blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2079250

EP2079250 - ESTABLISHING S1 SIGNALING CONNECTION IN EVOLVED NETWORK [Right-click to bookmark this link]
Former [2009/29]METHOD, DEVICE AND SYSTEM FOR ESTABLISHING S1 SIGNALING CONNECTION IN EVOLVED NETWORK
[2012/44]
StatusPatent maintained as amended
Status updated on  18.11.2016
Database last updated on 06.07.2024
Most recent event   Tooltip03.02.2017Change - lapse in a contracting state
State(s) deleted from list of lapses: LV
published on 08.03.2017  [2017/10]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[2016/51]
Former [2013/16]For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building Bantian Longgang District, Shenzhen
Guangdong 518129 / CN
Former [2009/29]For all designated states
Huawei Technologies Co., Ltd.
B1-3A, Bantian Shenzhen, Longgang District
Guangdong 518129 / CN
Inventor(s)01 / ZHANG, Hongzhuo
Huawei Technologies Co., Ltd.
Intellectual Property Department
B1-3A
Bantian
Longgang District, Shenzen 518129 / CN
02 / QIU, Yong
Huawei Technologies Co., Ltd.
Intellectual Property Department
B1-3A
Bantian
Longgang District, Shenzen 518129 / CN
 [2013/16]
Former [2009/29]01 / ZHANG, Hongzhuo
Huawei Technologies Co., Ltd. Intellectual Property Department B1-3A Bantian
Longgang District, Shenzen 518129 / CN
02 / QIU, Yong
Huawei Technologies Co., Ltd. Intellectual Property Department B1-3A Bantian
Longgang District, Shenzen 518129 / CN
Representative(s)Körber, Martin Hans
Mitscherlich PartmbB
Patent- und Rechtsanwälte
Sonnenstrasse 33
80331 München / DE
[2014/17]
Former [2011/21]Kreuz, Georg Maria, et al
Huawei Technologies Duesseldorf GmbH Dessauerstrasse 3
80992 München / DE
Former [2011/21]Kreuz, Georg Maria
Huawei Technologies Riesstrasse 25
80992 München / DE
Former [2009/29]Kreuz, Georg Maria
Huawei Technologies Düsseldorf GmbH Riesstrasse 25
80992 München / DE
Application number, filing date08706587.629.01.2008
[2009/29]
WO2008CN70210
Priority number, dateCN2007100248229.01.2007         Original published format: CN200710002482
[2009/29]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2008092408
Date:07.08.2008
Language:ZH
[2008/32]
Type: A1 Application with search report 
No.:EP2079250
Date:15.07.2009
Language:EN
[2009/29]
Type: B1 Patent specification 
No.:EP2079250
Date:17.04.2013
Language:EN
[2013/16]
Type: B2 New European patent specification 
No.:EP2079250
Date:21.12.2016
Language:EN
[2016/51]
Search report(s)International search report - published on:CN07.08.2008
(Supplementary) European search report - dispatched on:EP26.01.2012
ClassificationIPC:H04W36/00, H04W36/08, H04W92/04, H04W92/20, H04W8/20
[2016/23]
CPC:
H04W36/0058 (EP,US); H04W8/20 (EP,US); H04W36/13 (EP,US);
H04W92/045 (EP,US); H04W92/20 (EP,US)
Former IPC [2012/09]H04W8/20
Former IPC [2009/30]H04W4/00
Former IPC [2009/29]H04Q7/38
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2016/51]
Former [2009/29]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:EINRICHTEN EINER S1-SIGNALISIERUNGSVERBINDUNG IN ENTWICKELTEN NETZEN[2012/44]
English:ESTABLISHING S1 SIGNALING CONNECTION IN EVOLVED NETWORK[2012/44]
French:ÉTABLISSEMENT D' UNE CONNEXION DE SIGNALISATION S1 DANS UN RÉSEAU ÉLABORÉ[2012/44]
Former [2009/29]VERFAHREN, GERÄT UND SYSTEM ZUM EINRICHTEN EINER S1-SIGNALISIERUNGSVERBINDUNG IN ENTWICKELTEN NETZEN
Former [2009/29]METHOD, DEVICE AND SYSTEM FOR ESTABLISHING S1 SIGNALING CONNECTION IN EVOLVED NETWORK
Former [2009/29]PROCÉDÉ, DISPOSITIF ET SYSTÈME DESTINÉS À ÉTABLIR UNE CONNEXION DE SIGNALISATION S1 DANS UN RÉSEAU ÉLABORÉ
Entry into regional phase15.05.2009Translation filed 
15.05.2009National basic fee paid 
15.05.2009Search fee paid 
15.05.2009Designation fee(s) paid 
15.05.2009Examination fee paid 
Examination procedure15.05.2009Examination requested  [2009/29]
23.08.2012Amendment by applicant (claims and/or description)
29.10.2012Communication of intention to grant the patent
08.03.2013Fee for grant paid
08.03.2013Fee for publishing/printing paid
Divisional application(s)EP12198309.2  / EP2597898
EP14176471.2  / EP2814272
EP17156171.5  / EP3203777
EP18195166.6  / EP3448074
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  29.10.2012
Opposition(s)Opponent(s)01  17.01.2014  07.07.2016  WITHDRAWN
Telefonaktiebolaget L M Ericsson (publ)
164 83 Stockholm / SE
Opponent's representative
Kribber, Klaus-Dieter
Ericsson GmbH
Ericsson Allee 1
52134 Herzogenrath / DE
 [2016/33]
Former [2016/32]
Opponent(s)01  17.01.2014  28.01.2014  ADMISSIBLE
Telefonaktiebolaget L M Ericsson (publ)
164 83 Stockholm / SE
Opponent's representative
Kribber, Klaus-Dieter
Ericsson GmbH
Ericsson Allee 1
52134 Herzogenrath / DE
Former [2014/09]
Opponent(s)01  17.01.2014   
Telefonaktiebolaget L M Ericsson (publ)
164 83 Stockholm / SE
Opponent's representative
HOFFMANN EITLE
Patent- und Rechtsanwälte
Arabellastrasse 4
81925 München / DE
21.02.2014Invitation to proprietor to file observations on the notice of opposition
03.09.2014Reply of patent proprietor to notice(s) of opposition
30.07.2015Cancellation of oral proceeding that was planned for 17.02.2016
17.02.2016Date of oral proceedings
11.04.2016Legal effect of interlocutory decision in opposition
11.04.2016Date of oral proceedings
24.05.2016Despatch of interlocutory decision in opposition
24.05.2016Despatch of minutes of oral proceedings
07.09.2016Despatch of communication that the patent will be maintained as amended
08.11.2016Fee for printing new specification paid
Fees paidRenewal fee
08.01.2010Renewal fee patent year 03
31.01.2011Renewal fee patent year 04
31.01.2012Renewal fee patent year 05
31.01.2013Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.01.2008
BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
HR17.04.2013
LT17.04.2013
MC17.04.2013
MT17.04.2013
PL17.04.2013
RO17.04.2013
SI17.04.2013
SK17.04.2013
TR17.04.2013
BG17.07.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
IE29.01.2014
LU29.01.2014
CH31.01.2014
LI31.01.2014
[2017/10]
Former [2016/33]HU29.01.2008
BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
HR17.04.2013
LT17.04.2013
LV17.04.2013
MC17.04.2013
MT17.04.2013
PL17.04.2013
RO17.04.2013
SI17.04.2013
SK17.04.2013
TR17.04.2013
BG17.07.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
IE29.01.2014
LU29.01.2014
CH31.01.2014
LI31.01.2014
Former [2016/32]HU29.01.2008
BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
HR17.04.2013
LT17.04.2013
LV17.04.2013
MC17.04.2013
MT17.04.2013
PL17.04.2013
RO17.04.2013
SI17.04.2013
SK17.04.2013
BG17.07.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
IE29.01.2014
LU29.01.2014
CH31.01.2014
LI31.01.2014
Former [2016/12]BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
HR17.04.2013
LT17.04.2013
LV17.04.2013
MC17.04.2013
MT17.04.2013
PL17.04.2013
RO17.04.2013
SI17.04.2013
SK17.04.2013
BG17.07.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
IE29.01.2014
LU29.01.2014
CH31.01.2014
LI31.01.2014
Former [2015/07]BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
HR17.04.2013
LT17.04.2013
LV17.04.2013
MC17.04.2013
PL17.04.2013
RO17.04.2013
SI17.04.2013
SK17.04.2013
BG17.07.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
IE29.01.2014
LU29.01.2014
CH31.01.2014
LI31.01.2014
Former [2014/46]BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
HR17.04.2013
LT17.04.2013
LV17.04.2013
MC17.04.2013
PL17.04.2013
RO17.04.2013
SI17.04.2013
SK17.04.2013
BG17.07.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
LU29.01.2014
CH31.01.2014
LI31.01.2014
Former [2014/41]BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
HR17.04.2013
LT17.04.2013
LV17.04.2013
MC17.04.2013
PL17.04.2013
RO17.04.2013
SI17.04.2013
SK17.04.2013
BG17.07.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
LU29.01.2014
Former [2014/38]BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
HR17.04.2013
LT17.04.2013
LV17.04.2013
MC17.04.2013
PL17.04.2013
RO17.04.2013
SI17.04.2013
SK17.04.2013
BG17.07.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
Former [2014/11]BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
HR17.04.2013
LT17.04.2013
LV17.04.2013
PL17.04.2013
RO17.04.2013
SI17.04.2013
SK17.04.2013
BG17.07.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
Former [2014/10]BE17.04.2013
CY17.04.2013
CZ17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
HR17.04.2013
LT17.04.2013
LV17.04.2013
PL17.04.2013
SI17.04.2013
SK17.04.2013
BG17.07.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
Former [2014/09]BE17.04.2013
CY17.04.2013
DK17.04.2013
EE17.04.2013
FI17.04.2013
HR17.04.2013
LT17.04.2013
LV17.04.2013
PL17.04.2013
SI17.04.2013
BG17.07.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
Former [2013/52]BE17.04.2013
CY17.04.2013
FI17.04.2013
HR17.04.2013
LT17.04.2013
LV17.04.2013
PL17.04.2013
SI17.04.2013
BG17.07.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
Former [2013/51]BE17.04.2013
FI17.04.2013
HR17.04.2013
LT17.04.2013
LV17.04.2013
PL17.04.2013
SI17.04.2013
BG17.07.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
Former [2013/50]BE17.04.2013
FI17.04.2013
LT17.04.2013
LV17.04.2013
PL17.04.2013
SI17.04.2013
BG17.07.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
Former [2013/49]BE17.04.2013
FI17.04.2013
LT17.04.2013
SI17.04.2013
NO17.07.2013
GR18.07.2013
IS17.08.2013
PT19.08.2013
Former [2013/48]LT17.04.2013
NO17.07.2013
IS17.08.2013
PT19.08.2013
Former [2013/47]LT17.04.2013
NO17.07.2013
PT19.08.2013
Documents cited:Search[XA]  - ERICSSON, "Updates to Intra-LTE handover in 36.300", 3GPP DRAFT; R3-061945, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20061113), vol. RAN WG3, no. Riga, Latvia; 20061113, XP050160823 [X] 1-4 * page 2 - page 5 * [A] 5-15
 [A]  - LIU ET AL, "689. Therapeutic Angiogenesis for Prefabrication of Ischemic Flaps with Multiple Growth Factor Gene Transfers: A Study in a Rat Model", MOLECULAR THERAPY, ACADEMIC PRESS, SAN DIEGO, CA, US, (20050815), vol. 11, ISSN 1525-0016, page 267, XP005016028 [A] 1-15 * the whole document *
 [A]  - "3rd Generation Partnership Project;Technical Specification Group Radio Access Network; Evolved UTRA and UTRAN;Radio Access Architecture and Interfaces (Release 7)", 3GPP DRAFT; TR_R3018_V_070_FINAL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20061214), vol. RAN WG3, XP050423655 [A] 1-15 * page 18, paragraph 6.3 - page 26, paragraph 6.3.5 *
International search[A]US1794682  (GREENWOOD TALMA T);
 [A]CN1402949  (NOKIA INC [FI]);
 [A]CN1852586  (HUAWEI TECH CO LTD [CN]);
 [A]CN1859768  (HUAWEI TECH CO LTD [CN])
by applicant   - ERICSSON, "Updates to Intra-LTE handover in 36.300", 3GPP DRAFT, (20061113), vol. RAN WG3
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.