cited: | Search | [XP]EP1936030 (VOITH PATENT GMBH [DE]) [XP] 1-4,7-12,15,16 * paragraphs [0020] - [0024] - [0039] , [0040] * * figure 3 *; | [AD]DE4216653 (VOITH GMBH J M [DE]) [AD] 1-16 * abstract * * column 3, line 49 - column 4, line 44 * * figure 2 * | by applicant | DE4216653 |