| EP2108225 - COMMUNICATION METHOD AND DEVICE [Right-click to bookmark this link] | Status | Patent maintained as amended Status updated on 07.01.2022 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 23.03.2018 | ||
| Former | Grant of patent is intended Status updated on 12.11.2017 | Most recent event Tooltip | 07.01.2022 | Patent maintained (B2 publication) | published on 09.02.2022 [2022/06] | Applicant(s) | For all designated states Sato Holdings Corporation 1-7-1, Shimomeguro Meguro-ku Tokyo 153-0064 / JP | [2022/06] |
| Former [2016/27] | For all designated states Sato Holdings Corporation 1-7-1, Shimomeguro Meguro-ku Tokyo 153-0064 / JP | ||
| Former [2014/30] | For all designated states Sato Vicinity Pty Ltd 1/1 Nursery Avenue Clayton Business Park Clayton VIC 3168 / AU | ||
| Former [2009/42] | For all designated states MAGELLAN TECHNOLOGY PTY. LIMITED 65 Johnston Street Annandale, NSW 2038 / AU | Inventor(s) | 01 /
MURDOCH, Graham, Alexander, Munro Unit 5, 1 Hume Street Wollstonecraft, NSW 2065 / AU | 02 /
LITTLECHILD, Stuart, Colin 162 Hawthorne Parade Haberfield, NSW 2045 / AU | [2009/42] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2022/06] |
| Former [2013/51] | Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | ||
| Former [2009/52] | Frost, Alex John, et al Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | ||
| Former [2009/42] | Frost, Alex John, et al Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | Application number, filing date | 08700366.1 | 21.01.2008 | [2009/42] | WO2008AU00068 | Priority number, date | AU2007900290P | 22.01.2007 Original published format: AU 2007900290 P | [2009/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2008089507 | Date: | 31.07.2008 | Language: | EN | [2008/31] | Type: | A1 Application with search report | No.: | EP2108225 | Date: | 14.10.2009 | Language: | EN | The application published by WIPO in one of the EPO official languages on 31.07.2008 takes the place of the publication of the European patent application. | [2009/42] | Type: | B1 Patent specification | No.: | EP2108225 | Date: | 25.04.2018 | Language: | EN | [2018/17] | Type: | B2 New European patent specification | No.: | EP2108225 | Date: | 09.02.2022 | Language: | EN | [2022/06] | Search report(s) | International search report - published on: | AU | 31.07.2008 | (Supplementary) European search report - dispatched on: | EP | 19.08.2014 | Classification | IPC: | H04L27/156, H04L25/49 | [2009/42] | CPC: |
H04L25/4902 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/17] |
| Former [2009/42] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | KOMMUNIKATIONSVERFAHREN UND EINRICHTUNG | [2009/42] | English: | COMMUNICATION METHOD AND DEVICE | [2009/42] | French: | PROCÉDÉ ET DISPOSITIF DE COMMUNICATION | [2009/42] | Entry into regional phase | 19.08.2009 | National basic fee paid | 19.08.2009 | Search fee paid | 19.08.2009 | Designation fee(s) paid | 19.08.2009 | Examination fee paid | Examination procedure | 19.08.2009 | Examination requested [2009/42] | 21.04.2015 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 16.06.2015 | Amendment by applicant (claims and/or description) | 24.11.2015 | Despatch of a communication from the examining division (Time limit: M04) | 23.03.2016 | Reply to a communication from the examining division | 13.11.2017 | Communication of intention to grant the patent | 13.03.2018 | Fee for grant paid | 13.03.2018 | Fee for publishing/printing paid | 13.03.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 24.11.2015 | Opposition(s) | Opponent(s) | 01
18.12.2018
21.12.2018
ADMISSIBLE BIOLOG-ID 46-48 Avenue du Général Leclerc 92100 Boulogne-Billancourt / FR Opponent's representative Lavoix 2, place d'Estienne d'Orves 75441 Paris Cedex 09 / FR | [2021/33] |
| Former [2019/04] | |||
| Opponent(s) | 01
18.12.2018
ADMISSIBLE BIOLOG-ID 12 rue Cambacérès 75008 Paris / FR Opponent's representative Lavoix 2, place d'Estienne d'Orves 75441 Paris Cedex 09 / FR | 08.02.2019 | Invitation to proprietor to file observations on the notice of opposition | 14.06.2019 | Reply of patent proprietor to notice(s) of opposition | 29.05.2020 | Cancellation of oral proceeding that was planned for 02.07.2020 | 02.07.2020 | Date of oral proceedings | 20.04.2021 | Date of oral proceedings | 03.05.2021 | Despatch of interlocutory decision in opposition | 03.05.2021 | Despatch of minutes of oral proceedings | 31.08.2021 | Legal effect of interlocutory decision in opposition | 14.09.2021 | Despatch of communication that the patent will be maintained as amended | 16.12.2021 | Fee for printing new specification paid | Appeal following opposition | 01.07.2021 | Appeal received No. T1010/21 | 01.07.2021 | Payment of appeal fee | 31.08.2021 | Result of appeal procedure: appeal of the opponent withdrawn | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 16.06.2015 | Request for further processing filed | 16.06.2015 | Full payment received (date of receipt of payment) Request granted | 25.06.2015 | Decision despatched | Fees paid | Renewal fee | 22.01.2010 | Renewal fee patent year 03 | 31.01.2011 | Renewal fee patent year 04 | 25.01.2012 | Renewal fee patent year 05 | 28.01.2013 | Renewal fee patent year 06 | 30.01.2014 | Renewal fee patent year 07 | 23.01.2015 | Renewal fee patent year 08 | 27.01.2016 | Renewal fee patent year 09 | 20.01.2017 | Renewal fee patent year 10 | 30.01.2018 | Renewal fee patent year 11 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.01.2008 | AT | 25.04.2018 | CY | 25.04.2018 | CZ | 25.04.2018 | DK | 25.04.2018 | EE | 25.04.2018 | ES | 25.04.2018 | FI | 25.04.2018 | HR | 25.04.2018 | IT | 25.04.2018 | LT | 25.04.2018 | LV | 25.04.2018 | MC | 25.04.2018 | NL | 25.04.2018 | PL | 25.04.2018 | RO | 25.04.2018 | SE | 25.04.2018 | SI | 25.04.2018 | SK | 25.04.2018 | TR | 25.04.2018 | BG | 25.07.2018 | NO | 25.07.2018 | GR | 26.07.2018 | IS | 25.08.2018 | PT | 27.08.2018 | IE | 21.01.2019 | LU | 21.01.2019 | MT | 21.01.2019 | BE | 31.01.2019 | CH | 31.01.2019 | LI | 31.01.2019 | [2021/32] |
| Former [2021/31] | AT | 25.04.2018 | |
| CY | 25.04.2018 | ||
| CZ | 25.04.2018 | ||
| DK | 25.04.2018 | ||
| EE | 25.04.2018 | ||
| ES | 25.04.2018 | ||
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| IT | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| MC | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| RO | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| SI | 25.04.2018 | ||
| SK | 25.04.2018 | ||
| TR | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| IS | 25.08.2018 | ||
| PT | 27.08.2018 | ||
| IE | 21.01.2019 | ||
| LU | 21.01.2019 | ||
| MT | 21.01.2019 | ||
| BE | 31.01.2019 | ||
| CH | 31.01.2019 | ||
| LI | 31.01.2019 | ||
| Former [2021/26] | AT | 25.04.2018 | |
| CY | 25.04.2018 | ||
| CZ | 25.04.2018 | ||
| DK | 25.04.2018 | ||
| EE | 25.04.2018 | ||
| ES | 25.04.2018 | ||
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| IT | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| MC | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| RO | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| SI | 25.04.2018 | ||
| SK | 25.04.2018 | ||
| TR | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| PT | 27.08.2018 | ||
| IE | 21.01.2019 | ||
| LU | 21.01.2019 | ||
| MT | 21.01.2019 | ||
| BE | 31.01.2019 | ||
| CH | 31.01.2019 | ||
| LI | 31.01.2019 | ||
| Former [2020/29] | AT | 25.04.2018 | |
| CZ | 25.04.2018 | ||
| DK | 25.04.2018 | ||
| EE | 25.04.2018 | ||
| ES | 25.04.2018 | ||
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| IT | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| MC | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| RO | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| SI | 25.04.2018 | ||
| SK | 25.04.2018 | ||
| TR | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| PT | 27.08.2018 | ||
| IE | 21.01.2019 | ||
| LU | 21.01.2019 | ||
| MT | 21.01.2019 | ||
| BE | 31.01.2019 | ||
| CH | 31.01.2019 | ||
| LI | 31.01.2019 | ||
| Former [2020/16] | AT | 25.04.2018 | |
| CZ | 25.04.2018 | ||
| DK | 25.04.2018 | ||
| EE | 25.04.2018 | ||
| ES | 25.04.2018 | ||
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| IT | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| MC | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| RO | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| SI | 25.04.2018 | ||
| SK | 25.04.2018 | ||
| TR | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| PT | 27.08.2018 | ||
| IE | 21.01.2019 | ||
| LU | 21.01.2019 | ||
| BE | 31.01.2019 | ||
| CH | 31.01.2019 | ||
| LI | 31.01.2019 | ||
| Former [2020/09] | AT | 25.04.2018 | |
| CZ | 25.04.2018 | ||
| DK | 25.04.2018 | ||
| EE | 25.04.2018 | ||
| ES | 25.04.2018 | ||
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| IT | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| MC | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| RO | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| SI | 25.04.2018 | ||
| SK | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| PT | 27.08.2018 | ||
| IE | 21.01.2019 | ||
| LU | 21.01.2019 | ||
| BE | 31.01.2019 | ||
| CH | 31.01.2019 | ||
| LI | 31.01.2019 | ||
| Former [2020/04] | AT | 25.04.2018 | |
| CZ | 25.04.2018 | ||
| DK | 25.04.2018 | ||
| EE | 25.04.2018 | ||
| ES | 25.04.2018 | ||
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| IT | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| MC | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| RO | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| SI | 25.04.2018 | ||
| SK | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| PT | 27.08.2018 | ||
| LU | 21.01.2019 | ||
| BE | 31.01.2019 | ||
| CH | 31.01.2019 | ||
| LI | 31.01.2019 | ||
| Former [2019/51] | AT | 25.04.2018 | |
| CZ | 25.04.2018 | ||
| DK | 25.04.2018 | ||
| EE | 25.04.2018 | ||
| ES | 25.04.2018 | ||
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| IT | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| MC | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| RO | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| SI | 25.04.2018 | ||
| SK | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| PT | 27.08.2018 | ||
| LU | 21.01.2019 | ||
| BE | 31.01.2019 | ||
| Former [2019/44] | AT | 25.04.2018 | |
| CZ | 25.04.2018 | ||
| DK | 25.04.2018 | ||
| EE | 25.04.2018 | ||
| ES | 25.04.2018 | ||
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| IT | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| MC | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| RO | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| SI | 25.04.2018 | ||
| SK | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| PT | 27.08.2018 | ||
| LU | 21.01.2019 | ||
| Former [2019/40] | AT | 25.04.2018 | |
| CZ | 25.04.2018 | ||
| DK | 25.04.2018 | ||
| EE | 25.04.2018 | ||
| ES | 25.04.2018 | ||
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| IT | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| MC | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| RO | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| SI | 25.04.2018 | ||
| SK | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| PT | 27.08.2018 | ||
| Former [2019/26] | AT | 25.04.2018 | |
| CZ | 25.04.2018 | ||
| DK | 25.04.2018 | ||
| EE | 25.04.2018 | ||
| ES | 25.04.2018 | ||
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| IT | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| RO | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| SI | 25.04.2018 | ||
| SK | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| PT | 27.08.2018 | ||
| Former [2019/12] | AT | 25.04.2018 | |
| CZ | 25.04.2018 | ||
| DK | 25.04.2018 | ||
| EE | 25.04.2018 | ||
| ES | 25.04.2018 | ||
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| IT | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| RO | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| SK | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| PT | 27.08.2018 | ||
| Former [2019/10] | AT | 25.04.2018 | |
| CZ | 25.04.2018 | ||
| DK | 25.04.2018 | ||
| EE | 25.04.2018 | ||
| ES | 25.04.2018 | ||
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| RO | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| SK | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| PT | 27.08.2018 | ||
| Former [2019/09] | DK | 25.04.2018 | |
| EE | 25.04.2018 | ||
| ES | 25.04.2018 | ||
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| PT | 27.08.2018 | ||
| Former [2019/08] | DK | 25.04.2018 | |
| ES | 25.04.2018 | ||
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| PT | 27.08.2018 | ||
| Former [2019/03] | ES | 25.04.2018 | |
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| PT | 27.08.2018 | ||
| Former [2018/52] | ES | 25.04.2018 | |
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| GR | 26.07.2018 | ||
| Former [2018/51] | ES | 25.04.2018 | |
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| LV | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| Former [2018/50] | ES | 25.04.2018 | |
| FI | 25.04.2018 | ||
| HR | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| Former [2018/49] | ES | 25.04.2018 | |
| FI | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| PL | 25.04.2018 | ||
| SE | 25.04.2018 | ||
| BG | 25.07.2018 | ||
| NO | 25.07.2018 | ||
| Former [2018/47] | ES | 25.04.2018 | |
| FI | 25.04.2018 | ||
| LT | 25.04.2018 | ||
| NL | 25.04.2018 | ||
| NO | 25.07.2018 | ||
| Former [2018/43] | NL | 25.04.2018 | Documents cited: | Search | [XA] US2006093029 (BECKER MATTHEW E et al.) | [XA] LUEFTNER T ET AL: "Edge-position modulation for high-speed wireless infrared communications", 20031005, vol. 150, no. 5, 5 October 2003 (2003-10-05), pages 427 - 437, XP006024258 | International search | [X] US2003142742 (HARTMANN CLINTON S et al.) | by applicant | WO9934526 | US2006093029 | Opposition | US3394312 | US2006203713 | WO02057928 | US2006093029 | US2006269005 | WO9934526 | US2003142742 | US5488628 | LUEFTNER T ET AL.: "Edge-position modulation for high speed wireless infrared communications", IEE PROC. -OPTOELECTRON., vol. 150, no. 5, 5 October 2003 (2003-10-05), pages 427 - 437, XP006024258 |