EP2079250 - ESTABLISHING S1 SIGNALING CONNECTION IN EVOLVED NETWORK [Right-click to bookmark this link] | |||
Former [2009/29] | METHOD, DEVICE AND SYSTEM FOR ESTABLISHING S1 SIGNALING CONNECTION IN EVOLVED NETWORK | ||
[2012/44] | Status | Patent maintained as amended Status updated on 18.11.2016 Database last updated on 06.07.2024 | Most recent event Tooltip | 03.02.2017 | Change - lapse in a contracting state State(s) deleted from list of lapses: LV | published on 08.03.2017 [2017/10] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2016/51] |
Former [2013/16] | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District, Shenzhen Guangdong 518129 / CN | ||
Former [2009/29] | For all designated states Huawei Technologies Co., Ltd. B1-3A, Bantian Shenzhen, Longgang District Guangdong 518129 / CN | Inventor(s) | 01 /
ZHANG, Hongzhuo Huawei Technologies Co., Ltd. Intellectual Property Department B1-3A Bantian Longgang District, Shenzen 518129 / CN | 02 /
QIU, Yong Huawei Technologies Co., Ltd. Intellectual Property Department B1-3A Bantian Longgang District, Shenzen 518129 / CN | [2013/16] |
Former [2009/29] | 01 /
ZHANG, Hongzhuo Huawei Technologies Co., Ltd. Intellectual Property Department B1-3A Bantian Longgang District, Shenzen 518129 / CN | ||
02 /
QIU, Yong Huawei Technologies Co., Ltd. Intellectual Property Department B1-3A Bantian Longgang District, Shenzen 518129 / CN | Representative(s) | Körber, Martin Hans Mitscherlich PartmbB Patent- und Rechtsanwälte Sonnenstrasse 33 80331 München / DE | [2014/17] |
Former [2011/21] | Kreuz, Georg Maria, et al Huawei Technologies Duesseldorf GmbH Dessauerstrasse 3 80992 München / DE | ||
Former [2011/21] | Kreuz, Georg Maria Huawei Technologies Riesstrasse 25 80992 München / DE | ||
Former [2009/29] | Kreuz, Georg Maria Huawei Technologies Düsseldorf GmbH Riesstrasse 25 80992 München / DE | Application number, filing date | 08706587.6 | 29.01.2008 | [2009/29] | WO2008CN70210 | Priority number, date | CN20071002482 | 29.01.2007 Original published format: CN200710002482 | [2009/29] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2008092408 | Date: | 07.08.2008 | Language: | ZH | [2008/32] | Type: | A1 Application with search report | No.: | EP2079250 | Date: | 15.07.2009 | Language: | EN | [2009/29] | Type: | B1 Patent specification | No.: | EP2079250 | Date: | 17.04.2013 | Language: | EN | [2013/16] | Type: | B2 New European patent specification | No.: | EP2079250 | Date: | 21.12.2016 | Language: | EN | [2016/51] | Search report(s) | International search report - published on: | CN | 07.08.2008 | (Supplementary) European search report - dispatched on: | EP | 26.01.2012 | Classification | IPC: | H04W36/00, H04W36/08, H04W92/04, H04W92/20, H04W8/20 | [2016/23] | CPC: |
H04W36/0058 (EP,US);
H04W8/20 (EP,US);
H04W36/13 (EP,US);
H04W92/045 (EP,US);
H04W92/20 (EP,US)
|
Former IPC [2012/09] | H04W8/20 | ||
Former IPC [2009/30] | H04W4/00 | ||
Former IPC [2009/29] | H04Q7/38 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2016/51] |
Former [2009/29] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | EINRICHTEN EINER S1-SIGNALISIERUNGSVERBINDUNG IN ENTWICKELTEN NETZEN | [2012/44] | English: | ESTABLISHING S1 SIGNALING CONNECTION IN EVOLVED NETWORK | [2012/44] | French: | ÉTABLISSEMENT D' UNE CONNEXION DE SIGNALISATION S1 DANS UN RÉSEAU ÉLABORÉ | [2012/44] |
Former [2009/29] | VERFAHREN, GERÄT UND SYSTEM ZUM EINRICHTEN EINER S1-SIGNALISIERUNGSVERBINDUNG IN ENTWICKELTEN NETZEN | ||
Former [2009/29] | METHOD, DEVICE AND SYSTEM FOR ESTABLISHING S1 SIGNALING CONNECTION IN EVOLVED NETWORK | ||
Former [2009/29] | PROCÉDÉ, DISPOSITIF ET SYSTÈME DESTINÉS À ÉTABLIR UNE CONNEXION DE SIGNALISATION S1 DANS UN RÉSEAU ÉLABORÉ | Entry into regional phase | 15.05.2009 | Translation filed | 15.05.2009 | National basic fee paid | 15.05.2009 | Search fee paid | 15.05.2009 | Designation fee(s) paid | 15.05.2009 | Examination fee paid | Examination procedure | 15.05.2009 | Examination requested [2009/29] | 23.08.2012 | Amendment by applicant (claims and/or description) | 29.10.2012 | Communication of intention to grant the patent | 08.03.2013 | Fee for grant paid | 08.03.2013 | Fee for publishing/printing paid | Divisional application(s) | EP12198309.2 / EP2597898 | EP14176471.2 / EP2814272 | EP17156171.5 / EP3203777 | EP18195166.6 / EP3448074 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.10.2012 | Opposition(s) | Opponent(s) | 01
17.01.2014
07.07.2016
WITHDRAWN Telefonaktiebolaget L M Ericsson (publ) 164 83 Stockholm / SE Opponent's representative Kribber, Klaus-Dieter Ericsson GmbH Ericsson Allee 1 52134 Herzogenrath / DE | [2016/33] |
Former [2016/32] | |||
Opponent(s) | 01
17.01.2014
28.01.2014
ADMISSIBLE Telefonaktiebolaget L M Ericsson (publ) 164 83 Stockholm / SE Opponent's representative Kribber, Klaus-Dieter Ericsson GmbH Ericsson Allee 1 52134 Herzogenrath / DE | ||
Former [2014/09] | |||
Opponent(s) | 01
17.01.2014
Telefonaktiebolaget L M Ericsson (publ) 164 83 Stockholm / SE Opponent's representative HOFFMANN EITLE Patent- und Rechtsanwälte Arabellastrasse 4 81925 München / DE | 21.02.2014 | Invitation to proprietor to file observations on the notice of opposition | 03.09.2014 | Reply of patent proprietor to notice(s) of opposition | 30.07.2015 | Cancellation of oral proceeding that was planned for 17.02.2016 | 17.02.2016 | Date of oral proceedings | 11.04.2016 | Legal effect of interlocutory decision in opposition | 11.04.2016 | Date of oral proceedings | 24.05.2016 | Despatch of interlocutory decision in opposition | 24.05.2016 | Despatch of minutes of oral proceedings | 07.09.2016 | Despatch of communication that the patent will be maintained as amended | 08.11.2016 | Fee for printing new specification paid | Fees paid | Renewal fee | 08.01.2010 | Renewal fee patent year 03 | 31.01.2011 | Renewal fee patent year 04 | 31.01.2012 | Renewal fee patent year 05 | 31.01.2013 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.01.2008 | BE | 17.04.2013 | CY | 17.04.2013 | CZ | 17.04.2013 | DK | 17.04.2013 | EE | 17.04.2013 | FI | 17.04.2013 | HR | 17.04.2013 | LT | 17.04.2013 | MC | 17.04.2013 | MT | 17.04.2013 | PL | 17.04.2013 | RO | 17.04.2013 | SI | 17.04.2013 | SK | 17.04.2013 | TR | 17.04.2013 | BG | 17.07.2013 | NO | 17.07.2013 | GR | 18.07.2013 | IS | 17.08.2013 | PT | 19.08.2013 | IE | 29.01.2014 | LU | 29.01.2014 | CH | 31.01.2014 | LI | 31.01.2014 | [2017/10] |
Former [2016/33] | HU | 29.01.2008 | |
BE | 17.04.2013 | ||
CY | 17.04.2013 | ||
CZ | 17.04.2013 | ||
DK | 17.04.2013 | ||
EE | 17.04.2013 | ||
FI | 17.04.2013 | ||
HR | 17.04.2013 | ||
LT | 17.04.2013 | ||
LV | 17.04.2013 | ||
MC | 17.04.2013 | ||
MT | 17.04.2013 | ||
PL | 17.04.2013 | ||
RO | 17.04.2013 | ||
SI | 17.04.2013 | ||
SK | 17.04.2013 | ||
TR | 17.04.2013 | ||
BG | 17.07.2013 | ||
NO | 17.07.2013 | ||
GR | 18.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
IE | 29.01.2014 | ||
LU | 29.01.2014 | ||
CH | 31.01.2014 | ||
LI | 31.01.2014 | ||
Former [2016/32] | HU | 29.01.2008 | |
BE | 17.04.2013 | ||
CY | 17.04.2013 | ||
CZ | 17.04.2013 | ||
DK | 17.04.2013 | ||
EE | 17.04.2013 | ||
FI | 17.04.2013 | ||
HR | 17.04.2013 | ||
LT | 17.04.2013 | ||
LV | 17.04.2013 | ||
MC | 17.04.2013 | ||
MT | 17.04.2013 | ||
PL | 17.04.2013 | ||
RO | 17.04.2013 | ||
SI | 17.04.2013 | ||
SK | 17.04.2013 | ||
BG | 17.07.2013 | ||
NO | 17.07.2013 | ||
GR | 18.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
IE | 29.01.2014 | ||
LU | 29.01.2014 | ||
CH | 31.01.2014 | ||
LI | 31.01.2014 | ||
Former [2016/12] | BE | 17.04.2013 | |
CY | 17.04.2013 | ||
CZ | 17.04.2013 | ||
DK | 17.04.2013 | ||
EE | 17.04.2013 | ||
FI | 17.04.2013 | ||
HR | 17.04.2013 | ||
LT | 17.04.2013 | ||
LV | 17.04.2013 | ||
MC | 17.04.2013 | ||
MT | 17.04.2013 | ||
PL | 17.04.2013 | ||
RO | 17.04.2013 | ||
SI | 17.04.2013 | ||
SK | 17.04.2013 | ||
BG | 17.07.2013 | ||
NO | 17.07.2013 | ||
GR | 18.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
IE | 29.01.2014 | ||
LU | 29.01.2014 | ||
CH | 31.01.2014 | ||
LI | 31.01.2014 | ||
Former [2015/07] | BE | 17.04.2013 | |
CY | 17.04.2013 | ||
CZ | 17.04.2013 | ||
DK | 17.04.2013 | ||
EE | 17.04.2013 | ||
FI | 17.04.2013 | ||
HR | 17.04.2013 | ||
LT | 17.04.2013 | ||
LV | 17.04.2013 | ||
MC | 17.04.2013 | ||
PL | 17.04.2013 | ||
RO | 17.04.2013 | ||
SI | 17.04.2013 | ||
SK | 17.04.2013 | ||
BG | 17.07.2013 | ||
NO | 17.07.2013 | ||
GR | 18.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
IE | 29.01.2014 | ||
LU | 29.01.2014 | ||
CH | 31.01.2014 | ||
LI | 31.01.2014 | ||
Former [2014/46] | BE | 17.04.2013 | |
CY | 17.04.2013 | ||
CZ | 17.04.2013 | ||
DK | 17.04.2013 | ||
EE | 17.04.2013 | ||
FI | 17.04.2013 | ||
HR | 17.04.2013 | ||
LT | 17.04.2013 | ||
LV | 17.04.2013 | ||
MC | 17.04.2013 | ||
PL | 17.04.2013 | ||
RO | 17.04.2013 | ||
SI | 17.04.2013 | ||
SK | 17.04.2013 | ||
BG | 17.07.2013 | ||
NO | 17.07.2013 | ||
GR | 18.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
LU | 29.01.2014 | ||
CH | 31.01.2014 | ||
LI | 31.01.2014 | ||
Former [2014/41] | BE | 17.04.2013 | |
CY | 17.04.2013 | ||
CZ | 17.04.2013 | ||
DK | 17.04.2013 | ||
EE | 17.04.2013 | ||
FI | 17.04.2013 | ||
HR | 17.04.2013 | ||
LT | 17.04.2013 | ||
LV | 17.04.2013 | ||
MC | 17.04.2013 | ||
PL | 17.04.2013 | ||
RO | 17.04.2013 | ||
SI | 17.04.2013 | ||
SK | 17.04.2013 | ||
BG | 17.07.2013 | ||
NO | 17.07.2013 | ||
GR | 18.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
LU | 29.01.2014 | ||
Former [2014/38] | BE | 17.04.2013 | |
CY | 17.04.2013 | ||
CZ | 17.04.2013 | ||
DK | 17.04.2013 | ||
EE | 17.04.2013 | ||
FI | 17.04.2013 | ||
HR | 17.04.2013 | ||
LT | 17.04.2013 | ||
LV | 17.04.2013 | ||
MC | 17.04.2013 | ||
PL | 17.04.2013 | ||
RO | 17.04.2013 | ||
SI | 17.04.2013 | ||
SK | 17.04.2013 | ||
BG | 17.07.2013 | ||
NO | 17.07.2013 | ||
GR | 18.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
Former [2014/11] | BE | 17.04.2013 | |
CY | 17.04.2013 | ||
CZ | 17.04.2013 | ||
DK | 17.04.2013 | ||
EE | 17.04.2013 | ||
FI | 17.04.2013 | ||
HR | 17.04.2013 | ||
LT | 17.04.2013 | ||
LV | 17.04.2013 | ||
PL | 17.04.2013 | ||
RO | 17.04.2013 | ||
SI | 17.04.2013 | ||
SK | 17.04.2013 | ||
BG | 17.07.2013 | ||
NO | 17.07.2013 | ||
GR | 18.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
Former [2014/10] | BE | 17.04.2013 | |
CY | 17.04.2013 | ||
CZ | 17.04.2013 | ||
DK | 17.04.2013 | ||
EE | 17.04.2013 | ||
FI | 17.04.2013 | ||
HR | 17.04.2013 | ||
LT | 17.04.2013 | ||
LV | 17.04.2013 | ||
PL | 17.04.2013 | ||
SI | 17.04.2013 | ||
SK | 17.04.2013 | ||
BG | 17.07.2013 | ||
NO | 17.07.2013 | ||
GR | 18.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
Former [2014/09] | BE | 17.04.2013 | |
CY | 17.04.2013 | ||
DK | 17.04.2013 | ||
EE | 17.04.2013 | ||
FI | 17.04.2013 | ||
HR | 17.04.2013 | ||
LT | 17.04.2013 | ||
LV | 17.04.2013 | ||
PL | 17.04.2013 | ||
SI | 17.04.2013 | ||
BG | 17.07.2013 | ||
NO | 17.07.2013 | ||
GR | 18.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
Former [2013/52] | BE | 17.04.2013 | |
CY | 17.04.2013 | ||
FI | 17.04.2013 | ||
HR | 17.04.2013 | ||
LT | 17.04.2013 | ||
LV | 17.04.2013 | ||
PL | 17.04.2013 | ||
SI | 17.04.2013 | ||
BG | 17.07.2013 | ||
NO | 17.07.2013 | ||
GR | 18.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
Former [2013/51] | BE | 17.04.2013 | |
FI | 17.04.2013 | ||
HR | 17.04.2013 | ||
LT | 17.04.2013 | ||
LV | 17.04.2013 | ||
PL | 17.04.2013 | ||
SI | 17.04.2013 | ||
BG | 17.07.2013 | ||
NO | 17.07.2013 | ||
GR | 18.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
Former [2013/50] | BE | 17.04.2013 | |
FI | 17.04.2013 | ||
LT | 17.04.2013 | ||
LV | 17.04.2013 | ||
PL | 17.04.2013 | ||
SI | 17.04.2013 | ||
BG | 17.07.2013 | ||
NO | 17.07.2013 | ||
GR | 18.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
Former [2013/49] | BE | 17.04.2013 | |
FI | 17.04.2013 | ||
LT | 17.04.2013 | ||
SI | 17.04.2013 | ||
NO | 17.07.2013 | ||
GR | 18.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
Former [2013/48] | LT | 17.04.2013 | |
NO | 17.07.2013 | ||
IS | 17.08.2013 | ||
PT | 19.08.2013 | ||
Former [2013/47] | LT | 17.04.2013 | |
NO | 17.07.2013 | ||
PT | 19.08.2013 | Documents cited: | Search | [XA] - ERICSSON, "Updates to Intra-LTE handover in 36.300", 3GPP DRAFT; R3-061945, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20061113), vol. RAN WG3, no. Riga, Latvia; 20061113, XP050160823 [X] 1-4 * page 2 - page 5 * [A] 5-15 | [A] - LIU ET AL, "689. Therapeutic Angiogenesis for Prefabrication of Ischemic Flaps with Multiple Growth Factor Gene Transfers: A Study in a Rat Model", MOLECULAR THERAPY, ACADEMIC PRESS, SAN DIEGO, CA, US, (20050815), vol. 11, ISSN 1525-0016, page 267, XP005016028 [A] 1-15 * the whole document * | [A] - "3rd Generation Partnership Project;Technical Specification Group Radio Access Network; Evolved UTRA and UTRAN;Radio Access Architecture and Interfaces (Release 7)", 3GPP DRAFT; TR_R3018_V_070_FINAL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20061214), vol. RAN WG3, XP050423655 [A] 1-15 * page 18, paragraph 6.3 - page 26, paragraph 6.3.5 * | International search | [A]US1794682 (GREENWOOD TALMA T); | [A]CN1402949 (NOKIA INC [FI]); | [A]CN1852586 (HUAWEI TECH CO LTD [CN]); | [A]CN1859768 (HUAWEI TECH CO LTD [CN]) | by applicant | - ERICSSON, "Updates to Intra-LTE handover in 36.300", 3GPP DRAFT, (20061113), vol. RAN WG3 |