EP2056116 - Method and device for predicting failures of an electrolytic capacitor, converter and uninterruptible power supply equipped with such a device [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.05.2019 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 08.06.2018 | ||
Former | Grant of patent is intended Status updated on 03.05.2018 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states MGE UPS Systems 140, avenue Jean Kuntzmann Zirst de Montbonnot 38330 Montbonnot-Saint-Martin / FR | [2009/19] | Inventor(s) | 01 /
Abdennadher, Karim Schneider Electric Industries SAS -Sce Propriété Industrielle 38050 Grenoble Cedex 09 / FR | 02 /
Rosset, Christophe Schneider Electric Industries SAS -Sce Propriété Industrielle 38050 Grenoble Cedex 09 / FR | 03 /
Rojat, Gérard World Trade Center Sce Propriété Industrielle 38 EE1 5 Place Robert Schuman 38050 Grenoble Cedex 9 / FR | 04 /
Venet, Pascal Schneider Electric Industries SAS -Sce Propriété Industrielle 38050 Grenoble Cedex 09 / FR | [2018/28] |
Former [2009/24] | 01 /
Abdennadher, Karim Schneider Electric Industries SAS -Sce Propriété Industrielle 38050 Grenoble Cedex 09 / FR | ||
02 /
Rosset, Christophe Schneider Electric Industries SAS -Sce Propriété Industrielle 38050 Grenoble Cedex 09 / FR | |||
03 /
Rojat, Gérard World Trade Center Sce Propriété Industrielle 38 EE1 5 Place Robert Schuman 38050 Grenoble Cedex 9 / FR | |||
04 /
Venet, Pascal Schneider Electric Industries SAS -Sce Propriété Industrielle 38050 Grenoble Cedex 09 / FR | |||
Former [2009/19] | 01 /
Abdennadher, Karim Schneider Electric Industries SAS -Sce Propriété Industrielle 38050 Grenoble Cedex 09 / FR | ||
02 /
Rosset, Christophe Schneider Electric Industries SAS -Sce Propriété Industrielle 38050 Grenoble Cedex 09 / FR | |||
03 /
Rojat, Gérard Schneider Electric Industries SAS -Sce Propriété Industrielle 38050 Grenoble Cedex 09 / FR | |||
04 /
Venet, Pascal Schneider Electric Industries SAS -Sce Propriété Industrielle 38050 Grenoble Cedex 09 / FR | Representative(s) | Tripodi, Paul, et al Schneider Electric Industries SAS Service Propriété Industrielle World Trade Center - E1 5 Place Robert Schuman 38050 Grenoble Cedex 9 / FR | [2018/28] |
Former [2009/28] | Tripodi, Paul, et al Schneider Electric Industries SAS Service Propriété Industrielle World Trade Center - E1 5 Place Robert Schuman 38050 Grenoble Cedex 9 / FR | ||
Former [2009/19] | Tripodi, Paul, et al Schneider Electric Industries SAS Service Propriété Industrielle WTC / E1 5 Place Robert Schuman 38050 Grenoble Cedex 09 / FR | Application number, filing date | 08354066.6 | 01.10.2008 | [2009/19] | Priority number, date | FR20070007620 | 30.10.2007 Original published format: FR 0707620 | [2009/19] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP2056116 | Date: | 06.05.2009 | Language: | FR | [2009/19] | Type: | B1 Patent specification | No.: | EP2056116 | Date: | 11.07.2018 | Language: | FR | [2018/28] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.03.2009 | Classification | IPC: | G01R31/40, G01R31/02, G01R27/26 | [2018/16] | CPC: |
G01R27/2605 (EP,US);
G01R31/40 (EP,US);
G01R31/64 (EP,US)
|
Former IPC [2009/19] | G01R27/26 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/28] |
Former [2009/19] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | Verfahren und Vorrichtung zur Vorhersage von Störungen eines Elekrolytkondensators, Wandler und unterbrechungsfreie Stromversorgung, die mit einer solchen Vorrichtung ausgestattet sind | [2009/19] | English: | Method and device for predicting failures of an electrolytic capacitor, converter and uninterruptible power supply equipped with such a device | [2009/19] | French: | Procédé et dispositif de prédiction de défaillances de condensateur électrolytique, convertisseur et alimentation sans interruption equipés d'un tel dispositif | [2018/16] |
Former [2009/19] | Procédé et dispositif de prédiction de défaillances de condensateur électrolytique, convertisseur et alimentation sans interuption equipés d'un tel dispositif | Examination procedure | 25.05.2009 | Examination requested [2009/28] | 22.06.2009 | Despatch of a communication from the examining division (Time limit: M04) | 09.09.2009 | Reply to a communication from the examining division | 07.06.2016 | Despatch of a communication from the examining division (Time limit: M04) | 23.09.2016 | Reply to a communication from the examining division | 04.05.2018 | Communication of intention to grant the patent | 04.06.2018 | Fee for grant paid | 04.06.2018 | Fee for publishing/printing paid | 04.06.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 22.06.2009 | Opposition(s) | 12.04.2019 | No opposition filed within time limit [2019/25] | Fees paid | Renewal fee | 11.10.2010 | Renewal fee patent year 03 | 08.10.2011 | Renewal fee patent year 04 | 23.10.2012 | Renewal fee patent year 05 | 24.10.2013 | Renewal fee patent year 06 | 13.10.2014 | Renewal fee patent year 07 | 08.10.2015 | Renewal fee patent year 08 | 07.10.2016 | Renewal fee patent year 09 | 16.10.2017 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.10.2008 | AT | 11.07.2018 | CY | 11.07.2018 | CZ | 11.07.2018 | DK | 11.07.2018 | EE | 11.07.2018 | FI | 11.07.2018 | HR | 11.07.2018 | LT | 11.07.2018 | LV | 11.07.2018 | MC | 11.07.2018 | MT | 11.07.2018 | NL | 11.07.2018 | PL | 11.07.2018 | PT | 11.07.2018 | RO | 11.07.2018 | SE | 11.07.2018 | SI | 11.07.2018 | SK | 11.07.2018 | TR | 11.07.2018 | IE | 01.10.2018 | LU | 01.10.2018 | BG | 11.10.2018 | NO | 11.10.2018 | GR | 12.10.2018 | BE | 31.10.2018 | CH | 31.10.2018 | LI | 31.10.2018 | IS | 11.11.2018 | [2020/32] |
Former [2020/30] | HU | 01.10.2008 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
MT | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
PT | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
TR | 11.07.2018 | ||
IE | 01.10.2018 | ||
LU | 01.10.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
IS | 11.11.2018 | ||
Former [2020/27] | AT | 11.07.2018 | |
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
MT | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
PT | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
TR | 11.07.2018 | ||
IE | 01.10.2018 | ||
LU | 01.10.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
IS | 11.11.2018 | ||
Former [2020/16] | AT | 11.07.2018 | |
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
MT | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
TR | 11.07.2018 | ||
IE | 01.10.2018 | ||
LU | 01.10.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
IS | 11.11.2018 | ||
Former [2020/08] | AT | 11.07.2018 | |
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
MT | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
IE | 01.10.2018 | ||
LU | 01.10.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/48] | AT | 11.07.2018 | |
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
IE | 01.10.2018 | ||
LU | 01.10.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/40] | AT | 11.07.2018 | |
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
LU | 01.10.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/38] | AT | 11.07.2018 | |
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
LU | 01.10.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
BE | 31.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/37] | AT | 11.07.2018 | |
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
LU | 01.10.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/30] | AT | 11.07.2018 | |
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SK | 11.07.2018 | ||
LU | 01.10.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/28] | AT | 11.07.2018 | |
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SK | 11.07.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/26] | AT | 11.07.2018 | |
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SK | 11.07.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/24] | AT | 11.07.2018 | |
CZ | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SK | 11.07.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/22] | AT | 11.07.2018 | |
CZ | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/12] | AT | 11.07.2018 | |
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
SE | 11.07.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/11] | AT | 11.07.2018 | |
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
SE | 11.07.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/10] | AT | 11.07.2018 | |
FI | 11.07.2018 | ||
LT | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
SE | 11.07.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/08] | FI | 11.07.2018 | |
LT | 11.07.2018 | ||
NL | 11.07.2018 | ||
NO | 11.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/07] | LT | 11.07.2018 | |
NL | 11.07.2018 | ||
Former [2019/04] | NL | 11.07.2018 | Documents cited: | Search | [DX]EP1198715 (UNIV CLAUDE BERNARD LYON [FR]) [DX] 1-14 * the whole document *; | [A]US2007103136 (JAIN PRAVEEN K [CA]) [A] 1-14 * paragraphs [0001] , [0005] , [0060] - [0062] - [0065]; figures 4,6 *; | [A] - PERISSE F ET AL, "Simple model of an electrolytic capacitor taking into account the temperature and aging time", ELECTRICAL ENGINEERING SPRINGER-VERLAG GERMANY, (200601), vol. 88, no. 2, ISSN 0948-7921, pages 89 - 95, XP002481419 [A] 1-14 * the whole document * DOI: http://dx.doi.org/10.1007/s00202-004-0265-z | [A] - LEE D-C ET AL, "Online capacitance estimation of DC-link electrolytic capacitors for three-phase AC/DC/AC PWM converters using recursive least squares method", IEE PROCEEDINGS: ELECTRIC POWER APPLICATIONS, INSTITUTION OF ELECTRICAL ENGINEERS, GB, (20051104), vol. 152, no. 6, ISSN 1350-2352, pages 1503 - 1508, XP006025429 [A] 1-14 * abstract * * paragraphs [02.3] , [02.4] * DOI: http://dx.doi.org/10.1049/ip-epa:20050027 | [A] - IMAM A M ET AL, "Condition Monitoring of Electrolytic Capacitor in Power Electronic Circuits using Adaptive Filter Modeling", POWER ELECTRONICS SPECIALISTS, 2005 IEEE 36TH CONFERENCE ON JUNE 12, 2005, PISCATAWAY, NJ, USA,IEEE, (20050612), ISBN 978-0-7803-9033-1, pages 601 - 607, XP010883269 [A] 1-14 * abstract * * paragraphs [0001] , [004A] * DOI: http://dx.doi.org/10.1109/PESC.2005.1581687 | by applicant | EP1198715 |