EP2209243 - CFO and DCO distortion amount estimation method, and reception signal correction method and reception device using the method [Right-click to bookmark this link] | |||
Former [2010/29] | CFO AND DCO DISTORTION AMOUNT ESTIMATION METHOD, AND RECEPTION SIGNAL CORRECTION METHOD AND RECEPTION DEVICE USING THE METHOD | ||
[2013/15] | Status | No opposition filed within time limit Status updated on 02.05.2014 Database last updated on 21.01.2025 | Most recent event Tooltip | 04.09.2015 | Lapse of the patent in a contracting state New state(s): MT | published on 07.10.2015 [2015/41] | Applicant(s) | For all designated states Osaka Prefecture University Public Corporation 1-1, Gakuencho Naka-ku Sakai-shi Osaka 599-8531 / JP | [2010/29] | Inventor(s) | 01 /
LIN, Hai c/o Osaka Prefecture University Public Corporation 1-1 Gakuen-cho Naka-ku Sakai-shi Osaka 599-8531 / JP | 02 /
YAMASHITA, Katsumi c/o Osaka Prefecture University Public Corporation 1-1 Gakuen-cho Naka-ku Sakai-shi Osaka 599-8531 / JP | [2013/26] |
Former [2010/29] | 01 /
LIN, Hai c/o Osaka Prefecture University Public Corporation 1-1 Gakuen-cho Naka-ku Sakai-shi Osaka 599-8531 / JP | ||
02 /
YAMASHITA, Katsumi c/o Osaka Prefecture University Public Corporation 1-1 Gakuen-cho Naka-ku Sakai-shi Osaka 599-8531 / JP | Representative(s) | Haley, Stephen Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2013/26] |
Former [2010/29] | Haley, Stephen Gill Jennings & Every LLP Broadgate House 7 Eldon Street London EC2M 7LH / GB | Application number, filing date | 08846803.8 | 05.11.2008 | [2010/29] | WO2008JP70141 | Priority number, date | JP20070287771 | 05.11.2007 Original published format: JP 2007287771 | [2010/29] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009060874 | Date: | 14.05.2009 | Language: | JA | [2009/20] | Type: | A1 Application with search report | No.: | EP2209243 | Date: | 21.07.2010 | Language: | EN | [2010/29] | Type: | B1 Patent specification | No.: | EP2209243 | Date: | 26.06.2013 | Language: | EN | [2013/26] | Search report(s) | International search report - published on: | JP | 14.05.2009 | (Supplementary) European search report - dispatched on: | EP | 20.08.2012 | Classification | IPC: | H04J11/00, H04L27/26 | [2012/38] | CPC: |
H04L27/2657 (EP,US);
H04L27/2675 (EP,US)
|
Former IPC [2010/29] | H04J11/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2010/29] | Title | German: | Verfahren zur Schätzung einer CFO- und DCO-Verzerrung sowie Verfahren zur Korrektur eines Empfangssignals und Empfangsvorrichtung zur Anwendung dieses Verfahrens | [2013/15] | English: | CFO and DCO distortion amount estimation method, and reception signal correction method and reception device using the method | [2013/15] | French: | Procédé d'estimation de quantité de distorsion de CFO et de DCO, procédé de correction de signal de réception et dispositif de réception mettant en uvre ce procédé | [2013/15] |
Former [2010/29] | VERFAHREN ZUR SCHÄTZUNG EINER CFO- UND DCO-VERZERRUNG SOWIE VERFAHREN ZUR KORREKTUR EINES EMPFANGSSIGNALS UND EMPFANGSVORRICHTUNG ZUR ANWENDUNG DIESES VERFAHRENS | ||
Former [2010/29] | CFO AND DCO DISTORTION AMOUNT ESTIMATION METHOD, AND RECEPTION SIGNAL CORRECTION METHOD AND RECEPTION DEVICE USING THE METHOD | ||
Former [2010/29] | PROCEDE D'ESTIMATION DE QUANTITE DE DISTORSION DE CFO ET DE DCO, PROCEDE DE CORRECTION DE SIGNAL DE RECEPTION ET DISPOSITIF DE RECEPTION METTANT EN UVRE CE PROCEDE | Entry into regional phase | 23.04.2010 | Translation filed | 04.05.2010 | National basic fee paid | 04.05.2010 | Search fee paid | 04.05.2010 | Designation fee(s) paid | 04.05.2010 | Examination fee paid | Examination procedure | 04.05.2010 | Examination requested [2010/29] | 06.11.2012 | Amendment by applicant (claims and/or description) | 26.11.2012 | Despatch of a communication from the examining division (Time limit: M04) | 19.02.2013 | Reply to a communication from the examining division | 12.03.2013 | Communication of intention to grant the patent | 13.05.2013 | Fee for grant paid | 13.05.2013 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 26.11.2012 | Opposition(s) | 27.03.2014 | No opposition filed within time limit [2014/23] | Fees paid | Renewal fee | 12.11.2010 | Renewal fee patent year 03 | 14.11.2011 | Renewal fee patent year 04 | 13.11.2012 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.11.2008 | AT | 26.06.2013 | BE | 26.06.2013 | CY | 26.06.2013 | CZ | 26.06.2013 | DK | 26.06.2013 | EE | 26.06.2013 | FI | 26.06.2013 | HR | 26.06.2013 | IT | 26.06.2013 | LT | 26.06.2013 | LV | 26.06.2013 | MC | 26.06.2013 | MT | 26.06.2013 | NL | 26.06.2013 | PL | 26.06.2013 | RO | 26.06.2013 | SE | 26.06.2013 | SI | 26.06.2013 | SK | 26.06.2013 | TR | 26.06.2013 | BG | 26.09.2013 | NO | 26.09.2013 | GR | 27.09.2013 | ES | 07.10.2013 | IS | 26.10.2013 | PT | 28.10.2013 | GB | 05.11.2013 | IE | 05.11.2013 | LU | 05.11.2013 | CH | 30.11.2013 | LI | 30.11.2013 | FR | 02.12.2013 | [2015/41] |
Former [2015/34] | HU | 05.11.2008 | |
AT | 26.06.2013 | ||
BE | 26.06.2013 | ||
CY | 26.06.2013 | ||
CZ | 26.06.2013 | ||
DK | 26.06.2013 | ||
EE | 26.06.2013 | ||
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
IT | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
MC | 26.06.2013 | ||
NL | 26.06.2013 | ||
PL | 26.06.2013 | ||
RO | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
SK | 26.06.2013 | ||
TR | 26.06.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
ES | 07.10.2013 | ||
IS | 26.10.2013 | ||
PT | 28.10.2013 | ||
GB | 05.11.2013 | ||
IE | 05.11.2013 | ||
LU | 05.11.2013 | ||
CH | 30.11.2013 | ||
LI | 30.11.2013 | ||
FR | 02.12.2013 | ||
Former [2015/32] | AT | 26.06.2013 | |
BE | 26.06.2013 | ||
CY | 26.06.2013 | ||
CZ | 26.06.2013 | ||
DK | 26.06.2013 | ||
EE | 26.06.2013 | ||
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
IT | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
MC | 26.06.2013 | ||
NL | 26.06.2013 | ||
PL | 26.06.2013 | ||
RO | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
SK | 26.06.2013 | ||
TR | 26.06.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
ES | 07.10.2013 | ||
IS | 26.10.2013 | ||
PT | 28.10.2013 | ||
GB | 05.11.2013 | ||
IE | 05.11.2013 | ||
CH | 30.11.2013 | ||
LI | 30.11.2013 | ||
FR | 02.12.2013 | ||
Former [2014/51] | AT | 26.06.2013 | |
BE | 26.06.2013 | ||
CY | 26.06.2013 | ||
CZ | 26.06.2013 | ||
DK | 26.06.2013 | ||
EE | 26.06.2013 | ||
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
IT | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
MC | 26.06.2013 | ||
NL | 26.06.2013 | ||
PL | 26.06.2013 | ||
RO | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
SK | 26.06.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
ES | 07.10.2013 | ||
IS | 26.10.2013 | ||
PT | 28.10.2013 | ||
GB | 05.11.2013 | ||
IE | 05.11.2013 | ||
CH | 30.11.2013 | ||
LI | 30.11.2013 | ||
FR | 02.12.2013 | ||
Former [2014/48] | AT | 26.06.2013 | |
BE | 26.06.2013 | ||
CY | 26.06.2013 | ||
CZ | 26.06.2013 | ||
DK | 26.06.2013 | ||
EE | 26.06.2013 | ||
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
IT | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
MC | 26.06.2013 | ||
NL | 26.06.2013 | ||
PL | 26.06.2013 | ||
RO | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
SK | 26.06.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
ES | 07.10.2013 | ||
IS | 26.10.2013 | ||
PT | 28.10.2013 | ||
IE | 05.11.2013 | ||
CH | 30.11.2013 | ||
LI | 30.11.2013 | ||
Former [2014/34] | AT | 26.06.2013 | |
BE | 26.06.2013 | ||
CY | 26.06.2013 | ||
CZ | 26.06.2013 | ||
DK | 26.06.2013 | ||
EE | 26.06.2013 | ||
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
IT | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
MC | 26.06.2013 | ||
NL | 26.06.2013 | ||
PL | 26.06.2013 | ||
RO | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
SK | 26.06.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
ES | 07.10.2013 | ||
IS | 26.10.2013 | ||
PT | 28.10.2013 | ||
CH | 30.11.2013 | ||
LI | 30.11.2013 | ||
Former [2014/33] | AT | 26.06.2013 | |
BE | 26.06.2013 | ||
CY | 26.06.2013 | ||
CZ | 26.06.2013 | ||
DK | 26.06.2013 | ||
EE | 26.06.2013 | ||
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
IT | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
MC | 26.06.2013 | ||
NL | 26.06.2013 | ||
PL | 26.06.2013 | ||
RO | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
SK | 26.06.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
ES | 07.10.2013 | ||
IS | 26.10.2013 | ||
PT | 28.10.2013 | ||
Former [2014/24] | AT | 26.06.2013 | |
BE | 26.06.2013 | ||
CY | 26.06.2013 | ||
CZ | 26.06.2013 | ||
DK | 26.06.2013 | ||
EE | 26.06.2013 | ||
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
IT | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
NL | 26.06.2013 | ||
PL | 26.06.2013 | ||
RO | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
SK | 26.06.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
ES | 07.10.2013 | ||
IS | 26.10.2013 | ||
PT | 28.10.2013 | ||
Former [2014/21] | AT | 26.06.2013 | |
BE | 26.06.2013 | ||
CY | 26.06.2013 | ||
CZ | 26.06.2013 | ||
DK | 26.06.2013 | ||
EE | 26.06.2013 | ||
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
NL | 26.06.2013 | ||
PL | 26.06.2013 | ||
RO | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
SK | 26.06.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
ES | 07.10.2013 | ||
IS | 26.10.2013 | ||
PT | 28.10.2013 | ||
Former [2014/18] | AT | 26.06.2013 | |
BE | 26.06.2013 | ||
CY | 26.06.2013 | ||
CZ | 26.06.2013 | ||
EE | 26.06.2013 | ||
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
NL | 26.06.2013 | ||
PL | 26.06.2013 | ||
RO | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
SK | 26.06.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
ES | 07.10.2013 | ||
IS | 26.10.2013 | ||
PT | 28.10.2013 | ||
Former [2014/14] | AT | 26.06.2013 | |
BE | 26.06.2013 | ||
CZ | 26.06.2013 | ||
EE | 26.06.2013 | ||
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
NL | 26.06.2013 | ||
PL | 26.06.2013 | ||
RO | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
SK | 26.06.2013 | ||
CY | 04.09.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
ES | 07.10.2013 | ||
IS | 26.10.2013 | ||
PT | 28.10.2013 | ||
Former [2014/12] | AT | 26.06.2013 | |
BE | 26.06.2013 | ||
CZ | 26.06.2013 | ||
EE | 26.06.2013 | ||
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
PL | 26.06.2013 | ||
RO | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
SK | 26.06.2013 | ||
CY | 04.09.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
ES | 07.10.2013 | ||
IS | 26.10.2013 | ||
PT | 28.10.2013 | ||
Former [2014/11] | AT | 26.06.2013 | |
BE | 26.06.2013 | ||
CZ | 26.06.2013 | ||
EE | 26.06.2013 | ||
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
PL | 26.06.2013 | ||
RO | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
SK | 26.06.2013 | ||
CY | 04.09.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
IS | 26.10.2013 | ||
PT | 28.10.2013 | ||
Former [2014/10] | AT | 26.06.2013 | |
BE | 26.06.2013 | ||
CZ | 26.06.2013 | ||
EE | 26.06.2013 | ||
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
SK | 26.06.2013 | ||
CY | 04.09.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
IS | 26.10.2013 | ||
PT | 28.10.2013 | ||
Former [2014/09] | AT | 26.06.2013 | |
BE | 26.06.2013 | ||
EE | 26.06.2013 | ||
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
PT | 28.10.2013 | ||
Former [2014/08] | BE | 26.06.2013 | |
FI | 26.06.2013 | ||
HR | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
PT | 28.10.2013 | ||
Former [2014/02] | FI | 26.06.2013 | |
HR | 26.06.2013 | ||
LT | 26.06.2013 | ||
LV | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
Former [2013/51] | FI | 26.06.2013 | |
HR | 26.06.2013 | ||
LT | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
Former [2013/50] | FI | 26.06.2013 | |
LT | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
BG | 26.09.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
Former [2013/49] | FI | 26.06.2013 | |
LT | 26.06.2013 | ||
SE | 26.06.2013 | ||
SI | 26.06.2013 | ||
NO | 26.09.2013 | ||
GR | 27.09.2013 | ||
Former [2013/47] | LT | 26.06.2013 | |
NO | 26.09.2013 | Documents cited: | Search | [ ] - No further relevant documents disclosed | International search | [A]JP2001244835 (MATSUSHITA ELECTRIC IND CO LTD); | [A]JP2003032216 (FUJITSU GENERAL LTD); | [A]JP2004304507 (RENESAS TECH CORP); | [AP]JP2008236704 (SONY CORP); | [AE]WO2008156133 (UNIV OSAKA PREFECT PUBLIC CORP [JP], et al); | [XP] - HAI LIN ET AL., "A Low- Complexity Carrier Frequency Offset Estimator Independent of DC Offset", COMMUNICATIONS LERRERS, (200807), vol. 12, no. 7, pages 520 - 522, XP011231653 DOI: http://dx.doi.org/10.1109/LCOMM.2008.080408 | [AP] - HAI LIN ET AL., "Estimation of Carrier Frequency Offset and DC Offset for OFDM Systems", COMMUNICATIONS, IEEE TRANSACTIONS ON, (200805), vol. 56, no. 5, pages 704 - 707, XP011227205 DOI: http://dx.doi.org/10.1109/TCOMM.2008.060215 | [A] - HAI LIN ET AL., "Blind Carrier Frequency Offset Estimation for OFDM Systems with DC Offset", Global Telecommunications Conference, 2006. GLOBECOM'06., IEEE, (2006), pages 1 - 5, XP031075606 DOI: http://dx.doi.org/10.1109/GLOCOM.2006.785 | [A] - HAI LIN ET AL., "Subspace-based OFDM Carrier Frequency Offset Estimation in the Presence of DC Offset", Communications, 2007. ICC'07. IEEE International Conference on, (200706), pages 2883 - 2887, XP031126112 |