EP2245869 - METHOD FOR HANDOVER OF TERMINAL, NETWORK ELEMENT, BASE STATION, AND COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 03.08.2024 | |
Former | The patent has been granted Status updated on 05.07.2019 | ||
Former | Grant of patent is intended Status updated on 26.03.2019 | ||
Former | Examination is in progress Status updated on 04.11.2016 | Most recent event Tooltip | 24.06.2022 | Lapse of the patent in a contracting state New state(s): CY, HU, MT | published on 27.07.2022 [2022/30] | Applicant(s) | For all designated states Alcatel-Lucent USA Inc. 600-700 Mountain Avenue Murray Hill, NJ 07974 / US | [2013/13] |
Former [2010/44] | For all designated states Lucent Technologies Inc. 600-700 Mountain Avenue PO Box 636 Murray Hill, New Jersey 07974-0636 / US | Inventor(s) | 01 /
CHI, Caixia Long Xi Yuan Yi Qu 9-4-601 Hui Long Guan Beijing 100085 / CN | 02 /
HAO, Ruibing 14-18G Shi Ji Chen Hai Dian District Beijing 100080 / CN | 03 /
LIU, Fang Bo Ya Xi Yuan 9-2-502 Hai Dian District Beijing 100080 / CN | 04 /
CAI, Xuejun Bo Ya Xi Yuan 9-2-502 Hai Dian District Beijing 100080 / CN | [2019/32] |
Former [2010/44] | 01 /
CHI, Caixia Long Xi Yuan Yi Qu 9-4-601 Hui Long Guan Beijing 100085 / CN | ||
02 /
HAO, Ruibing 14-18G Shi Ji Chen Hai Dian District Beijing 100080 / CN | |||
03 /
LIU, Fang Bo Ya Xi Yuan 9-2-502 Hai Dian District Beijing 100080 / CN | |||
04 /
CAI, Xuejun Bo Ya Xi Yuan 9-2-502 Hai Dian District Beijing 100080 / CN | Representative(s) | Richardt Patentanwälte PartG mbB Wilhelmstraße 7 65185 Wiesbaden / DE | [2019/32] |
Former [2011/10] | Richardt Patentanwälte Wilhelmstraße 7 65185 Wiesbaden / DE | ||
Former [2010/44] | Richardt, Markus Albert Richardt Patents Trademarks Wilhelmstraße 7 65185 Wiesbaden / DE | Application number, filing date | 08700677.1 | 17.01.2008 | [2010/44] | WO2008CN00128 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009089658 | Date: | 23.07.2009 | Language: | EN | [2009/30] | Type: | A1 Application with search report | No.: | EP2245869 | Date: | 03.11.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.07.2009 takes the place of the publication of the European patent application. | [2010/44] | Type: | B1 Patent specification | No.: | EP2245869 | Date: | 07.08.2019 | Language: | EN | [2019/32] | Search report(s) | International search report - published on: | CN | 23.07.2009 | (Supplementary) European search report - dispatched on: | EP | 15.01.2013 | Classification | IPC: | H04W36/14 | [2013/07] | CPC: |
H04W36/14 (EP,US);
H04W36/302 (EP,US)
|
Former IPC [2010/44] | H04W4/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2019/32] |
Former [2010/44] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | VERFAHREN ZUR WEITERREICHUNG EINES ENDGERÄTS, NETZELEMENT, BASISSTATION UND KOMMUNIKATIONSSYSTEM | [2010/44] | English: | METHOD FOR HANDOVER OF TERMINAL, NETWORK ELEMENT, BASE STATION, AND COMMUNICATION SYSTEM | [2010/44] | French: | PROCÉDÉ DE TRANSFERT INTERCELLULAIRE DE TERMINAL, ÉLÉMENT DE RÉSEAU, STATION DE BASE ET SYSTÈME DE COMMUNICATION | [2010/44] | Entry into regional phase | 17.08.2010 | National basic fee paid | 17.08.2010 | Search fee paid | 17.08.2010 | Designation fee(s) paid | 17.08.2010 | Examination fee paid | Examination procedure | 17.08.2010 | Examination requested [2010/44] | 05.07.2013 | Amendment by applicant (claims and/or description) | 08.11.2016 | Despatch of a communication from the examining division (Time limit: M04) | 17.01.2017 | Reply to a communication from the examining division | 31.05.2017 | Despatch of a communication from the examining division (Time limit: M04) | 11.09.2017 | Reply to a communication from the examining division | 27.03.2019 | Communication of intention to grant the patent | 27.06.2019 | Fee for grant paid | 27.06.2019 | Fee for publishing/printing paid | 27.06.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 08.11.2016 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 19.07.2010 | Renewal fee patent year 03 | 24.01.2011 | Renewal fee patent year 04 | 25.01.2012 | Renewal fee patent year 05 | 28.01.2013 | Renewal fee patent year 06 | 31.01.2014 | Renewal fee patent year 07 | 23.01.2015 | Renewal fee patent year 08 | 27.01.2016 | Renewal fee patent year 09 | 20.01.2017 | Renewal fee patent year 10 | 26.01.2018 | Renewal fee patent year 11 | 15.01.2019 | Renewal fee patent year 12 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Rights in Rem or Legal Means of Execution | deleted | [2014/47] |
Former [2013/40] | ID: | 01 | |
For: | all designated states | ||
Date: | 10.04.2013 | ||
[2014/47] | Lapses during opposition Tooltip | HU | 17.01.2008 | AT | 07.08.2019 | CY | 07.08.2019 | CZ | 07.08.2019 | DK | 07.08.2019 | EE | 07.08.2019 | ES | 07.08.2019 | FI | 07.08.2019 | HR | 07.08.2019 | IT | 07.08.2019 | LT | 07.08.2019 | LV | 07.08.2019 | MC | 07.08.2019 | MT | 07.08.2019 | NL | 07.08.2019 | PL | 07.08.2019 | RO | 07.08.2019 | SE | 07.08.2019 | SI | 07.08.2019 | SK | 07.08.2019 | TR | 07.08.2019 | BG | 07.11.2019 | NO | 07.11.2019 | GR | 08.11.2019 | IS | 07.12.2019 | PT | 09.12.2019 | GB | 17.01.2020 | IE | 17.01.2020 | LU | 17.01.2020 | BE | 31.01.2020 | CH | 31.01.2020 | FR | 31.01.2020 | LI | 31.01.2020 | [2022/27] |
Former [2021/08] | AT | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
GB | 17.01.2020 | ||
IE | 17.01.2020 | ||
LU | 17.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
FR | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2020/51] | AT | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
GB | 17.01.2020 | ||
LU | 17.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
FR | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2020/48] | AT | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
GB | 17.01.2020 | ||
LU | 17.01.2020 | ||
FR | 31.01.2020 | ||
Former [2020/46] | AT | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
LU | 17.01.2020 | ||
Former [2020/39] | AT | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/37] | AT | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/36] | AT | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/25] | AT | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AT | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AT | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/22] | DK | 07.08.2019 | |
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/17] | ES | 07.08.2019 | |
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/12] | ES | 07.08.2019 | |
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/11] | ES | 07.08.2019 | |
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
Former [2020/10] | FI | 07.08.2019 | |
LT | 07.08.2019 | ||
NL | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
PT | 09.12.2019 | ||
Former [2020/09] | FI | 07.08.2019 | |
LT | 07.08.2019 | ||
NL | 07.08.2019 | ||
NO | 07.11.2019 | ||
Former [2020/08] | LT | 07.08.2019 | |
NO | 07.11.2019 | Cited in | International search | [A]US2002068571 (OHLSSON JONAS [SE], et al); | [A]CN1396734 (SHANGHAI INST NO 2 ZHONGXING C [CN]); | [A]US2006094432 (CHANG JEN-CHUN [TW], et al); | [A]CN1794681 (SHANGHAI BEIHAO COMM ELECTRONI [CN]) |