EP2176869 - REDUCED CYCLE TIME MANUFACTURING PROCESSES FOR THICK FILM RESISTIVE DEVICES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.09.2017 Database last updated on 19.07.2024 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Watlow Electric Manufacturing Company 12001 Lackland Road St. Louis, MO 63146 / US | [2010/16] | Inventor(s) | 01 /
PRIVETT, Angie 41 Pioneer Trail Hannibal, MO 63401 / US | 02 /
BRUMMELL, Roger 520 Rosewood Hannibal, MO 63401 / US | 03 /
FORBIS, Larry 56419 Turner Acres New London, MO 63459 / US | [2010/16] | Representative(s) | DREISS Patentanwälte PartG mbB Postfach 10 37 62 70032 Stuttgart / DE | [2016/46] |
Former [2014/09] | DREISS Patentanwälte PartG mbB Patentanwälte Postfach 10 37 62 70032 Stuttgart / DE | ||
Former [2013/30] | Dreiss Patentanwälte Postfach 10 37 62 70032 Stuttgart / DE | ||
Former [2010/16] | Knapp, Thomas Dreiss Patentanwälte Postfach 10 37 62 70032 Stuttgart / DE | Application number, filing date | 08781820.9 | 14.07.2008 | [2010/16] | WO2008US70014 | Priority number, date | US20070779745 | 18.07.2007 Original published format: US 779745 | [2010/16] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2009012239 | Date: | 22.01.2009 | Language: | EN | [2009/04] | Type: | A2 Application without search report | No.: | EP2176869 | Date: | 21.04.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.01.2009 takes the place of the publication of the European patent application. | [2010/16] | Type: | B1 Patent specification | No.: | EP2176869 | Date: | 16.11.2016 | Language: | EN | [2016/46] | Search report(s) | International search report - published on: | EP | 05.03.2009 | Classification | IPC: | H05B3/26, H05B3/46, H01C17/06, B32B37/10 | [2016/22] | CPC: |
H01C17/06 (EP,US);
B32B37/10 (US);
H05B3/262 (EP,US);
H05B3/265 (EP,US);
H05B3/46 (EP,US);
H05B2203/003 (EP,US);
|
Former IPC [2010/16] | H01C17/06, H05B3/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2016/46] |
Former [2010/16] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Extension states | AL | Not yet paid | BA | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG VON DICKSCHICHTWIDERSTANDSVORRICHTUNGEN MIT REDUZIERTER ZYKLENDAUER | [2016/30] | English: | REDUCED CYCLE TIME MANUFACTURING PROCESSES FOR THICK FILM RESISTIVE DEVICES | [2010/16] | French: | PROCÉDÉS DE FABRICATION À TEMPS DE CYCLE RÉDUIT POUR DISPOSITIFS RÉSISTIFS À FILM ÉPAIS | [2010/16] |
Former [2010/16] | PRODUKTIONSPROZESSE MIT VERRINGERTER CYCLUSZEIT FÜR DICKFILM-WIDERSTANDSBAUELEMENTE | Entry into regional phase | 27.01.2010 | National basic fee paid | 27.01.2010 | Designation fee(s) paid | 27.01.2010 | Examination fee paid | Examination procedure | 27.01.2010 | Examination requested [2010/16] | 17.03.2010 | Amendment by applicant (claims and/or description) | 03.01.2013 | Despatch of a communication from the examining division (Time limit: M04) | 07.05.2013 | Reply to a communication from the examining division | 01.07.2016 | Communication of intention to grant the patent | 06.10.2016 | Fee for grant paid | 06.10.2016 | Fee for publishing/printing paid | 06.10.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 03.01.2013 | Opposition(s) | 17.08.2017 | No opposition filed within time limit [2017/43] | Fees paid | Renewal fee | 08.07.2010 | Renewal fee patent year 03 | 16.07.2011 | Renewal fee patent year 04 | 10.07.2012 | Renewal fee patent year 05 | 30.07.2013 | Renewal fee patent year 06 | 08.07.2014 | Renewal fee patent year 07 | 09.07.2015 | Renewal fee patent year 08 | 27.07.2016 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.07.2008 | AT | 16.11.2016 | BE | 16.11.2016 | CY | 16.11.2016 | CZ | 16.11.2016 | DK | 16.11.2016 | EE | 16.11.2016 | ES | 16.11.2016 | FI | 16.11.2016 | HR | 16.11.2016 | IT | 16.11.2016 | LT | 16.11.2016 | LV | 16.11.2016 | MC | 16.11.2016 | NL | 16.11.2016 | PL | 16.11.2016 | RO | 16.11.2016 | SE | 16.11.2016 | SI | 16.11.2016 | SK | 16.11.2016 | TR | 16.11.2016 | BG | 16.02.2017 | NO | 16.02.2017 | GR | 17.02.2017 | IS | 16.03.2017 | PT | 16.03.2017 | IE | 14.07.2017 | LU | 14.07.2017 | MT | 14.07.2017 | CH | 31.07.2017 | LI | 31.07.2017 | [2020/33] |
Former [2020/15] | HU | 14.07.2008 | |
AT | 16.11.2016 | ||
BE | 16.11.2016 | ||
CY | 16.11.2016 | ||
CZ | 16.11.2016 | ||
DK | 16.11.2016 | ||
EE | 16.11.2016 | ||
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
IT | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
MC | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
RO | 16.11.2016 | ||
SE | 16.11.2016 | ||
SI | 16.11.2016 | ||
SK | 16.11.2016 | ||
TR | 16.11.2016 | ||
BG | 16.02.2017 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
IE | 14.07.2017 | ||
LU | 14.07.2017 | ||
MT | 14.07.2017 | ||
CH | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2019/46] | HU | 14.07.2008 | |
AT | 16.11.2016 | ||
BE | 16.11.2016 | ||
CY | 16.11.2016 | ||
CZ | 16.11.2016 | ||
DK | 16.11.2016 | ||
EE | 16.11.2016 | ||
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
IT | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
MC | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
RO | 16.11.2016 | ||
SE | 16.11.2016 | ||
SI | 16.11.2016 | ||
SK | 16.11.2016 | ||
BG | 16.02.2017 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
IE | 14.07.2017 | ||
LU | 14.07.2017 | ||
MT | 14.07.2017 | ||
CH | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2019/31] | HU | 14.07.2008 | |
AT | 16.11.2016 | ||
BE | 16.11.2016 | ||
CZ | 16.11.2016 | ||
DK | 16.11.2016 | ||
EE | 16.11.2016 | ||
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
IT | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
MC | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
RO | 16.11.2016 | ||
SE | 16.11.2016 | ||
SI | 16.11.2016 | ||
SK | 16.11.2016 | ||
BG | 16.02.2017 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
IE | 14.07.2017 | ||
LU | 14.07.2017 | ||
MT | 14.07.2017 | ||
CH | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2019/30] | AT | 16.11.2016 | |
BE | 16.11.2016 | ||
CZ | 16.11.2016 | ||
DK | 16.11.2016 | ||
EE | 16.11.2016 | ||
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
IT | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
MC | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
RO | 16.11.2016 | ||
SE | 16.11.2016 | ||
SI | 16.11.2016 | ||
SK | 16.11.2016 | ||
BG | 16.02.2017 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
IE | 14.07.2017 | ||
LU | 14.07.2017 | ||
MT | 14.07.2017 | ||
CH | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2018/43] | AT | 16.11.2016 | |
BE | 16.11.2016 | ||
CZ | 16.11.2016 | ||
DK | 16.11.2016 | ||
EE | 16.11.2016 | ||
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
IT | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
RO | 16.11.2016 | ||
SE | 16.11.2016 | ||
SI | 16.11.2016 | ||
SK | 16.11.2016 | ||
BG | 16.02.2017 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
IE | 14.07.2017 | ||
LU | 14.07.2017 | ||
MT | 14.07.2017 | ||
CH | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2018/34] | AT | 16.11.2016 | |
BE | 16.11.2016 | ||
CZ | 16.11.2016 | ||
DK | 16.11.2016 | ||
EE | 16.11.2016 | ||
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
IT | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
RO | 16.11.2016 | ||
SE | 16.11.2016 | ||
SI | 16.11.2016 | ||
SK | 16.11.2016 | ||
BG | 16.02.2017 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
IE | 14.07.2017 | ||
LU | 14.07.2017 | ||
CH | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2018/23] | AT | 16.11.2016 | |
BE | 16.11.2016 | ||
CZ | 16.11.2016 | ||
DK | 16.11.2016 | ||
EE | 16.11.2016 | ||
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
IT | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
RO | 16.11.2016 | ||
SE | 16.11.2016 | ||
SI | 16.11.2016 | ||
SK | 16.11.2016 | ||
BG | 16.02.2017 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
IE | 14.07.2017 | ||
CH | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2018/21] | AT | 16.11.2016 | |
BE | 16.11.2016 | ||
CZ | 16.11.2016 | ||
DK | 16.11.2016 | ||
EE | 16.11.2016 | ||
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
IT | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
RO | 16.11.2016 | ||
SE | 16.11.2016 | ||
SI | 16.11.2016 | ||
SK | 16.11.2016 | ||
BG | 16.02.2017 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
CH | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2017/52] | AT | 16.11.2016 | |
BE | 16.11.2016 | ||
CZ | 16.11.2016 | ||
DK | 16.11.2016 | ||
EE | 16.11.2016 | ||
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
IT | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
RO | 16.11.2016 | ||
SE | 16.11.2016 | ||
SI | 16.11.2016 | ||
SK | 16.11.2016 | ||
BG | 16.02.2017 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
Former [2017/38] | AT | 16.11.2016 | |
BE | 16.11.2016 | ||
CZ | 16.11.2016 | ||
DK | 16.11.2016 | ||
EE | 16.11.2016 | ||
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
IT | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
RO | 16.11.2016 | ||
SE | 16.11.2016 | ||
SK | 16.11.2016 | ||
BG | 16.02.2017 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
Former [2017/37] | AT | 16.11.2016 | |
BE | 16.11.2016 | ||
CZ | 16.11.2016 | ||
DK | 16.11.2016 | ||
EE | 16.11.2016 | ||
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
IT | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
RO | 16.11.2016 | ||
SE | 16.11.2016 | ||
SK | 16.11.2016 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
Former [2017/36] | AT | 16.11.2016 | |
BE | 16.11.2016 | ||
CZ | 16.11.2016 | ||
DK | 16.11.2016 | ||
EE | 16.11.2016 | ||
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
RO | 16.11.2016 | ||
SE | 16.11.2016 | ||
SK | 16.11.2016 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
Former [2017/35] | AT | 16.11.2016 | |
CZ | 16.11.2016 | ||
DK | 16.11.2016 | ||
EE | 16.11.2016 | ||
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
RO | 16.11.2016 | ||
SE | 16.11.2016 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
Former [2017/33] | AT | 16.11.2016 | |
DK | 16.11.2016 | ||
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
SE | 16.11.2016 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
Former [2017/26] | AT | 16.11.2016 | |
ES | 16.11.2016 | ||
FI | 16.11.2016 | ||
HR | 16.11.2016 | ||
LT | 16.11.2016 | ||
LV | 16.11.2016 | ||
NL | 16.11.2016 | ||
PL | 16.11.2016 | ||
SE | 16.11.2016 | ||
NO | 16.02.2017 | ||
GR | 17.02.2017 | ||
PT | 16.03.2017 | ||
Former [2017/12] | LV | 16.11.2016 | Cited in | International search | [A]CA2018113 (FORD MOTOR CANADA [CA]) [A] 1-39* page 4 - page 5 *; | [A]EP0720416 (BOSCH GMBH ROBERT [DE]) [A] 1-39 * column 3 *; | [A]GB2316848 (STRIX LTD [GB]) [A] 1-39 * page 4 - page 5 *; | [A]US5729814 (SUZUKI MAKOTO [JP], et al) [A] 1-39 * column 4 *; | [X]GB2338632 (PIFCO LTD [GB]) [X] 1-3,5,11,12,14,35 * page 10 - page 11 *; | [A]WO0111924 (WATLOW ELECTRIC MFG [US]) [A] 1-39 * the whole document *; | [A]US2005145617 (MCMILLIN JAMES [US], et al) [A] 1-39 * the whole document *; | [X]US2006054616 (PTASIENSKI KEVIN [US], et al) [X] 15-26,28 * claim 1 * |