EP2099175 - METHOD FOR ADVERTISING ROUTE MESSAGE, METHOD, SYSTEM AND DEVICE FOR ROUTING PACKETS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.12.2012 Database last updated on 12.11.2024 | Most recent event Tooltip | 18.07.2014 | Lapse of the patent in a contracting state New state(s): HU | published on 20.08.2014 [2014/34] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [N/P] |
Former [2009/37] | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District, Shenzhen Guangdong 518129 / CN | Inventor(s) | 01 /
XU, Xiaohu@c/o Huawei Technologies Co.Ltd. Int.Prop.Dept. B1-3A, Bantian Longgang District 518129, Shenzhen / CN | [2012/06] |
Former [2009/37] | 01 /
XU, Xiaohu c/o Huawei Technologies Co.Ltd. Int.Prop.Dept. B1-3A, Bantian Longgang District 518129, Shenzhen / CN | Representative(s) | Kreuz, Georg Maria, et al Huawei Technologies Duesseldorf GmbH Riesstraße 25 80992 München / DE | [N/P] |
Former [2011/21] | Kreuz, Georg Maria, et al Huawei Technologies Duesseldorf GmbH Dessauerstrasse 3 80992 München / DE | ||
Former [2011/21] | Kreuz, Georg Maria, et al Huawei Technologies Riesstrasse 25 80992 München / DE | ||
Former [2009/37] | Kreuz, Georg Maria, et al c/o Huawei Technologies European Research Center Riesstraße 25 D-80992 München / DE | Application number, filing date | 08757825.8 | 24.06.2008 | [2009/37] | WO2008CN71416 | Priority number, date | CN20071123476 | 25.06.2007 Original published format: CN200710123476 | [2009/37] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009000200 | Date: | 31.12.2008 | Language: | ZH | [2009/01] | Type: | A1 Application with search report | No.: | EP2099175 | Date: | 09.09.2009 | Language: | EN | [2009/37] | Type: | B1 Patent specification | No.: | EP2099175 | Date: | 08.02.2012 | Language: | EN | [2012/06] | Search report(s) | International search report - published on: | CN | 31.12.2008 | (Supplementary) European search report - dispatched on: | EP | 26.11.2009 | Classification | IPC: | H04L12/56 | [2009/37] | CPC: |
H04L45/42 (EP,US);
H04L45/02 (US);
H04L45/028 (EP,US);
H04L45/033 (EP);
H04L45/04 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2009/37] | Title | German: | VERFAHREN FÜR WERBEROUTENMITTEILUNGEN SOWIE VERFAHREN, SYSTEM UND VORRICHTUNG FÜR PAKETROUTING | [2009/37] | English: | METHOD FOR ADVERTISING ROUTE MESSAGE, METHOD, SYSTEM AND DEVICE FOR ROUTING PACKETS | [2009/37] | French: | PROCÉDÉ POUR ANNONCER UN MESSAGE DE PARCOURS, PROCÉDÉ, SYSTÈME ET DISPOSITIF POUR ROUTER DES PAQUETS | [2009/37] | Entry into regional phase | 25.06.2009 | Translation filed | 25.06.2009 | National basic fee paid | 25.06.2009 | Search fee paid | 25.06.2009 | Designation fee(s) paid | 25.06.2009 | Examination fee paid | Examination procedure | 25.06.2009 | Amendment by applicant (claims and/or description) | 25.06.2009 | Examination requested [2009/37] | 12.03.2010 | Despatch of a communication from the examining division (Time limit: M04) | 14.06.2010 | Reply to a communication from the examining division | 17.01.2011 | Despatch of a communication from the examining division (Time limit: M04) | 12.05.2011 | Reply to a communication from the examining division | 31.05.2011 | Despatch of a communication from the examining division (Time limit: M04) | 21.09.2011 | Reply to a communication from the examining division | 23.11.2011 | Communication of intention to grant the patent | 20.12.2011 | Fee for grant paid | 20.12.2011 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.03.2010 | Opposition(s) | 09.11.2012 | No opposition filed within time limit [2013/03] | Fees paid | Renewal fee | 31.03.2010 | Renewal fee patent year 03 | 30.06.2011 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.06.2008 | AT | 08.02.2012 | BE | 08.02.2012 | CY | 08.02.2012 | CZ | 08.02.2012 | DK | 08.02.2012 | EE | 08.02.2012 | FI | 08.02.2012 | HR | 08.02.2012 | IT | 08.02.2012 | LT | 08.02.2012 | LV | 08.02.2012 | MT | 08.02.2012 | NL | 08.02.2012 | PL | 08.02.2012 | RO | 08.02.2012 | SE | 08.02.2012 | SI | 08.02.2012 | SK | 08.02.2012 | TR | 08.02.2012 | BG | 08.05.2012 | NO | 08.05.2012 | GR | 09.05.2012 | ES | 19.05.2012 | IS | 08.06.2012 | PT | 08.06.2012 | IE | 24.06.2012 | LU | 24.06.2012 | CH | 30.06.2012 | LI | 30.06.2012 | MC | 30.06.2012 | [2014/34] |
Former [2014/27] | AT | 08.02.2012 | |
BE | 08.02.2012 | ||
CY | 08.02.2012 | ||
CZ | 08.02.2012 | ||
DK | 08.02.2012 | ||
EE | 08.02.2012 | ||
FI | 08.02.2012 | ||
HR | 08.02.2012 | ||
IT | 08.02.2012 | ||
LT | 08.02.2012 | ||
LV | 08.02.2012 | ||
MT | 08.02.2012 | ||
NL | 08.02.2012 | ||
PL | 08.02.2012 | ||
RO | 08.02.2012 | ||
SE | 08.02.2012 | ||
SI | 08.02.2012 | ||
SK | 08.02.2012 | ||
TR | 08.02.2012 | ||
BG | 08.05.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
ES | 19.05.2012 | ||
IS | 08.06.2012 | ||
PT | 08.06.2012 | ||
IE | 24.06.2012 | ||
LU | 24.06.2012 | ||
CH | 30.06.2012 | ||
LI | 30.06.2012 | ||
MC | 30.06.2012 | ||
Former [2014/21] | AT | 08.02.2012 | |
BE | 08.02.2012 | ||
CY | 08.02.2012 | ||
CZ | 08.02.2012 | ||
DK | 08.02.2012 | ||
EE | 08.02.2012 | ||
FI | 08.02.2012 | ||
HR | 08.02.2012 | ||
IT | 08.02.2012 | ||
LT | 08.02.2012 | ||
LV | 08.02.2012 | ||
MT | 08.02.2012 | ||
NL | 08.02.2012 | ||
PL | 08.02.2012 | ||
RO | 08.02.2012 | ||
SE | 08.02.2012 | ||
SI | 08.02.2012 | ||
SK | 08.02.2012 | ||
TR | 08.02.2012 | ||
BG | 08.05.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
ES | 19.05.2012 | ||
IS | 08.06.2012 | ||
PT | 08.06.2012 | ||
IE | 24.06.2012 | ||
CH | 30.06.2012 | ||
LI | 30.06.2012 | ||
MC | 30.06.2012 | ||
Former [2013/35] | AT | 08.02.2012 | |
BE | 08.02.2012 | ||
CY | 08.02.2012 | ||
CZ | 08.02.2012 | ||
DK | 08.02.2012 | ||
EE | 08.02.2012 | ||
FI | 08.02.2012 | ||
HR | 08.02.2012 | ||
IT | 08.02.2012 | ||
LT | 08.02.2012 | ||
LV | 08.02.2012 | ||
MT | 08.02.2012 | ||
NL | 08.02.2012 | ||
PL | 08.02.2012 | ||
RO | 08.02.2012 | ||
SE | 08.02.2012 | ||
SI | 08.02.2012 | ||
SK | 08.02.2012 | ||
BG | 08.05.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
ES | 19.05.2012 | ||
IS | 08.06.2012 | ||
PT | 08.06.2012 | ||
IE | 24.06.2012 | ||
CH | 30.06.2012 | ||
LI | 30.06.2012 | ||
MC | 30.06.2012 | ||
Former [2013/33] | AT | 08.02.2012 | |
BE | 08.02.2012 | ||
CY | 08.02.2012 | ||
CZ | 08.02.2012 | ||
DK | 08.02.2012 | ||
EE | 08.02.2012 | ||
FI | 08.02.2012 | ||
HR | 08.02.2012 | ||
IT | 08.02.2012 | ||
LT | 08.02.2012 | ||
LV | 08.02.2012 | ||
NL | 08.02.2012 | ||
PL | 08.02.2012 | ||
RO | 08.02.2012 | ||
SE | 08.02.2012 | ||
SI | 08.02.2012 | ||
SK | 08.02.2012 | ||
BG | 08.05.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
ES | 19.05.2012 | ||
IS | 08.06.2012 | ||
PT | 08.06.2012 | ||
IE | 24.06.2012 | ||
CH | 30.06.2012 | ||
LI | 30.06.2012 | ||
MC | 30.06.2012 | ||
Former [2013/22] | AT | 08.02.2012 | |
BE | 08.02.2012 | ||
CY | 08.02.2012 | ||
CZ | 08.02.2012 | ||
DK | 08.02.2012 | ||
EE | 08.02.2012 | ||
FI | 08.02.2012 | ||
HR | 08.02.2012 | ||
IT | 08.02.2012 | ||
LT | 08.02.2012 | ||
LV | 08.02.2012 | ||
NL | 08.02.2012 | ||
PL | 08.02.2012 | ||
RO | 08.02.2012 | ||
SE | 08.02.2012 | ||
SI | 08.02.2012 | ||
SK | 08.02.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
ES | 19.05.2012 | ||
IS | 08.06.2012 | ||
PT | 08.06.2012 | ||
IE | 24.06.2012 | ||
CH | 30.06.2012 | ||
LI | 30.06.2012 | ||
MC | 30.06.2012 | ||
Former [2013/20] | AT | 08.02.2012 | |
BE | 08.02.2012 | ||
CY | 08.02.2012 | ||
CZ | 08.02.2012 | ||
DK | 08.02.2012 | ||
EE | 08.02.2012 | ||
FI | 08.02.2012 | ||
HR | 08.02.2012 | ||
IT | 08.02.2012 | ||
LT | 08.02.2012 | ||
LV | 08.02.2012 | ||
NL | 08.02.2012 | ||
PL | 08.02.2012 | ||
RO | 08.02.2012 | ||
SE | 08.02.2012 | ||
SI | 08.02.2012 | ||
SK | 08.02.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
IS | 08.06.2012 | ||
PT | 08.06.2012 | ||
IE | 24.06.2012 | ||
CH | 30.06.2012 | ||
LI | 30.06.2012 | ||
MC | 30.06.2012 | ||
Former [2013/08] | AT | 08.02.2012 | |
BE | 08.02.2012 | ||
CY | 08.02.2012 | ||
CZ | 08.02.2012 | ||
DK | 08.02.2012 | ||
EE | 08.02.2012 | ||
FI | 08.02.2012 | ||
HR | 08.02.2012 | ||
IT | 08.02.2012 | ||
LT | 08.02.2012 | ||
LV | 08.02.2012 | ||
NL | 08.02.2012 | ||
PL | 08.02.2012 | ||
RO | 08.02.2012 | ||
SE | 08.02.2012 | ||
SI | 08.02.2012 | ||
SK | 08.02.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
IS | 08.06.2012 | ||
PT | 08.06.2012 | ||
MC | 30.06.2012 | ||
Former [2013/07] | AT | 08.02.2012 | |
BE | 08.02.2012 | ||
CY | 08.02.2012 | ||
CZ | 08.02.2012 | ||
DK | 08.02.2012 | ||
EE | 08.02.2012 | ||
FI | 08.02.2012 | ||
HR | 08.02.2012 | ||
IT | 08.02.2012 | ||
LT | 08.02.2012 | ||
LV | 08.02.2012 | ||
NL | 08.02.2012 | ||
PL | 08.02.2012 | ||
RO | 08.02.2012 | ||
SE | 08.02.2012 | ||
SI | 08.02.2012 | ||
SK | 08.02.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
IS | 08.06.2012 | ||
PT | 08.06.2012 | ||
Former [2012/50] | BE | 08.02.2012 | |
CY | 08.02.2012 | ||
CZ | 08.02.2012 | ||
DK | 08.02.2012 | ||
EE | 08.02.2012 | ||
FI | 08.02.2012 | ||
HR | 08.02.2012 | ||
IT | 08.02.2012 | ||
LT | 08.02.2012 | ||
LV | 08.02.2012 | ||
NL | 08.02.2012 | ||
PL | 08.02.2012 | ||
RO | 08.02.2012 | ||
SE | 08.02.2012 | ||
SI | 08.02.2012 | ||
SK | 08.02.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
IS | 08.06.2012 | ||
PT | 08.06.2012 | ||
Former [2012/49] | BE | 08.02.2012 | |
CY | 08.02.2012 | ||
CZ | 08.02.2012 | ||
DK | 08.02.2012 | ||
EE | 08.02.2012 | ||
FI | 08.02.2012 | ||
HR | 08.02.2012 | ||
LT | 08.02.2012 | ||
LV | 08.02.2012 | ||
NL | 08.02.2012 | ||
PL | 08.02.2012 | ||
RO | 08.02.2012 | ||
SE | 08.02.2012 | ||
SI | 08.02.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
IS | 08.06.2012 | ||
PT | 08.06.2012 | ||
Former [2012/48] | BE | 08.02.2012 | |
CY | 08.02.2012 | ||
EE | 08.02.2012 | ||
FI | 08.02.2012 | ||
HR | 08.02.2012 | ||
LT | 08.02.2012 | ||
LV | 08.02.2012 | ||
NL | 08.02.2012 | ||
PL | 08.02.2012 | ||
SE | 08.02.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
IS | 08.06.2012 | ||
PT | 08.06.2012 | ||
Former [2012/41] | BE | 08.02.2012 | |
CY | 08.02.2012 | ||
FI | 08.02.2012 | ||
HR | 08.02.2012 | ||
LT | 08.02.2012 | ||
LV | 08.02.2012 | ||
NL | 08.02.2012 | ||
PL | 08.02.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
IS | 08.06.2012 | ||
PT | 08.06.2012 | ||
Former [2012/39] | BE | 08.02.2012 | |
FI | 08.02.2012 | ||
HR | 08.02.2012 | ||
LT | 08.02.2012 | ||
LV | 08.02.2012 | ||
NL | 08.02.2012 | ||
PL | 08.02.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
IS | 08.06.2012 | ||
PT | 08.06.2012 | ||
Former [2012/37] | BE | 08.02.2012 | |
FI | 08.02.2012 | ||
HR | 08.02.2012 | ||
LT | 08.02.2012 | ||
NL | 08.02.2012 | ||
PL | 08.02.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
IS | 08.06.2012 | ||
PT | 08.06.2012 | ||
Former [2012/36] | HR | 08.02.2012 | |
LT | 08.02.2012 | ||
NL | 08.02.2012 | ||
NO | 08.05.2012 | ||
GR | 09.05.2012 | ||
IS | 08.06.2012 | ||
Former [2012/35] | LT | 08.02.2012 | |
NL | 08.02.2012 | ||
NO | 08.05.2012 | ||
IS | 08.06.2012 | ||
Former [2012/34] | LT | 08.02.2012 | |
NO | 08.05.2012 | ||
IS | 08.06.2012 | Documents cited: | Search | [A]US2006262735 (GUICHARD JAMES [US], et al) [A] 1-13 * the whole document *; | [X] - CISCO, "Understanding Route Aggregation in BGP", (20050810), pages 1 - 9, URL: http://www.cisco.com/en/US/tech/tk365/technologies_tech_note09186a0080094826.shtml, (20091112), XP002555079 [X] 1-4,6,7 * the whole document * | [X] - XINYANG ZHANG ET AL, "Scaling IP Routing with the Core Router-Integrated Overlay", NETWORK PROTOCOLS, 2006. ICNP '06. PROCEEDINGS OF THE 2006 14TH I EEE INTERNATIONAL CONFERENCE ON, IEEE, PI, (20061101), ISBN 978-1-4244-0593-0, pages 147 - 156, XP031051913 [X] 1-4,6-12 * page 150, column R, line 1 - page 151, column L, line 4; figure 4 * | [PX] - PAUL FRANCIS, HITESH BALLANI, TUAN CAO, CORNELL UNIVERSITY, "A White Paper on Reducing FIB Size through Virtual Aggregation", URL: http://www.cs.cornell.edu/People/francis/va-wp.pdf, (20091112), XP002555080 [PX] 1-4,6-12 * the whole document * | International search | [X]JP2005033470 (KDDI CORP); | [A]CN1697408 (HUAWEI TECH CO LTD [CN]); | [A]CN1745558 (CISCO TECH IND [US]); | [A]CN1832454 (SAMSUNG ELECTRONICS CO LTD [KR]) |