| EP2132614 - CENTRALIZED SERVICE FOR AWAKENING A COMPUTING DEVICE [Right-click to bookmark this link] | |||
| Former [2009/51] | CENTRALIZED SERVICE FOR AWAKENING A COMPUTING DEVICE | ||
| [2015/27] | Status | No opposition filed within time limit Status updated on 14.10.2016 Database last updated on 26.03.2026 | Most recent event Tooltip | 17.08.2018 | Lapse of the patent in a contracting state New state(s): BG | published on 19.09.2018 [2018/38] | Applicant(s) | For all designated states Microsoft Technology Licensing, LLC One Microsoft Way Redmond, WA 98052 / US | [2015/12] |
| Former [2009/51] | For all designated states Microsoft Corporation One Microsoft Way Redmond, WA 98052-6399 / US | Inventor(s) | 01 /
MILLER, Gregory, S. c/o Microsoft Corporation One Microsoft Way Redmond, Washington 98052-6399 / US | 02 /
GLASS, Adam, B. c/o Microsoft Corporation One Microsoft Way Redmond, WA 98052-6399 / US | [2015/50] |
| Former [2009/51] | 01 /
MILLER, Gregory, S. c/o Microsoft Corporation One Microsoft Way Redmond, Washington 98052-6399 / US | ||
| 02 /
GLASS, Adam, B. c/o Microsoft Corporation One Microsoft Way Redmond, WA 98052-6399 / US | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2015/50] |
| Former [2009/51] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät Leopoldstrasse 4 80802 München / DE | Application number, filing date | 08714042.2 | 28.01.2008 | [2009/51] | WO2008US52155 | Priority number, date | US20070710708 | 26.02.2007 Original published format: US 710708 | [2009/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2008106258 | Date: | 04.09.2008 | Language: | EN | [2008/36] | Type: | A1 Application with search report | No.: | EP2132614 | Date: | 16.12.2009 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.09.2008 takes the place of the publication of the European patent application. | [2009/51] | Type: | B1 Patent specification | No.: | EP2132614 | Date: | 09.12.2015 | Language: | EN | [2015/50] | Search report(s) | International search report - published on: | KR | 04.09.2008 | (Supplementary) European search report - dispatched on: | EP | 18.03.2010 | Classification | IPC: | G06F1/32, H04L29/08, H04L12/12 | [2010/16] | CPC: |
G06F1/3209 (EP,US);
H04L12/66 (EP,US);
H04L67/54 (EP,US);
H04L67/56 (EP,US);
H04L67/59 (EP,US);
Y02D30/00 (EP,US)
|
| Former IPC [2009/51] | G06F1/32 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2015/50] |
| Former [2009/51] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | ZENTRALISIERTER DIENST ZUM AUFWECKEN EINER DATENVERARBEITUNGSEINRICHTUNG | [2015/30] | English: | CENTRALIZED SERVICE FOR AWAKENING A COMPUTING DEVICE | [2015/30] | French: | SERVICE CENTRALISÉ POUR RÉVEILLER UN PÉRIPHÉRIQUE INFORMATIQUE | [2015/30] |
| Former [2009/51] | ZENTRALISIERTER DIENST ZUM AUFWECKEN EINER DATENVERARBEITUNGSEINRICHTUNG | ||
| Former [2009/51] | CENTRALIZED SERVICE FOR AWAKENING A COMPUTING DEVICE | ||
| Former [2009/51] | SERVICE CENTRALISÉ POUR RÉVEILLER UN PÉRIPHÉRIQUE INFORMATIQUE | Entry into regional phase | 17.09.2009 | National basic fee paid | 17.09.2009 | Search fee paid | 17.09.2009 | Designation fee(s) paid | 17.09.2009 | Examination fee paid | Examination procedure | 17.09.2009 | Amendment by applicant (claims and/or description) | 17.09.2009 | Examination requested [2009/51] | 11.05.2010 | Despatch of a communication from the examining division (Time limit: M04) | 24.08.2010 | Reply to a communication from the examining division | 13.12.2011 | Despatch of a communication from the examining division (Time limit: M04) | 20.04.2012 | Reply to a communication from the examining division | 08.02.2013 | Despatch of a communication from the examining division (Time limit: M04) | 24.05.2013 | Reply to a communication from the examining division | 28.02.2014 | Despatch of a communication from the examining division (Time limit: M06) | 10.09.2014 | Reply to a communication from the examining division | 23.06.2015 | Communication of intention to grant the patent | 22.10.2015 | Fee for grant paid | 22.10.2015 | Fee for publishing/printing paid | 22.10.2015 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.05.2010 | Opposition(s) | 12.09.2016 | No opposition filed within time limit [2016/46] | Fees paid | Renewal fee | 13.01.2010 | Renewal fee patent year 03 | 14.01.2011 | Renewal fee patent year 04 | 11.01.2012 | Renewal fee patent year 05 | 08.01.2013 | Renewal fee patent year 06 | 08.01.2014 | Renewal fee patent year 07 | 08.01.2015 | Renewal fee patent year 08 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.01.2008 | AT | 09.12.2015 | BE | 09.12.2015 | BG | 09.12.2015 | CY | 09.12.2015 | CZ | 09.12.2015 | DK | 09.12.2015 | EE | 09.12.2015 | ES | 09.12.2015 | FI | 09.12.2015 | HR | 09.12.2015 | IT | 09.12.2015 | LT | 09.12.2015 | LV | 09.12.2015 | MC | 09.12.2015 | PL | 09.12.2015 | RO | 09.12.2015 | SE | 09.12.2015 | SI | 09.12.2015 | SK | 09.12.2015 | TR | 09.12.2015 | IE | 28.01.2016 | LU | 28.01.2016 | CH | 31.01.2016 | LI | 31.01.2016 | MT | 31.01.2016 | NO | 09.03.2016 | GR | 10.03.2016 | IS | 09.04.2016 | PT | 11.04.2016 | [2018/38] |
| Former [2018/31] | HU | 28.01.2008 | |
| AT | 09.12.2015 | ||
| BE | 09.12.2015 | ||
| CY | 09.12.2015 | ||
| CZ | 09.12.2015 | ||
| DK | 09.12.2015 | ||
| EE | 09.12.2015 | ||
| ES | 09.12.2015 | ||
| FI | 09.12.2015 | ||
| HR | 09.12.2015 | ||
| IT | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| LV | 09.12.2015 | ||
| MC | 09.12.2015 | ||
| PL | 09.12.2015 | ||
| RO | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| SI | 09.12.2015 | ||
| SK | 09.12.2015 | ||
| TR | 09.12.2015 | ||
| IE | 28.01.2016 | ||
| LU | 28.01.2016 | ||
| CH | 31.01.2016 | ||
| LI | 31.01.2016 | ||
| MT | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| IS | 09.04.2016 | ||
| PT | 11.04.2016 | ||
| Former [2018/28] | HU | 28.01.2008 | |
| AT | 09.12.2015 | ||
| BE | 09.12.2015 | ||
| CY | 09.12.2015 | ||
| CZ | 09.12.2015 | ||
| DK | 09.12.2015 | ||
| EE | 09.12.2015 | ||
| ES | 09.12.2015 | ||
| FI | 09.12.2015 | ||
| HR | 09.12.2015 | ||
| IT | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| LV | 09.12.2015 | ||
| MC | 09.12.2015 | ||
| MT | 09.12.2015 | ||
| PL | 09.12.2015 | ||
| RO | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| SI | 09.12.2015 | ||
| SK | 09.12.2015 | ||
| IE | 28.01.2016 | ||
| LU | 28.01.2016 | ||
| CH | 31.01.2016 | ||
| LI | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| IS | 09.04.2016 | ||
| PT | 11.04.2016 | ||
| Former [2017/47] | AT | 09.12.2015 | |
| BE | 09.12.2015 | ||
| CZ | 09.12.2015 | ||
| DK | 09.12.2015 | ||
| EE | 09.12.2015 | ||
| ES | 09.12.2015 | ||
| FI | 09.12.2015 | ||
| IT | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| LV | 09.12.2015 | ||
| MC | 09.12.2015 | ||
| MT | 09.12.2015 | ||
| PL | 09.12.2015 | ||
| RO | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| SI | 09.12.2015 | ||
| SK | 09.12.2015 | ||
| IE | 28.01.2016 | ||
| LU | 28.01.2016 | ||
| CH | 31.01.2016 | ||
| LI | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| IS | 09.04.2016 | ||
| PT | 11.04.2016 | ||
| Former [2017/07] | AT | 09.12.2015 | |
| BE | 09.12.2015 | ||
| CZ | 09.12.2015 | ||
| DK | 09.12.2015 | ||
| EE | 09.12.2015 | ||
| ES | 09.12.2015 | ||
| FI | 09.12.2015 | ||
| IT | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| LV | 09.12.2015 | ||
| MC | 09.12.2015 | ||
| PL | 09.12.2015 | ||
| RO | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| SI | 09.12.2015 | ||
| SK | 09.12.2015 | ||
| IE | 28.01.2016 | ||
| LU | 28.01.2016 | ||
| CH | 31.01.2016 | ||
| LI | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| IS | 09.04.2016 | ||
| PT | 11.04.2016 | ||
| Former [2017/03] | AT | 09.12.2015 | |
| BE | 09.12.2015 | ||
| CZ | 09.12.2015 | ||
| DK | 09.12.2015 | ||
| EE | 09.12.2015 | ||
| ES | 09.12.2015 | ||
| FI | 09.12.2015 | ||
| IT | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| LV | 09.12.2015 | ||
| MC | 09.12.2015 | ||
| PL | 09.12.2015 | ||
| RO | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| SI | 09.12.2015 | ||
| SK | 09.12.2015 | ||
| LU | 28.01.2016 | ||
| CH | 31.01.2016 | ||
| LI | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| IS | 09.04.2016 | ||
| PT | 11.04.2016 | ||
| Former [2016/49] | AT | 09.12.2015 | |
| CZ | 09.12.2015 | ||
| DK | 09.12.2015 | ||
| EE | 09.12.2015 | ||
| ES | 09.12.2015 | ||
| FI | 09.12.2015 | ||
| IT | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| LV | 09.12.2015 | ||
| MC | 09.12.2015 | ||
| PL | 09.12.2015 | ||
| RO | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| SI | 09.12.2015 | ||
| SK | 09.12.2015 | ||
| LU | 28.01.2016 | ||
| BE | 31.01.2016 | ||
| CH | 31.01.2016 | ||
| LI | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| IS | 09.04.2016 | ||
| PT | 11.04.2016 | ||
| Former [2016/46] | AT | 09.12.2015 | |
| CZ | 09.12.2015 | ||
| DK | 09.12.2015 | ||
| EE | 09.12.2015 | ||
| ES | 09.12.2015 | ||
| FI | 09.12.2015 | ||
| IT | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| LV | 09.12.2015 | ||
| MC | 09.12.2015 | ||
| RO | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| SK | 09.12.2015 | ||
| LU | 28.01.2016 | ||
| BE | 31.01.2016 | ||
| CH | 31.01.2016 | ||
| LI | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| IS | 09.04.2016 | ||
| PT | 11.04.2016 | ||
| Former [2016/42] | AT | 09.12.2015 | |
| CZ | 09.12.2015 | ||
| EE | 09.12.2015 | ||
| ES | 09.12.2015 | ||
| FI | 09.12.2015 | ||
| IT | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| LV | 09.12.2015 | ||
| MC | 09.12.2015 | ||
| RO | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| SK | 09.12.2015 | ||
| LU | 28.01.2016 | ||
| BE | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| IS | 09.04.2016 | ||
| PT | 11.04.2016 | ||
| Former [2016/39] | AT | 09.12.2015 | |
| CZ | 09.12.2015 | ||
| EE | 09.12.2015 | ||
| ES | 09.12.2015 | ||
| FI | 09.12.2015 | ||
| IT | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| LV | 09.12.2015 | ||
| RO | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| SK | 09.12.2015 | ||
| LU | 28.01.2016 | ||
| BE | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| IS | 09.04.2016 | ||
| PT | 11.04.2016 | ||
| Former [2016/38] | AT | 09.12.2015 | |
| CZ | 09.12.2015 | ||
| EE | 09.12.2015 | ||
| ES | 09.12.2015 | ||
| FI | 09.12.2015 | ||
| IT | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| LV | 09.12.2015 | ||
| RO | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| SK | 09.12.2015 | ||
| BE | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| IS | 09.04.2016 | ||
| PT | 11.04.2016 | ||
| Former [2016/36] | AT | 09.12.2015 | |
| CZ | 09.12.2015 | ||
| EE | 09.12.2015 | ||
| ES | 09.12.2015 | ||
| FI | 09.12.2015 | ||
| IS | 09.12.2015 | ||
| IT | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| LV | 09.12.2015 | ||
| RO | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| SK | 09.12.2015 | ||
| BE | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| Former [2016/34] | CZ | 09.12.2015 | |
| ES | 09.12.2015 | ||
| FI | 09.12.2015 | ||
| IS | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| LV | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| BE | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| Former [2016/31] | ES | 09.12.2015 | |
| FI | 09.12.2015 | ||
| IS | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| LV | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| BE | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| Former [2016/25] | ES | 09.12.2015 | |
| FI | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| LV | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| BE | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| Former [2016/24] | ES | 09.12.2015 | |
| FI | 09.12.2015 | ||
| LT | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| BE | 31.01.2016 | ||
| NO | 09.03.2016 | ||
| GR | 10.03.2016 | ||
| Former [2016/23] | ES | 09.12.2015 | |
| LT | 09.12.2015 | ||
| SE | 09.12.2015 | ||
| NO | 09.03.2016 | ||
| Former [2016/21] | ES | 09.12.2015 | |
| LT | 09.12.2015 | ||
| NO | 09.03.2016 | ||
| Former [2016/20] | ES | 09.12.2015 | |
| LT | 09.12.2015 | Documents cited: | Search | [X] US2004128310 (ZMUDZINSKI KRYSTOF C et al.) [X] 1-15 * paragraph [0015] * * paragraph [0019] - paragraph [0056] * * figures 2,3 * | [X] US2006087993 (SENGUPTA UTTAM K et al.) [X] 1-15 * paragraph [0015] - paragraph [0016] * * paragraph [0020] - paragraph [0035] * * figures 1-3 * | [A] US2005160162 (CROMER DARYL C et al.) [A] 1-15 * paragraph [0006] * * paragraph [0009] * * paragraph [0026] - paragraph [0027] * * paragraph [0044] - paragraph [0066] * |