EP2132594 - BI-DIRECTIONAL SIGNAL INTERFACE AND APPARATUS USING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.10.2017 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 04.11.2016 | ||
Former | Grant of patent is intended Status updated on 02.11.2016 | Most recent event Tooltip | 06.03.2020 | Lapse of the patent in a contracting state New state(s): TR | published on 08.04.2020 [2020/15] | Applicant(s) | For all designated states Photonic Systems, Inc. 900 Middlesex Turnpike Billerica, Massachusetts 01821 / US | [2009/51] | Inventor(s) | 01 /
COX, Charles, H. 100 Wildwood Drive Carlisle, Massachusetts 01741 / US | [2009/51] | Representative(s) | Jackson, Robert Patrick Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | [2016/49] |
Former [2009/51] | Jackson, Robert Patrick Frank B. Dehn & Co. St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 08726768.8 | 13.03.2008 | [2009/51] | WO2008US03297 | Priority number, date | US20070687046 | 16.03.2007 Original published format: US 687046 | [2009/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2008115386 | Date: | 25.09.2008 | Language: | EN | [2008/39] | Type: | A1 Application with search report | No.: | EP2132594 | Date: | 16.12.2009 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.09.2008 takes the place of the publication of the European patent application. | [2009/51] | Type: | B1 Patent specification | No.: | EP2132594 | Date: | 07.12.2016 | Language: | EN | [2016/49] | Search report(s) | International search report - published on: | EP | 25.09.2008 | Classification | IPC: | G02F1/00, H01Q3/26, H04B10/50 | [2016/24] | CPC: |
H04B10/505 (EP,US);
H01Q3/2676 (EP,US)
|
Former IPC [2009/51] | G02F1/00, H01Q3/26 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2016/49] |
Former [2009/51] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | BIDIREKTIONALE SIGNALSCHNITTSTELLE UND VORRICHTUNG DAMIT | [2009/51] | English: | BI-DIRECTIONAL SIGNAL INTERFACE AND APPARATUS USING SAME | [2009/51] | French: | INTERFACE DE SIGNAL BIDIRECTIONNEL ET DISPOSITIF L'UTILISANT | [2009/51] | Entry into regional phase | 29.09.2009 | National basic fee paid | 29.09.2009 | Designation fee(s) paid | 29.09.2009 | Examination fee paid | Examination procedure | 29.09.2009 | Examination requested [2009/51] | 21.12.2009 | Amendment by applicant (claims and/or description) | 02.12.2010 | Despatch of a communication from the examining division (Time limit: M06) | 13.06.2011 | Reply to a communication from the examining division | 08.02.2013 | Despatch of a communication from the examining division (Time limit: M06) | 19.08.2013 | Reply to a communication from the examining division | 11.05.2016 | Cancellation of oral proceeding that was planned for 12.05.2016 | 12.05.2016 | Date of oral proceedings (cancelled) | 17.06.2016 | Communication of intention to grant the patent | 24.10.2016 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 24.10.2016 | Fee for grant paid | 24.10.2016 | Fee for publishing/printing paid | 02.11.2016 | Information about intention to grant a patent | 02.11.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 02.12.2010 | Opposition(s) | 08.09.2017 | No opposition filed within time limit [2017/46] | Fees paid | Renewal fee | 24.03.2010 | Renewal fee patent year 03 | 28.03.2011 | Renewal fee patent year 04 | 26.03.2012 | Renewal fee patent year 05 | 26.03.2013 | Renewal fee patent year 06 | 10.03.2014 | Renewal fee patent year 07 | 27.03.2015 | Renewal fee patent year 08 | 31.03.2016 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.03.2008 | AT | 07.12.2016 | BE | 07.12.2016 | CY | 07.12.2016 | CZ | 07.12.2016 | DK | 07.12.2016 | EE | 07.12.2016 | ES | 07.12.2016 | FI | 07.12.2016 | HR | 07.12.2016 | IT | 07.12.2016 | LT | 07.12.2016 | LV | 07.12.2016 | MC | 07.12.2016 | NL | 07.12.2016 | PL | 07.12.2016 | RO | 07.12.2016 | SE | 07.12.2016 | SI | 07.12.2016 | SK | 07.12.2016 | TR | 07.12.2016 | BG | 07.03.2017 | NO | 07.03.2017 | GR | 08.03.2017 | IE | 13.03.2017 | LU | 13.03.2017 | MT | 13.03.2017 | CH | 31.03.2017 | LI | 31.03.2017 | IS | 07.04.2017 | PT | 07.04.2017 | [2020/15] |
Former [2019/46] | HU | 13.03.2008 | |
AT | 07.12.2016 | ||
BE | 07.12.2016 | ||
CY | 07.12.2016 | ||
CZ | 07.12.2016 | ||
DK | 07.12.2016 | ||
EE | 07.12.2016 | ||
ES | 07.12.2016 | ||
FI | 07.12.2016 | ||
HR | 07.12.2016 | ||
IT | 07.12.2016 | ||
LT | 07.12.2016 | ||
LV | 07.12.2016 | ||
MC | 07.12.2016 | ||
NL | 07.12.2016 | ||
PL | 07.12.2016 | ||
RO | 07.12.2016 | ||
SE | 07.12.2016 | ||
SI | 07.12.2016 | ||
SK | 07.12.2016 | ||
BG | 07.03.2017 | ||
NO | 07.03.2017 | ||
GR | 08.03.2017 | ||
IE | 13.03.2017 | ||
LU | 13.03.2017 | ||
MT | 13.03.2017 | ||
CH | 31.03.2017 | ||
LI | 31.03.2017 | ||
IS | 07.04.2017 | ||
PT | 07.04.2017 | ||
Former [2019/31] | HU | 13.03.2008 | |
AT | 07.12.2016 | ||
BE | 07.12.2016 | ||
CZ | 07.12.2016 | ||
DK | 07.12.2016 | ||
EE | 07.12.2016 | ||
ES | 07.12.2016 | ||
FI | 07.12.2016 | ||
HR | 07.12.2016 | ||
IT | 07.12.2016 | ||
LT | 07.12.2016 | ||
LV | 07.12.2016 | ||
MC | 07.12.2016 | ||
NL | 07.12.2016 | ||
PL | 07.12.2016 | ||
RO | 07.12.2016 | ||
SE | 07.12.2016 | ||
SI | 07.12.2016 | ||
SK | 07.12.2016 | ||
BG | 07.03.2017 | ||
NO | 07.03.2017 | ||
GR | 08.03.2017 | ||
IE | 13.03.2017 | ||
LU | 13.03.2017 | ||
MT | 13.03.2017 | ||
CH | 31.03.2017 | ||
LI | 31.03.2017 | ||
IS | 07.04.2017 | ||
PT | 07.04.2017 | ||
Former [2018/43] | AT | 07.12.2016 | |
BE | 07.12.2016 | ||
CZ | 07.12.2016 | ||
DK | 07.12.2016 | ||
EE | 07.12.2016 | ||
ES | 07.12.2016 | ||
FI | 07.12.2016 | ||
HR | 07.12.2016 | ||
IT | 07.12.2016 | ||
LT | 07.12.2016 | ||
LV | 07.12.2016 | ||
MC | 07.12.2016 | ||
NL | 07.12.2016 | ||
PL | 07.12.2016 | ||
RO | 07.12.2016 | ||
SE | 07.12.2016 | ||
SI | 07.12.2016 | ||
SK | 07.12.2016 | ||
BG | 07.03.2017 | ||
NO | 07.03.2017 | ||
GR | 08.03.2017 | ||
IE | 13.03.2017 | ||
LU | 13.03.2017 | ||
MT | 13.03.2017 | ||
CH | 31.03.2017 | ||
LI | 31.03.2017 | ||
IS | 07.04.2017 | ||
PT | 07.04.2017 | ||
Former [2018/13] | AT | 07.12.2016 | |
BE | 07.12.2016 | ||
CZ | 07.12.2016 | ||
DK | 07.12.2016 | ||
EE | 07.12.2016 | ||
ES | 07.12.2016 | ||
FI | 07.12.2016 | ||
HR | 07.12.2016 | ||
IT | 07.12.2016 | ||
LT | 07.12.2016 | ||
LV | 07.12.2016 | ||
MC | 07.12.2016 | ||
NL | 07.12.2016 | ||
PL | 07.12.2016 | ||
RO | 07.12.2016 | ||
SE | 07.12.2016 | ||
SI | 07.12.2016 | ||
SK | 07.12.2016 | ||
BG | 07.03.2017 | ||
NO | 07.03.2017 | ||
GR | 08.03.2017 | ||
IE | 13.03.2017 | ||
LU | 13.03.2017 | ||
CH | 31.03.2017 | ||
LI | 31.03.2017 | ||
IS | 07.04.2017 | ||
PT | 07.04.2017 | ||
Former [2018/10] | AT | 07.12.2016 | |
BE | 07.12.2016 | ||
CZ | 07.12.2016 | ||
DK | 07.12.2016 | ||
EE | 07.12.2016 | ||
ES | 07.12.2016 | ||
FI | 07.12.2016 | ||
HR | 07.12.2016 | ||
IT | 07.12.2016 | ||
LT | 07.12.2016 | ||
LV | 07.12.2016 | ||
MC | 07.12.2016 | ||
NL | 07.12.2016 | ||
PL | 07.12.2016 | ||
RO | 07.12.2016 | ||
SE | 07.12.2016 | ||
SI | 07.12.2016 | ||
SK | 07.12.2016 | ||
BG | 07.03.2017 | ||
NO | 07.03.2017 | ||
GR | 08.03.2017 | ||
LU | 13.03.2017 | ||
IS | 07.04.2017 | ||
PT | 07.04.2017 | ||
Former [2017/52] | AT | 07.12.2016 | |
BE | 07.12.2016 | ||
CZ | 07.12.2016 | ||
DK | 07.12.2016 | ||
EE | 07.12.2016 | ||
ES | 07.12.2016 | ||
FI | 07.12.2016 | ||
HR | 07.12.2016 | ||
IT | 07.12.2016 | ||
LT | 07.12.2016 | ||
LV | 07.12.2016 | ||
MC | 07.12.2016 | ||
NL | 07.12.2016 | ||
PL | 07.12.2016 | ||
RO | 07.12.2016 | ||
SE | 07.12.2016 | ||
SI | 07.12.2016 | ||
SK | 07.12.2016 | ||
BG | 07.03.2017 | ||
NO | 07.03.2017 | ||
GR | 08.03.2017 | ||
IS | 07.04.2017 | ||
PT | 07.04.2017 | ||
Former [2017/38] | AT | 07.12.2016 | |
BE | 07.12.2016 | ||
CZ | 07.12.2016 | ||
EE | 07.12.2016 | ||
ES | 07.12.2016 | ||
FI | 07.12.2016 | ||
HR | 07.12.2016 | ||
IT | 07.12.2016 | ||
LT | 07.12.2016 | ||
LV | 07.12.2016 | ||
NL | 07.12.2016 | ||
PL | 07.12.2016 | ||
RO | 07.12.2016 | ||
SE | 07.12.2016 | ||
SK | 07.12.2016 | ||
BG | 07.03.2017 | ||
NO | 07.03.2017 | ||
GR | 08.03.2017 | ||
IS | 07.04.2017 | ||
PT | 07.04.2017 | ||
Former [2017/35] | CZ | 07.12.2016 | |
EE | 07.12.2016 | ||
ES | 07.12.2016 | ||
FI | 07.12.2016 | ||
HR | 07.12.2016 | ||
LT | 07.12.2016 | ||
LV | 07.12.2016 | ||
NL | 07.12.2016 | ||
RO | 07.12.2016 | ||
SE | 07.12.2016 | ||
NO | 07.03.2017 | ||
GR | 08.03.2017 | ||
Former [2017/31] | ES | 07.12.2016 | |
FI | 07.12.2016 | ||
HR | 07.12.2016 | ||
LT | 07.12.2016 | ||
LV | 07.12.2016 | ||
NL | 07.12.2016 | ||
SE | 07.12.2016 | ||
NO | 07.03.2017 | ||
GR | 08.03.2017 | ||
Former [2017/28] | ES | 07.12.2016 | |
FI | 07.12.2016 | ||
HR | 07.12.2016 | ||
LT | 07.12.2016 | ||
LV | 07.12.2016 | ||
SE | 07.12.2016 | ||
NO | 07.03.2017 | ||
GR | 08.03.2017 | ||
Former [2017/12] | LV | 07.12.2016 | Cited in | International search | [DXY]WO2005008832 (PHOTONICSYSTEMS INC [US], et al) [DX] 1-5,7-10,22-31 * paragraph [0037] - paragraph [0044]; figures 3A,3B * * paragraph [0063] - paragraph [0069]; figure 5 * [Y] 6; | [X]US5389782 (HILLIARD DONALD P [US]) [X] 11-21 * column 3, line 19 - column 4, line 22; figure 2 *; | [Y]FR2796766 (FURUKAWA ELECTRIC CO LTD [JP]) [Y] 6 * page 9, line 24 - page 10, line 13; figure 9A *; | [DA]US5287212 (COX III CHARLES H [US], et al) [DA] 1,2,11,22 * column 4, line 49 - column 6, line 50; figures 1-3 *; | [A]US4719412 (D HUMIERES ETIENNE [FR], et al) [A] 1 * column 2, line 45 - column 3, line 25; figures 2,3 * | Examination | US2007189778 | by applicant | US5287212 | - HELKEY, R., TWITCHELL, J., COX, C. H. III, "A down-converting optical link with RF gain", J. LIGHTWAVE TECHNOL., (1997), vol. 15, pages 956 - 61 | US20040710463 | US20060353701 |