EP2219986 - METHOD FOR ESTABLISHING A WIND TURBINE ON A SITE, TRANSPORT OF A WIND TURBINE TOWER, WIND TURBINE TOWER AND VESSEL SUITABLE FOR TRANSPORTING A WIND TURBINE TOWER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.03.2014 Database last updated on 30.10.2024 | Most recent event Tooltip | 04.09.2015 | Lapse of the patent in a contracting state New state(s): MT | published on 07.10.2015 [2015/41] | Applicant(s) | For all designated states Vestas Wind Systems A/S Hedeager 44 8200 Aarhus N / DK | [2013/21] |
Former [2011/50] | For all designated states Vestas Wind Systems A/S Hedeager 44 8200 Aarhus N / DK | ||
Former [2010/34] | For all designated states Vestas Wind Systems A/S Alsvej 21 8940 Randers SV / DK | Inventor(s) | 01 /
SOE-JENSEN, Anders Klintedalen 32 DK-3520 Farum / DK | [2010/34] | Representative(s) | Inspicos P/S Agern Allé 24 2970 Hørsholm / DK | [N/P] |
Former [2012/18] | Inspicos A/S Kogle Allé 2 P.O. Box 45 2970 Hørsholm / DK | ||
Former [2010/34] | Henriksen, Michael, et al Patentgruppen A/S Arosgården Åboulevarden 31 8000 Århus C / DK | Application number, filing date | 08854055.4 | 01.12.2008 | [2010/34] | WO2008DK00425 | Priority number, date | DK20070001708 | 29.11.2007 Original published format: DK 200701708 | [2010/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009068038 | Date: | 04.06.2009 | Language: | EN | [2009/23] | Type: | A1 Application with search report | No.: | EP2219986 | Date: | 25.08.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.06.2009 takes the place of the publication of the European patent application. | [2010/34] | Type: | B1 Patent specification | No.: | EP2219986 | Date: | 22.05.2013 | Language: | EN | [2013/21] | Search report(s) | International search report - published on: | EP | 04.06.2009 | Classification | IPC: | B66C23/52, E02B17/02, B66C23/18, B66C1/62, F03D11/04, F03D1/04, F03D1/00 | [2011/51] | CPC: |
B66C1/62 (EP,US);
B66C23/185 (EP,US);
B66C23/52 (EP,US);
E02B17/027 (EP,US);
F03D13/10 (EP,US);
F03D13/20 (EP,US);
F03D13/22 (EP,US);
F03D13/25 (EP,US);
F03D13/40 (EP,US);
E02B2017/0043 (EP,US);
Y02E10/72 (EP,US);
Y02E10/727 (EP,US);
|
Former IPC [2010/34] | B66C1/62, F03D1/00, F03D11/04 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2010/34] | Title | German: | VERFAHREN ZUM ERRICHTEN EINER WINDTURBINE AN EINEM STANDORT, TRANSPORT EINES WINDTURBINENTURMS, WINDTURBINENTURM UND FÜR DEN TRANSPORT EINES WINDTURBINENTURMS GEEIGNETES SCHIFF | [2010/34] | English: | METHOD FOR ESTABLISHING A WIND TURBINE ON A SITE, TRANSPORT OF A WIND TURBINE TOWER, WIND TURBINE TOWER AND VESSEL SUITABLE FOR TRANSPORTING A WIND TURBINE TOWER | [2010/34] | French: | PROCÉDÉ POUR INSTALLER UNE ÉOLIENNE SUR UN SITE, TRANSPORT D'UN PYLÔNE D'ÉOLIENNE, PYLÔNE D'ÉOLIENNE ET VAISSEAU APPROPRIÉ POUR TRANSPORTER UN PYLÔNE D'ÉOLIENNE | [2010/34] | Entry into regional phase | 28.06.2010 | National basic fee paid | 28.06.2010 | Designation fee(s) paid | 28.06.2010 | Examination fee paid | Examination procedure | 28.06.2010 | Examination requested [2010/34] | 09.08.2010 | Amendment by applicant (claims and/or description) | 21.11.2011 | Despatch of a communication from the examining division (Time limit: M06) | 13.04.2012 | Reply to a communication from the examining division | 10.05.2012 | Despatch of a communication from the examining division (Time limit: M04) | 29.05.2012 | Reply to a communication from the examining division | 03.08.2012 | Despatch of a communication from the examining division (Time limit: M04) | 27.08.2012 | Reply to a communication from the examining division | 09.01.2013 | Communication of intention to grant the patent | 15.04.2013 | Fee for grant paid | 15.04.2013 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 21.11.2011 | Opposition(s) | 25.02.2014 | No opposition filed within time limit [2014/18] | Fees paid | Renewal fee | 17.12.2010 | Renewal fee patent year 03 | 20.12.2011 | Renewal fee patent year 04 | 13.12.2012 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.12.2008 | AT | 22.05.2013 | BE | 22.05.2013 | CY | 22.05.2013 | CZ | 22.05.2013 | EE | 22.05.2013 | FI | 22.05.2013 | HR | 22.05.2013 | IT | 22.05.2013 | LT | 22.05.2013 | LV | 22.05.2013 | MC | 22.05.2013 | MT | 22.05.2013 | NL | 22.05.2013 | PL | 22.05.2013 | RO | 22.05.2013 | SE | 22.05.2013 | SI | 22.05.2013 | SK | 22.05.2013 | TR | 22.05.2013 | BG | 22.08.2013 | NO | 22.08.2013 | GR | 23.08.2013 | ES | 02.09.2013 | IS | 22.09.2013 | PT | 23.09.2013 | IE | 01.12.2013 | LU | 01.12.2013 | CH | 31.12.2013 | LI | 31.12.2013 | [2015/41] |
Former [2015/34] | HU | 01.12.2008 | |
AT | 22.05.2013 | ||
BE | 22.05.2013 | ||
CY | 22.05.2013 | ||
CZ | 22.05.2013 | ||
EE | 22.05.2013 | ||
FI | 22.05.2013 | ||
HR | 22.05.2013 | ||
IT | 22.05.2013 | ||
LT | 22.05.2013 | ||
LV | 22.05.2013 | ||
MC | 22.05.2013 | ||
NL | 22.05.2013 | ||
PL | 22.05.2013 | ||
RO | 22.05.2013 | ||
SE | 22.05.2013 | ||
SI | 22.05.2013 | ||
SK | 22.05.2013 | ||
TR | 22.05.2013 | ||
BG | 22.08.2013 | ||
NO | 22.08.2013 | ||
GR | 23.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
IE | 01.12.2013 | ||
LU | 01.12.2013 | ||
CH | 31.12.2013 | ||
LI | 31.12.2013 | ||
Former [2015/32] | AT | 22.05.2013 | |
BE | 22.05.2013 | ||
CY | 22.05.2013 | ||
CZ | 22.05.2013 | ||
EE | 22.05.2013 | ||
FI | 22.05.2013 | ||
HR | 22.05.2013 | ||
IT | 22.05.2013 | ||
LT | 22.05.2013 | ||
LV | 22.05.2013 | ||
MC | 22.05.2013 | ||
NL | 22.05.2013 | ||
PL | 22.05.2013 | ||
RO | 22.05.2013 | ||
SE | 22.05.2013 | ||
SI | 22.05.2013 | ||
SK | 22.05.2013 | ||
TR | 22.05.2013 | ||
BG | 22.08.2013 | ||
NO | 22.08.2013 | ||
GR | 23.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
IE | 01.12.2013 | ||
LU | 01.12.2013 | ||
CH | 31.12.2013 | ||
LI | 31.12.2013 | ||
Former [2015/30] | AT | 22.05.2013 | |
BE | 22.05.2013 | ||
CY | 22.05.2013 | ||
CZ | 22.05.2013 | ||
EE | 22.05.2013 | ||
FI | 22.05.2013 | ||
HR | 22.05.2013 | ||
IT | 22.05.2013 | ||
LT | 22.05.2013 | ||
LV | 22.05.2013 | ||
MC | 22.05.2013 | ||
NL | 22.05.2013 | ||
PL | 22.05.2013 | ||
RO | 22.05.2013 | ||
SE | 22.05.2013 | ||
SI | 22.05.2013 | ||
SK | 22.05.2013 | ||
BG | 22.08.2013 | ||
NO | 22.08.2013 | ||
GR | 23.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
IE | 01.12.2013 | ||
LU | 01.12.2013 | ||
CH | 31.12.2013 | ||
LI | 31.12.2013 | ||
Former [2014/48] | AT | 22.05.2013 | |
BE | 22.05.2013 | ||
CZ | 22.05.2013 | ||
EE | 22.05.2013 | ||
FI | 22.05.2013 | ||
HR | 22.05.2013 | ||
IT | 22.05.2013 | ||
LT | 22.05.2013 | ||
LV | 22.05.2013 | ||
MC | 22.05.2013 | ||
NL | 22.05.2013 | ||
PL | 22.05.2013 | ||
RO | 22.05.2013 | ||
SE | 22.05.2013 | ||
SI | 22.05.2013 | ||
SK | 22.05.2013 | ||
BG | 22.08.2013 | ||
NO | 22.08.2013 | ||
GR | 23.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
IE | 01.12.2013 | ||
LU | 01.12.2013 | ||
CH | 31.12.2013 | ||
LI | 31.12.2013 | ||
Former [2014/46] | AT | 22.05.2013 | |
BE | 22.05.2013 | ||
CZ | 22.05.2013 | ||
EE | 22.05.2013 | ||
FI | 22.05.2013 | ||
HR | 22.05.2013 | ||
IT | 22.05.2013 | ||
LT | 22.05.2013 | ||
LV | 22.05.2013 | ||
MC | 22.05.2013 | ||
NL | 22.05.2013 | ||
PL | 22.05.2013 | ||
RO | 22.05.2013 | ||
SE | 22.05.2013 | ||
SI | 22.05.2013 | ||
SK | 22.05.2013 | ||
BG | 22.08.2013 | ||
NO | 22.08.2013 | ||
GR | 23.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
LU | 01.12.2013 | ||
CH | 31.12.2013 | ||
LI | 31.12.2013 | ||
Former [2014/38] | AT | 22.05.2013 | |
BE | 22.05.2013 | ||
CZ | 22.05.2013 | ||
EE | 22.05.2013 | ||
FI | 22.05.2013 | ||
HR | 22.05.2013 | ||
IT | 22.05.2013 | ||
LT | 22.05.2013 | ||
LV | 22.05.2013 | ||
MC | 22.05.2013 | ||
NL | 22.05.2013 | ||
PL | 22.05.2013 | ||
RO | 22.05.2013 | ||
SE | 22.05.2013 | ||
SI | 22.05.2013 | ||
SK | 22.05.2013 | ||
BG | 22.08.2013 | ||
NO | 22.08.2013 | ||
GR | 23.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
LU | 01.12.2013 | ||
Former [2014/14] | AT | 22.05.2013 | |
BE | 22.05.2013 | ||
CZ | 22.05.2013 | ||
EE | 22.05.2013 | ||
FI | 22.05.2013 | ||
HR | 22.05.2013 | ||
IT | 22.05.2013 | ||
LT | 22.05.2013 | ||
LV | 22.05.2013 | ||
NL | 22.05.2013 | ||
PL | 22.05.2013 | ||
RO | 22.05.2013 | ||
SE | 22.05.2013 | ||
SI | 22.05.2013 | ||
SK | 22.05.2013 | ||
BG | 22.08.2013 | ||
NO | 22.08.2013 | ||
GR | 23.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
Former [2014/11] | AT | 22.05.2013 | |
BE | 22.05.2013 | ||
CZ | 22.05.2013 | ||
EE | 22.05.2013 | ||
FI | 22.05.2013 | ||
HR | 22.05.2013 | ||
IT | 22.05.2013 | ||
LT | 22.05.2013 | ||
LV | 22.05.2013 | ||
PL | 22.05.2013 | ||
RO | 22.05.2013 | ||
SE | 22.05.2013 | ||
SI | 22.05.2013 | ||
SK | 22.05.2013 | ||
BG | 22.08.2013 | ||
NO | 22.08.2013 | ||
GR | 23.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
Former [2014/10] | AT | 22.05.2013 | |
BE | 22.05.2013 | ||
CZ | 22.05.2013 | ||
EE | 22.05.2013 | ||
FI | 22.05.2013 | ||
HR | 22.05.2013 | ||
LT | 22.05.2013 | ||
LV | 22.05.2013 | ||
PL | 22.05.2013 | ||
SE | 22.05.2013 | ||
SI | 22.05.2013 | ||
SK | 22.05.2013 | ||
BG | 22.08.2013 | ||
NO | 22.08.2013 | ||
GR | 23.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
Former [2014/06] | AT | 22.05.2013 | |
BE | 22.05.2013 | ||
FI | 22.05.2013 | ||
HR | 22.05.2013 | ||
LT | 22.05.2013 | ||
LV | 22.05.2013 | ||
PL | 22.05.2013 | ||
SE | 22.05.2013 | ||
SI | 22.05.2013 | ||
BG | 22.08.2013 | ||
NO | 22.08.2013 | ||
GR | 23.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
Former [2014/02] | AT | 22.05.2013 | |
FI | 22.05.2013 | ||
HR | 22.05.2013 | ||
LT | 22.05.2013 | ||
LV | 22.05.2013 | ||
PL | 22.05.2013 | ||
SE | 22.05.2013 | ||
SI | 22.05.2013 | ||
BG | 22.08.2013 | ||
NO | 22.08.2013 | ||
GR | 23.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
Former [2013/51] | AT | 22.05.2013 | |
FI | 22.05.2013 | ||
HR | 22.05.2013 | ||
LT | 22.05.2013 | ||
PL | 22.05.2013 | ||
SE | 22.05.2013 | ||
SI | 22.05.2013 | ||
BG | 22.08.2013 | ||
NO | 22.08.2013 | ||
GR | 23.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
Former [2013/50] | AT | 22.05.2013 | |
FI | 22.05.2013 | ||
LT | 22.05.2013 | ||
PL | 22.05.2013 | ||
SE | 22.05.2013 | ||
SI | 22.05.2013 | ||
BG | 22.08.2013 | ||
NO | 22.08.2013 | ||
GR | 23.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
Former [2013/49] | AT | 22.05.2013 | |
FI | 22.05.2013 | ||
LT | 22.05.2013 | ||
SE | 22.05.2013 | ||
SI | 22.05.2013 | ||
NO | 22.08.2013 | ||
GR | 23.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
Former [2013/48] | AT | 22.05.2013 | |
LT | 22.05.2013 | ||
NO | 22.08.2013 | ||
ES | 02.09.2013 | ||
IS | 22.09.2013 | ||
PT | 23.09.2013 | ||
Former [2013/47] | LT | 22.05.2013 | |
NO | 22.08.2013 | ||
PT | 23.09.2013 | Cited in | International search | [X]EP1634998 (MAIERFORM MARITIME TECHNOLOGY [DE]) [X] 9,17 * the whole document *; | [A]GB2434823 (ENGINEERING BUSINESS LTD [GB]) [A] 1,17 * abstract *; | [A]JPH06257555 (ISHIKAWAJIMA HARIMA HEAVY IND) [A] 1 * abstract *; | [A]WO03100178 (VESTAS WIND SYS AS [DK], et al) [A] 1,17 * abstract *; | [A]WO2007097640 (JAHR ODD [NO]) [A] 1 * abstract * | by applicant | EP1634998 | GB2434823 |