EP2235461 - DEVICE AND METHOD FOR OBTAINING METALS OR METAL COMPOUNDS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.04.2018 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 28.04.2017 | ||
Former | Grant of patent is intended Status updated on 20.12.2016 | Most recent event Tooltip | 29.05.2020 | Lapse of the patent in a contracting state New state(s): PT | published on 01.07.2020 [2020/27] | Applicant(s) | For all designated states SMS group GmbH Eduard-Schloemann-Strasse 4 40237 Düsseldorf / DE | [2015/31] |
Former [2010/40] | For all designated states SMS Siemag AG Eduard-Schloemann-Strasse 4 40237 Düsseldorf / DE | Inventor(s) | 01 /
DEGEL, Rolf Im Laar 2 40878 Ratingen / DE | 02 /
OTERDOOM, Harmen, Johannes Konkordiastrasse 103 40219 Düsseldorf / DE | 03 /
KUNZE, Jürgen Ulmenweg 13 46509 Xanten / DE | [2010/40] | Representative(s) | Klüppel, Walter Hemmerich & Kollegen Patentanwälte Hammerstraße 2 57072 Siegen / DE | [2017/22] |
Former [2010/40] | Klüppel, Walter Hemmerich & Kollegen Patentanwälte Hammerstraße 2 57072 Siegen / DE | Application number, filing date | 08862095.0 | 11.12.2008 | [2010/40] | WO2008EP10490 | Priority number, date | DE20071061025 | 18.12.2007 Original published format: DE102007061025 | DE20081021886 | 02.05.2008 Original published format: DE102008021886 | [2010/40] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2009077114 | Date: | 25.06.2009 | Language: | DE | [2009/26] | Type: | A1 Application with search report | No.: | EP2235461 | Date: | 06.10.2010 | Language: | DE | The application published by WIPO in one of the EPO official languages on 25.06.2009 takes the place of the publication of the European patent application. | [2010/40] | Type: | B1 Patent specification | No.: | EP2235461 | Date: | 31.05.2017 | Language: | DE | [2017/22] | Search report(s) | International search report - published on: | EP | 25.06.2009 | Classification | IPC: | F27B3/08, C21C5/52 | [2010/40] | CPC: |
C21C5/5229 (EP);
C21C5/5247 (EP);
C21C5/5252 (EP);
F27B3/085 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2017/22] |
Former [2010/40] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | VORRICHTUNG UND VERFAHREN ZUR GEWINNUNG VON METALLEN ODER METALLVERBINDUNGEN | [2010/40] | English: | DEVICE AND METHOD FOR OBTAINING METALS OR METAL COMPOUNDS | [2010/40] | French: | DISPOSITIF ET PROCÉDÉ POUR RÉCUPÉRER DES MÉTAUX OU DES COMPOSÉS MÉTALLIQUES | [2010/40] | Entry into regional phase | 19.07.2010 | National basic fee paid | 19.07.2010 | Designation fee(s) paid | 19.07.2010 | Examination fee paid | Examination procedure | 17.04.2009 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 19.07.2010 | Examination requested [2010/40] | 25.08.2010 | Amendment by applicant (claims and/or description) | 21.12.2016 | Communication of intention to grant the patent | 12.04.2017 | Fee for grant paid | 12.04.2017 | Fee for publishing/printing paid | 12.04.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 21.12.2016 | Opposition(s) | 01.03.2018 | No opposition filed within time limit [2018/19] | Fees paid | Renewal fee | 03.01.2011 | Renewal fee patent year 03 | 02.01.2012 | Renewal fee patent year 04 | 02.01.2013 | Renewal fee patent year 05 | 02.01.2014 | Renewal fee patent year 06 | 05.01.2015 | Renewal fee patent year 07 | 04.01.2016 | Renewal fee patent year 08 | 02.01.2017 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.12.2008 | CY | 31.05.2017 | CZ | 31.05.2017 | DK | 31.05.2017 | EE | 31.05.2017 | ES | 31.05.2017 | FI | 31.05.2017 | HR | 31.05.2017 | IT | 31.05.2017 | LT | 31.05.2017 | LV | 31.05.2017 | MC | 31.05.2017 | MT | 31.05.2017 | NL | 31.05.2017 | PL | 31.05.2017 | PT | 31.05.2017 | RO | 31.05.2017 | SE | 31.05.2017 | SI | 31.05.2017 | SK | 31.05.2017 | TR | 31.05.2017 | BG | 31.08.2017 | NO | 31.08.2017 | GR | 01.09.2017 | IS | 30.09.2017 | AT | 11.12.2017 | GB | 11.12.2017 | IE | 11.12.2017 | LU | 11.12.2017 | BE | 31.12.2017 | CH | 31.12.2017 | LI | 31.12.2017 | FR | 02.01.2018 | [2020/27] |
Former [2020/15] | HU | 11.12.2008 | |
CY | 31.05.2017 | ||
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MC | 31.05.2017 | ||
MT | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
TR | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
AT | 11.12.2017 | ||
GB | 11.12.2017 | ||
IE | 11.12.2017 | ||
LU | 11.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
FR | 02.01.2018 | ||
Former [2019/46] | HU | 11.12.2008 | |
CY | 31.05.2017 | ||
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MC | 31.05.2017 | ||
MT | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
AT | 11.12.2017 | ||
GB | 11.12.2017 | ||
IE | 11.12.2017 | ||
LU | 11.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
FR | 02.01.2018 | ||
Former [2019/31] | HU | 11.12.2008 | |
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MC | 31.05.2017 | ||
MT | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
AT | 11.12.2017 | ||
GB | 11.12.2017 | ||
IE | 11.12.2017 | ||
LU | 11.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
FR | 02.01.2018 | ||
Former [2019/30] | CZ | 31.05.2017 | |
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MC | 31.05.2017 | ||
MT | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
AT | 11.12.2017 | ||
GB | 11.12.2017 | ||
IE | 11.12.2017 | ||
LU | 11.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
FR | 02.01.2018 | ||
Former [2019/23] | CZ | 31.05.2017 | |
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MT | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
AT | 11.12.2017 | ||
GB | 11.12.2017 | ||
IE | 11.12.2017 | ||
LU | 11.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
FR | 02.01.2018 | ||
Former [2018/52] | CZ | 31.05.2017 | |
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MT | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
GB | 11.12.2017 | ||
IE | 11.12.2017 | ||
LU | 11.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
FR | 02.01.2018 | ||
Former [2018/50] | CZ | 31.05.2017 | |
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MT | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
GB | 11.12.2017 | ||
IE | 11.12.2017 | ||
LU | 11.12.2017 | ||
BE | 31.12.2017 | ||
FR | 02.01.2018 | ||
Former [2018/49] | CZ | 31.05.2017 | |
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MT | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
IE | 11.12.2017 | ||
LU | 11.12.2017 | ||
BE | 31.12.2017 | ||
FR | 02.01.2018 | ||
Former [2018/45] | CZ | 31.05.2017 | |
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MT | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
IE | 11.12.2017 | ||
LU | 11.12.2017 | ||
Former [2018/43] | CZ | 31.05.2017 | |
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MT | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
LU | 11.12.2017 | ||
Former [2018/25] | CZ | 31.05.2017 | |
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2018/11] | CZ | 31.05.2017 | |
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SK | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2018/10] | CZ | 31.05.2017 | |
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SK | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2018/09] | DK | 31.05.2017 | |
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
SE | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2017/52] | ES | 31.05.2017 | |
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
SE | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2017/50] | ES | 31.05.2017 | |
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
SE | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2017/49] | ES | 31.05.2017 | |
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | Cited in | International search | [X]JPS53146202 (KAWASAKI HEAVY IND LTD) [X] 1-8,10-13,15 * abstract * * figure 1 *; | [A]EP0633441 (ABB RESEARCH LTD [CH]) [A] 1-15* abstract *; | [XD]EP0714860 (VON ROLL UMWELTTECHNIK AG [CH], et al) [XD] 1-8,10-13,15 * abstract * * figure 1 * * column 3, line 51 - column 5, line 37 *; | [X]EP1375628 (INTEGRATED ENVIRONMENTAL TECHN [US]) [X] 1-15 * abstract * * paragraph [0064] * * paragraph [0290] * * figure 1 * |