EP2181198 - METHOD FOR OPERATING A CONTINUOUS ANNEALING OR GALVANISATION LINE FOR A METAL STRIP [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.07.2019 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 03.08.2018 | ||
Former | Grant of patent is intended Status updated on 05.02.2018 | ||
Former | Examination is in progress Status updated on 11.11.2016 | Most recent event Tooltip | 23.07.2021 | Lapse of the patent in a contracting state New state(s): MT | published on 25.08.2021 [2021/34] | Applicant(s) | For all designated states Primetals Technologies France SAS 41, Route de Feurs 42600 Savigneux / FR | [2015/35] |
Former [2010/18] | For all designated states Siemens VAI Metals Technologies SAS 51 Rue Sibert 42403 Saint Chamond / FR | Inventor(s) | 01 /
BORREL, Pierre-Jérôme 9 rue des Poilus F-42400 Saint Chamond / FR | [2010/18] | Representative(s) | Metals@Linz Primetals Technologies Austria GmbH Intellectual Property Upstream IP UP Turmstraße 44 4031 Linz / AT | [2018/36] |
Former [2014/35] | Maier, Daniel Oliver, et al Siemens AG Postfach 22 16 34 80506 München / DE | ||
Former [2010/18] | Fischer, Michael Siemens AG, Postfach 22 16 34 80506 München / DE | Application number, filing date | 08828389.0 | 04.07.2008 | [2010/18] | WO2008FR00982 | Priority number, date | FR20070057297 | 31.08.2007 Original published format: FR 0757297 | [2010/18] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2009027593 | Date: | 05.03.2009 | Language: | FR | [2009/10] | Type: | A1 Application with search report | No.: | EP2181198 | Date: | 05.05.2010 | Language: | FR | The application published by WIPO in one of the EPO official languages on 05.03.2009 takes the place of the publication of the European patent application. | [2010/18] | Type: | B1 Patent specification | No.: | EP2181198 | Date: | 05.09.2018 | Language: | FR | [2018/36] | Search report(s) | International search report - published on: | EP | 05.03.2009 | Classification | IPC: | C21D1/52, C21D9/56, C21D1/76 | [2010/18] | CPC: |
C21D1/52 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/36] |
Former [2010/18] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | VERFAHREN ZUM BETREIBEN EINER DURCHGEHENDEN GLÜH- ODER GALVANISIERUNGSLEITUNG FÜR EINEN METALLSTREIFEN | [2010/18] | English: | METHOD FOR OPERATING A CONTINUOUS ANNEALING OR GALVANISATION LINE FOR A METAL STRIP | [2010/18] | French: | PROCEDE DE MISE EN UVRE D'UNE LIGNE DE RECUIT OU DE GALVANISATION EN CONTINU D'UNE BANDE METALLIQUE | [2010/18] | Entry into regional phase | 18.12.2009 | National basic fee paid | 18.12.2009 | Designation fee(s) paid | 18.12.2009 | Examination fee paid | Examination procedure | 18.12.2009 | Examination requested [2010/18] | 23.07.2010 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 01.09.2010 | Amendment by applicant (claims and/or description) | 17.03.2016 | Despatch of a communication from the examining division (Time limit: M04) | 11.07.2016 | Reply to a communication from the examining division | 02.11.2016 | Despatch of a communication from the examining division (Time limit: M04) | 09.02.2017 | Reply to a communication from the examining division | 06.02.2018 | Communication of intention to grant the patent | 22.05.2018 | Fee for grant paid | 22.05.2018 | Fee for publishing/printing paid | 22.05.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.03.2016 | Opposition(s) | 06.06.2019 | No opposition filed within time limit [2019/33] | Request for further processing for: | 01.09.2010 | Request for further processing filed | 01.09.2010 | Full payment received (date of receipt of payment) | Fees paid | Renewal fee | 19.07.2010 | Renewal fee patent year 03 | 18.07.2011 | Renewal fee patent year 04 | 20.07.2012 | Renewal fee patent year 05 | 19.07.2013 | Renewal fee patent year 06 | 18.07.2014 | Renewal fee patent year 07 | 20.07.2015 | Renewal fee patent year 08 | 22.07.2016 | Renewal fee patent year 09 | 24.07.2017 | Renewal fee patent year 10 | 27.07.2018 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.07.2008 | CY | 05.09.2018 | CZ | 05.09.2018 | DK | 05.09.2018 | EE | 05.09.2018 | ES | 05.09.2018 | FI | 05.09.2018 | HR | 05.09.2018 | LT | 05.09.2018 | LV | 05.09.2018 | MC | 05.09.2018 | MT | 05.09.2018 | NL | 05.09.2018 | PL | 05.09.2018 | RO | 05.09.2018 | SE | 05.09.2018 | SI | 05.09.2018 | SK | 05.09.2018 | TR | 05.09.2018 | BG | 05.12.2018 | NO | 05.12.2018 | GR | 06.12.2018 | IS | 05.01.2019 | PT | 05.01.2019 | [2021/34] |
Former [2021/32] | HU | 04.07.2008 | |
CY | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2021/26] | CY | 05.09.2018 | |
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2020/17] | CZ | 05.09.2018 | |
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2020/14] | CZ | 05.09.2018 | |
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/37] | CZ | 05.09.2018 | |
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/34] | CZ | 05.09.2018 | |
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/26] | CZ | 05.09.2018 | |
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/24] | CZ | 05.09.2018 | |
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/22] | CZ | 05.09.2018 | |
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/21] | ES | 05.09.2018 | |
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/20] | ES | 05.09.2018 | |
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/12] | ES | 05.09.2018 | |
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/11] | FI | 05.09.2018 | |
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/10] | FI | 05.09.2018 | |
LT | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/08] | FI | 05.09.2018 | |
LT | 05.09.2018 | ||
NO | 05.12.2018 | ||
Former [2019/07] | LT | 05.09.2018 | Cited in | International search | [XD]US3936543 (BYRD FRED, et al) [XD] 1-10 * column 3, line 45 - column 4, line 66; figures 1-3; claims 1-11 *; | [XA]FR2824078 (AIR LIQUIDE [FR]) [X] 1-3 * page 7, line 23 - page 8, line 6; figures 1-7; claims 1-3 * [A] 4-10; | [A]FR2785668 (AIR LIQUIDE [FR]) [A] 1-10 * pages 8-10; figures 1,2; claims 1-18 *; | [A]WO2007087973 (LINDE AG [DE], et al) [A] 1-10 * page 2, lines 10-33; figures 3,4; claims 1-9 *; | [A]JPH09263836 (NIPPON STEEL CORP) [A] 1-10 * abstract *; | [A]WO0221061 (AIR LIQUIDE [FR]) [A] 1-10 * figure 3; claims 1-7 *; | [A]WO2004097318 (AIR LIQUIDE [FR], et al) [A] 1-10 * figures 1-3; claims 1-6 *; | [A] - FADERL J ET AL, "LE SYSTEME DE VAI POUR LE CONTROLE DU RECUIT APRES ZINGAGE: LA TECHNOLOGIE, LES RESULTATS, LES AVANTAGES", REVUE DE METALLURGIE - CAHIERS D'INFORMATIONS TECHNIQUES, REVUE DE METALLURGIE. PARIS, FR, (19990101), vol. 96, no. 1, ISSN 0035-1563, pages 67 - 79, XP000824007 [A] 1-10 * abstract * |