blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2192975

EP2192975 - REACTOR AND METHOD FOR THE PRODUCTION THEREOF [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  20.05.2011
Database last updated on 14.09.2024
Most recent event   Tooltip20.05.2011Application deemed to be withdrawnpublished on 22.06.2011  [2011/25]
Applicant(s)For all designated states
Bayer Technology Services GmbH
51368 Leverkusen / DE
[2010/23]
Inventor(s)01 / SCHELLEN, Ralph
Hardenbergstrasse 9
41539 Dormagen / DE
02 / HIZALER HOFFMANN, Evin
Em Parkveedel 23c
50733 Köln / DE
03 / MLECZKO, Leslaw
Quittenweg 1
41542 Dormagen / DE
04 / SCHUBERT, Stephan
2202 Canterbury Drive
League City, TX 77573 / US
 [2010/23]
Application number, filing date08801889.006.09.2008
[2010/23]
WO2008EP07297
Priority number, dateDE2007104512320.09.2007         Original published format: DE102007045123
[2010/23]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2009039946
Date:02.04.2009
Language:DE
[2009/14]
Type: A1 Application with search report 
No.:EP2192975
Date:09.06.2010
Language:DE
The application published by WIPO in one of the EPO official languages on 02.04.2009 takes the place of the publication of the European patent application.
[2010/23]
Search report(s)International search report - published on:EP02.04.2009
ClassificationIPC:B01J8/02, B01J8/04, B01J19/00, B01J19/24, B23K1/00, F28D9/00
[2010/23]
CPC:
F28D9/0037 (EP,US); B01J19/0013 (EP,US); B01J19/2485 (EP,US);
B01J8/0453 (EP,US); B01J8/0496 (EP,US); B01J2208/00194 (EP,US);
B01J2208/00212 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2010/23]
TitleGerman:REAKTOR UND VERFAHREN ZU DESSEN HERSTELLUNG[2010/23]
English:REACTOR AND METHOD FOR THE PRODUCTION THEREOF[2010/23]
French:RÉACTEUR ET SON PROCÉDÉ DE FABRICATION[2010/23]
Entry into regional phase20.04.2010National basic fee paid 
20.04.2010Designation fee(s) paid 
20.04.2010Examination fee paid 
Examination procedure20.04.2010Examination requested  [2010/23]
19.05.2010Amendment by applicant (claims and/or description)
20.08.2010Despatch of a communication from the examining division (Time limit: M04)
31.12.2010Application deemed to be withdrawn, date of legal effect  [2011/25]
08.02.2011Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2011/25]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  20.08.2010
Fees paidPenalty fee
Additional fee for renewal fee
30.09.201003   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[X]WO9837457  (ATOTECH DEUTSCHLAND GMBH [DE], et al) [X] 1-3,6-9,12,13 * page 10, lines 2-4 * * page 11, line 18 - page 12, line 17 * * page 23, lines 23-28 * * claims 1,11,16-19 *;
 [X]EP0529329  (ISHIKAWAJIMA HARIMA HEAVY IND [JP]) [X] 1,6-8,13 * figure 1; claims 1,2 *;
 [X]DE19825102  (DBB FUEL CELL ENGINES GMBH [DE]) [X] 1-3,6-8,10-13 * column 3, lines 9-25; claims 1,2 *;
 [A]DE3613596  (SCHNEIDER CHRISTIAN DIPL ING [DE]) [A] * column 3, lines 64-69 * * column 4, lines 34-36 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.