EP2156633 - METHOD AND APPARATUS FOR CORRECTING IQ IMBALANCE IN AN OFDM RECEIVER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.04.2016 Database last updated on 26.07.2024 | Most recent event Tooltip | 13.07.2018 | Lapse of the patent in a contracting state | published on 15.08.2018 [2018/33] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [N/P] |
Former [2010/08] | For all designated states Telefonaktiebolaget L M Ericsson (publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
JONSSON, Elias Södra Promenaden 3 S-211 29 Malmö / SE | [2010/08] | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [N/P] |
Former [2015/23] | Åkerman, Mårten Lennart, et al Ericsson AB Patent Unit Mobile Platforms Nya Vattentornet 221 83 Lund / SE | ||
Former [2010/40] | Akerman, Marten Lennart, et al Ericsson AB Patent Unit Mobile Platforms Nya Vattentornet 221 83 Lund / SE | ||
Former [2010/08] | Bratt, Hanna Catharina, et al Ericsson AB Patent Unit Mobile Platforms Nya Vattentornet 221 83 Lund / SE | Application number, filing date | 08736515.1 | 23.04.2008 | [2010/08] | WO2008EP54947 | Priority number, date | US20070743298 | 02.05.2007 Original published format: US 743298 | [2010/08] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2008135393 | Date: | 13.11.2008 | Language: | EN | [2008/46] | Type: | A1 Application with search report | No.: | EP2156633 | Date: | 24.02.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 13.11.2008 takes the place of the publication of the European patent application. | [2010/08] | Type: | B1 Patent specification | No.: | EP2156633 | Date: | 03.06.2015 | Language: | EN | [2015/23] | Search report(s) | International search report - published on: | EP | 13.11.2008 | Classification | IPC: | H04L27/38, H04L27/26 | [2010/08] | CPC: |
H04L27/2647 (EP,US);
H04L27/3863 (EP,US);
H04L1/06 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2015/23] |
Former [2010/08] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | VERFAHREN UND VORRICHTUNG ZUM KORRIGIEREN EINES IQ-UNGLEICHGEWICHTS IN EINEM OFDM-EMPFÄNGER | [2010/08] | English: | METHOD AND APPARATUS FOR CORRECTING IQ IMBALANCE IN AN OFDM RECEIVER | [2010/08] | French: | PROCÉDÉ ET APPAREIL POUR CORRIGER DES DÉSÉQUILIBRES IQ DANS UN RÉCEPTEUR OFDM | [2010/08] | Entry into regional phase | 05.11.2009 | National basic fee paid | 05.11.2009 | Designation fee(s) paid | 05.11.2009 | Examination fee paid | Examination procedure | 23.02.2009 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 05.11.2009 | Amendment by applicant (claims and/or description) | 05.11.2009 | Examination requested [2010/08] | 16.03.2011 | Despatch of a communication from the examining division (Time limit: M04) | 07.07.2011 | Reply to a communication from the examining division | 19.08.2014 | Communication of intention to grant the patent | 16.12.2014 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 07.01.2015 | Communication of intention to grant the patent | 24.04.2015 | Fee for grant paid | 24.04.2015 | Fee for publishing/printing paid | 24.04.2015 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 16.03.2011 | Opposition(s) | 04.03.2016 | No opposition filed within time limit [2016/19] | Fees paid | Renewal fee | 26.04.2010 | Renewal fee patent year 03 | 25.04.2011 | Renewal fee patent year 04 | 28.03.2012 | Renewal fee patent year 05 | 29.04.2013 | Renewal fee patent year 06 | 28.04.2014 | Renewal fee patent year 07 | 27.04.2015 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.04.2008 | AT | 03.06.2015 | BE | 03.06.2015 | CY | 03.06.2015 | CZ | 03.06.2015 | DK | 03.06.2015 | EE | 03.06.2015 | ES | 03.06.2015 | FI | 03.06.2015 | HR | 03.06.2015 | IT | 03.06.2015 | LT | 03.06.2015 | LV | 03.06.2015 | MC | 03.06.2015 | NL | 03.06.2015 | PL | 03.06.2015 | RO | 03.06.2015 | SE | 03.06.2015 | SI | 03.06.2015 | SK | 03.06.2015 | TR | 03.06.2015 | BG | 03.09.2015 | NO | 03.09.2015 | GR | 04.09.2015 | IS | 03.10.2015 | PT | 06.10.2015 | [2018/32] |
Former [2018/29] | HU | 23.04.2008 | |
AT | 03.06.2015 | ||
BE | 03.06.2015 | ||
CY | 03.06.2015 | ||
CZ | 03.06.2015 | ||
DK | 03.06.2015 | ||
EE | 03.06.2015 | ||
ES | 03.06.2015 | ||
FI | 03.06.2015 | ||
HR | 03.06.2015 | ||
IT | 03.06.2015 | ||
LT | 03.06.2015 | ||
LV | 03.06.2015 | ||
MC | 03.06.2015 | ||
NL | 03.06.2015 | ||
PL | 03.06.2015 | ||
RO | 03.06.2015 | ||
SE | 03.06.2015 | ||
SI | 03.06.2015 | ||
SK | 03.06.2015 | ||
TR | 03.06.2015 | ||
BG | 03.09.2015 | ||
NO | 03.09.2015 | ||
GR | 04.09.2015 | ||
IS | 03.10.2015 | ||
PT | 06.10.2015 | ||
Former [2018/28] | HU | 23.04.2008 | |
AT | 03.06.2015 | ||
BE | 03.06.2015 | ||
CY | 03.06.2015 | ||
CZ | 03.06.2015 | ||
DK | 03.06.2015 | ||
EE | 03.06.2015 | ||
ES | 03.06.2015 | ||
FI | 03.06.2015 | ||
HR | 03.06.2015 | ||
IT | 03.06.2015 | ||
LT | 03.06.2015 | ||
LV | 03.06.2015 | ||
MC | 03.06.2015 | ||
NL | 03.06.2015 | ||
PL | 03.06.2015 | ||
RO | 03.06.2015 | ||
SE | 03.06.2015 | ||
SI | 03.06.2015 | ||
SK | 03.06.2015 | ||
BG | 03.09.2015 | ||
NO | 03.09.2015 | ||
GR | 04.09.2015 | ||
IS | 03.10.2015 | ||
PT | 06.10.2015 | ||
Former [2017/40] | AT | 03.06.2015 | |
BE | 03.06.2015 | ||
CZ | 03.06.2015 | ||
DK | 03.06.2015 | ||
EE | 03.06.2015 | ||
ES | 03.06.2015 | ||
FI | 03.06.2015 | ||
HR | 03.06.2015 | ||
IT | 03.06.2015 | ||
LT | 03.06.2015 | ||
LV | 03.06.2015 | ||
NL | 03.06.2015 | ||
PL | 03.06.2015 | ||
RO | 03.06.2015 | ||
SE | 03.06.2015 | ||
SI | 03.06.2015 | ||
SK | 03.06.2015 | ||
BG | 03.09.2015 | ||
NO | 03.09.2015 | ||
GR | 04.09.2015 | ||
IS | 03.10.2015 | ||
PT | 06.10.2015 | ||
Former [2017/03] | AT | 03.06.2015 | |
BE | 03.06.2015 | ||
CZ | 03.06.2015 | ||
DK | 03.06.2015 | ||
EE | 03.06.2015 | ||
ES | 03.06.2015 | ||
FI | 03.06.2015 | ||
HR | 03.06.2015 | ||
IT | 03.06.2015 | ||
LT | 03.06.2015 | ||
LV | 03.06.2015 | ||
PL | 03.06.2015 | ||
RO | 03.06.2015 | ||
SI | 03.06.2015 | ||
SK | 03.06.2015 | ||
BG | 03.09.2015 | ||
NO | 03.09.2015 | ||
GR | 04.09.2015 | ||
IS | 03.10.2015 | ||
PT | 06.10.2015 | ||
Former [2016/24] | AT | 03.06.2015 | |
CZ | 03.06.2015 | ||
DK | 03.06.2015 | ||
EE | 03.06.2015 | ||
ES | 03.06.2015 | ||
FI | 03.06.2015 | ||
HR | 03.06.2015 | ||
IT | 03.06.2015 | ||
LT | 03.06.2015 | ||
LV | 03.06.2015 | ||
PL | 03.06.2015 | ||
RO | 03.06.2015 | ||
SI | 03.06.2015 | ||
SK | 03.06.2015 | ||
BG | 03.09.2015 | ||
NO | 03.09.2015 | ||
GR | 04.09.2015 | ||
IS | 03.10.2015 | ||
PT | 06.10.2015 | ||
Former [2016/21] | AT | 03.06.2015 | |
CZ | 03.06.2015 | ||
DK | 03.06.2015 | ||
EE | 03.06.2015 | ||
ES | 03.06.2015 | ||
FI | 03.06.2015 | ||
HR | 03.06.2015 | ||
IT | 03.06.2015 | ||
LT | 03.06.2015 | ||
LV | 03.06.2015 | ||
PL | 03.06.2015 | ||
RO | 03.06.2015 | ||
SK | 03.06.2015 | ||
BG | 03.09.2015 | ||
NO | 03.09.2015 | ||
GR | 04.09.2015 | ||
IS | 03.10.2015 | ||
PT | 06.10.2015 | ||
Former [2016/20] | AT | 03.06.2015 | |
CZ | 03.06.2015 | ||
DK | 03.06.2015 | ||
EE | 03.06.2015 | ||
ES | 03.06.2015 | ||
FI | 03.06.2015 | ||
HR | 03.06.2015 | ||
LT | 03.06.2015 | ||
LV | 03.06.2015 | ||
PL | 03.06.2015 | ||
RO | 03.06.2015 | ||
SK | 03.06.2015 | ||
BG | 03.09.2015 | ||
NO | 03.09.2015 | ||
GR | 04.09.2015 | ||
IS | 03.10.2015 | ||
PT | 06.10.2015 | ||
Former [2016/10] | AT | 03.06.2015 | |
CZ | 03.06.2015 | ||
EE | 03.06.2015 | ||
ES | 03.06.2015 | ||
FI | 03.06.2015 | ||
HR | 03.06.2015 | ||
LT | 03.06.2015 | ||
LV | 03.06.2015 | ||
PL | 03.06.2015 | ||
RO | 03.06.2015 | ||
SK | 03.06.2015 | ||
BG | 03.09.2015 | ||
NO | 03.09.2015 | ||
GR | 04.09.2015 | ||
IS | 03.10.2015 | ||
PT | 06.10.2015 | ||
Former [2016/09] | AT | 03.06.2015 | |
EE | 03.06.2015 | ||
ES | 03.06.2015 | ||
FI | 03.06.2015 | ||
HR | 03.06.2015 | ||
LT | 03.06.2015 | ||
LV | 03.06.2015 | ||
BG | 03.09.2015 | ||
NO | 03.09.2015 | ||
GR | 04.09.2015 | ||
Former [2015/51] | AT | 03.06.2015 | |
ES | 03.06.2015 | ||
FI | 03.06.2015 | ||
HR | 03.06.2015 | ||
LT | 03.06.2015 | ||
LV | 03.06.2015 | ||
BG | 03.09.2015 | ||
NO | 03.09.2015 | ||
GR | 04.09.2015 | ||
Former [2015/50] | ES | 03.06.2015 | |
FI | 03.06.2015 | ||
HR | 03.06.2015 | ||
LT | 03.06.2015 | ||
LV | 03.06.2015 | ||
BG | 03.09.2015 | ||
NO | 03.09.2015 | ||
GR | 04.09.2015 | ||
Former [2015/49] | ES | 03.06.2015 | |
FI | 03.06.2015 | ||
HR | 03.06.2015 | ||
LT | 03.06.2015 | ||
LV | 03.06.2015 | ||
NO | 03.09.2015 | ||
GR | 04.09.2015 | Cited in | International search | [A]US2003231726 (SCHUCHERT ANDREAS [DE], et al) [A] 1-27 * abstract * * page 2, paragraph 28 - paragraph 29 *; | [X] - BAGHERI R ET AL, "Compensation Schemes and Performance Analysis of IQ Imbalances in OFDM Receivers", IEEE TRANSACTIONS ON SIGNAL PROCESSING, IEEE SERVICE CENTER, NEW YORK, NY, US, (20050801), vol. 53, no. 8, ISSN 1053-587X, pages 3257 - 3268, XP011136506 [X] 1-4,10-14,16-18,20-23,26 * the whole document * DOI: http://dx.doi.org/10.1109/TSP.2005.851156 | [A] - SAYED A H ET AL, "MIMO OFDM Receivers for Systems With IQ Imbalances", IEEE TRANSACTIONS ON SIGNAL PROCESSING, IEEE SERVICE CENTER, NEW YORK, NY, US, (20050901), vol. 53, no. 9, ISSN 1053-587X, pages 3583 - 3596, XP011137865 [A] 1-27 * the whole document * DOI: http://dx.doi.org/10.1109/TSP.2005.853148 |