EP2346799 - METATHESIS UNIT PRETREATMENT PROCESS WITH FORMATION OF OCTENE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.06.2015 Database last updated on 10.07.2024 | Most recent event Tooltip | 15.07.2016 | Lapse of the patent in a contracting state New state(s): MT | published on 17.08.2016 [2016/33] | Applicant(s) | For all designated states UOP LLC 25 East Algonquin Road P.O. Box 5017 Des Plaines, Illinois 60017-5017 / US | [2011/30] | Inventor(s) | 01 /
KRUPA, Steven L. UOP LLC 25 East Algonquin Road P. O. Box 5017 Des Plaines, Illinois 60017-5017 / US | 02 /
MEISTER, Jill M. UOP LLC 25 East Algonquin Road P. O. Box 5017 Des Plaines, Illinois 60017-5017 / US | [2014/34] |
Former [2011/30] | 01 /
KRUPA, Steven L. UOP LLC 25 East Algonquin Road P. O. Box 5017 Des Plaines, Illinois 60017-5017 / US | ||
02 /
MEISTER, Jill M. UOP LLC 25 East Algonquin Road P. O. Box 5017 Des Plaines, Illinois 60017-5017 / US | Representative(s) | Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | [N/P] |
Former [2014/02] | Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | ||
Former [2012/12] | Hayes, Adrian Chetwynd, et al Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | ||
Former [2011/30] | Hayes, Adrian Chetwynd, et al Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | Application number, filing date | 08878190.1 | 17.11.2008 | [2011/30] | WO2008US83773 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010056257 | Date: | 20.05.2010 | Language: | EN | [2010/20] | Type: | A1 Application with search report | No.: | EP2346799 | Date: | 27.07.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.05.2010 takes the place of the publication of the European patent application. | [2011/30] | Type: | B1 Patent specification | No.: | EP2346799 | Date: | 20.08.2014 | Language: | EN | [2014/34] | Search report(s) | International search report - published on: | KR | 20.05.2010 | (Supplementary) European search report - dispatched on: | EP | 04.05.2012 | Classification | IPC: | C07C6/04, C07C2/14, C07C5/25, C07C7/163, C07C11/06 | [2012/22] | CPC: |
C07C5/2506 (EP,US);
C07C6/04 (EP,KR,US);
C07B63/00 (KR);
C07C11/02 (EP,KR,US);
C07C11/06 (EP,US);
C07C2/08 (EP,US);
C07C2/14 (EP,US);
C07C7/04 (KR);
C07C7/163 (EP,US);
| C-Set: |
C07C2/08, C07C11/02 (EP,US);
C07C5/2506, C07C11/08 (US,EP);
C07C6/04, C07C11/06 (US,EP);
C07C7/163, C07C11/08 (US,EP) |
Former IPC [2011/30] | C07C6/04 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2011/30] | Extension states | AL | Not yet paid | BA | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | METATHESEEINHEITSVORBEHANDLUNGSVERFAHREN MIT BILDUNG VON OCTEN | [2011/30] | English: | METATHESIS UNIT PRETREATMENT PROCESS WITH FORMATION OF OCTENE | [2011/30] | French: | PROCÉDÉ DE PRÉTRAITEMENT D'UNITÉ DE MÉTATHÈSE AVEC FORMATION D'OCTÈNE | [2011/30] | Entry into regional phase | 05.05.2011 | National basic fee paid | 05.05.2011 | Search fee paid | 05.05.2011 | Designation fee(s) paid | 05.05.2011 | Examination fee paid | Examination procedure | 05.05.2011 | Examination requested [2011/30] | 08.11.2012 | Amendment by applicant (claims and/or description) | 24.01.2013 | Despatch of a communication from the examining division (Time limit: M04) | 06.02.2013 | Reply to a communication from the examining division | 21.11.2013 | Despatch of a communication from the examining division (Time limit: M04) | 04.12.2013 | Reply to a communication from the examining division | 10.03.2014 | Communication of intention to grant the patent | 09.07.2014 | Fee for grant paid | 09.07.2014 | Fee for publishing/printing paid | 09.07.2014 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 24.01.2013 | Opposition(s) | 21.05.2015 | No opposition filed within time limit [2015/31] | Fees paid | Renewal fee | 05.05.2011 | Renewal fee patent year 03 | 07.11.2011 | Renewal fee patent year 04 | 07.11.2012 | Renewal fee patent year 05 | 07.11.2013 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.11.2008 | AT | 20.08.2014 | BE | 20.08.2014 | CY | 20.08.2014 | CZ | 20.08.2014 | DK | 20.08.2014 | EE | 20.08.2014 | FI | 20.08.2014 | HR | 20.08.2014 | LT | 20.08.2014 | LV | 20.08.2014 | MC | 20.08.2014 | MT | 20.08.2014 | PL | 20.08.2014 | RO | 20.08.2014 | SE | 20.08.2014 | SI | 20.08.2014 | SK | 20.08.2014 | TR | 20.08.2014 | IE | 17.11.2014 | LU | 17.11.2014 | BG | 20.11.2014 | NO | 20.11.2014 | GR | 21.11.2014 | CH | 30.11.2014 | LI | 30.11.2014 | IS | 20.12.2014 | PT | 22.12.2014 | [2016/33] |
Former [2016/32] | HU | 17.11.2008 | |
AT | 20.08.2014 | ||
BE | 20.08.2014 | ||
CY | 20.08.2014 | ||
CZ | 20.08.2014 | ||
DK | 20.08.2014 | ||
EE | 20.08.2014 | ||
FI | 20.08.2014 | ||
HR | 20.08.2014 | ||
LT | 20.08.2014 | ||
LV | 20.08.2014 | ||
MC | 20.08.2014 | ||
PL | 20.08.2014 | ||
RO | 20.08.2014 | ||
SE | 20.08.2014 | ||
SI | 20.08.2014 | ||
SK | 20.08.2014 | ||
TR | 20.08.2014 | ||
IE | 17.11.2014 | ||
LU | 17.11.2014 | ||
BG | 20.11.2014 | ||
NO | 20.11.2014 | ||
GR | 21.11.2014 | ||
CH | 30.11.2014 | ||
LI | 30.11.2014 | ||
IS | 20.12.2014 | ||
PT | 22.12.2014 | ||
Former [2016/31] | AT | 20.08.2014 | |
CY | 20.08.2014 | ||
CZ | 20.08.2014 | ||
DK | 20.08.2014 | ||
EE | 20.08.2014 | ||
FI | 20.08.2014 | ||
HR | 20.08.2014 | ||
LT | 20.08.2014 | ||
LV | 20.08.2014 | ||
MC | 20.08.2014 | ||
PL | 20.08.2014 | ||
RO | 20.08.2014 | ||
SE | 20.08.2014 | ||
SI | 20.08.2014 | ||
SK | 20.08.2014 | ||
IE | 17.11.2014 | ||
LU | 17.11.2014 | ||
BG | 20.11.2014 | ||
NO | 20.11.2014 | ||
GR | 21.11.2014 | ||
BE | 30.11.2014 | ||
CH | 30.11.2014 | ||
LI | 30.11.2014 | ||
IS | 20.12.2014 | ||
PT | 22.12.2014 | ||
Former [2015/50] | AT | 20.08.2014 | |
CZ | 20.08.2014 | ||
DK | 20.08.2014 | ||
EE | 20.08.2014 | ||
FI | 20.08.2014 | ||
HR | 20.08.2014 | ||
LT | 20.08.2014 | ||
LV | 20.08.2014 | ||
MC | 20.08.2014 | ||
PL | 20.08.2014 | ||
RO | 20.08.2014 | ||
SE | 20.08.2014 | ||
SI | 20.08.2014 | ||
SK | 20.08.2014 | ||
IE | 17.11.2014 | ||
LU | 17.11.2014 | ||
BG | 20.11.2014 | ||
NO | 20.11.2014 | ||
GR | 21.11.2014 | ||
BE | 30.11.2014 | ||
CH | 30.11.2014 | ||
LI | 30.11.2014 | ||
IS | 20.12.2014 | ||
PT | 22.12.2014 | ||
Former [2015/46] | AT | 20.08.2014 | |
CZ | 20.08.2014 | ||
DK | 20.08.2014 | ||
EE | 20.08.2014 | ||
FI | 20.08.2014 | ||
HR | 20.08.2014 | ||
LT | 20.08.2014 | ||
LV | 20.08.2014 | ||
MC | 20.08.2014 | ||
PL | 20.08.2014 | ||
RO | 20.08.2014 | ||
SE | 20.08.2014 | ||
SK | 20.08.2014 | ||
IE | 17.11.2014 | ||
LU | 17.11.2014 | ||
BG | 20.11.2014 | ||
NO | 20.11.2014 | ||
GR | 21.11.2014 | ||
BE | 30.11.2014 | ||
CH | 30.11.2014 | ||
LI | 30.11.2014 | ||
IS | 20.12.2014 | ||
PT | 22.12.2014 | ||
Former [2015/33] | AT | 20.08.2014 | |
CZ | 20.08.2014 | ||
DK | 20.08.2014 | ||
EE | 20.08.2014 | ||
FI | 20.08.2014 | ||
HR | 20.08.2014 | ||
LT | 20.08.2014 | ||
LV | 20.08.2014 | ||
MC | 20.08.2014 | ||
PL | 20.08.2014 | ||
RO | 20.08.2014 | ||
SE | 20.08.2014 | ||
SK | 20.08.2014 | ||
LU | 17.11.2014 | ||
BG | 20.11.2014 | ||
NO | 20.11.2014 | ||
GR | 21.11.2014 | ||
BE | 30.11.2014 | ||
CH | 30.11.2014 | ||
LI | 30.11.2014 | ||
IS | 20.12.2014 | ||
PT | 22.12.2014 | ||
Former [2015/32] | AT | 20.08.2014 | |
CZ | 20.08.2014 | ||
DK | 20.08.2014 | ||
EE | 20.08.2014 | ||
FI | 20.08.2014 | ||
HR | 20.08.2014 | ||
LT | 20.08.2014 | ||
LV | 20.08.2014 | ||
MC | 20.08.2014 | ||
PL | 20.08.2014 | ||
RO | 20.08.2014 | ||
SE | 20.08.2014 | ||
SK | 20.08.2014 | ||
LU | 17.11.2014 | ||
BG | 20.11.2014 | ||
NO | 20.11.2014 | ||
GR | 21.11.2014 | ||
BE | 30.11.2014 | ||
IS | 20.12.2014 | ||
PT | 22.12.2014 | ||
Former [2015/30] | AT | 20.08.2014 | |
CZ | 20.08.2014 | ||
DK | 20.08.2014 | ||
EE | 20.08.2014 | ||
FI | 20.08.2014 | ||
HR | 20.08.2014 | ||
LT | 20.08.2014 | ||
LV | 20.08.2014 | ||
PL | 20.08.2014 | ||
RO | 20.08.2014 | ||
SE | 20.08.2014 | ||
SK | 20.08.2014 | ||
LU | 17.11.2014 | ||
BG | 20.11.2014 | ||
NO | 20.11.2014 | ||
GR | 21.11.2014 | ||
BE | 30.11.2014 | ||
IS | 20.12.2014 | ||
PT | 22.12.2014 | ||
Former [2015/24] | AT | 20.08.2014 | |
CZ | 20.08.2014 | ||
DK | 20.08.2014 | ||
EE | 20.08.2014 | ||
FI | 20.08.2014 | ||
HR | 20.08.2014 | ||
LT | 20.08.2014 | ||
LV | 20.08.2014 | ||
PL | 20.08.2014 | ||
RO | 20.08.2014 | ||
SE | 20.08.2014 | ||
SK | 20.08.2014 | ||
BG | 20.11.2014 | ||
NO | 20.11.2014 | ||
GR | 21.11.2014 | ||
IS | 20.12.2014 | ||
PT | 22.12.2014 | ||
Former [2015/23] | AT | 20.08.2014 | |
CZ | 20.08.2014 | ||
DK | 20.08.2014 | ||
EE | 20.08.2014 | ||
FI | 20.08.2014 | ||
HR | 20.08.2014 | ||
LT | 20.08.2014 | ||
LV | 20.08.2014 | ||
RO | 20.08.2014 | ||
SE | 20.08.2014 | ||
SK | 20.08.2014 | ||
BG | 20.11.2014 | ||
NO | 20.11.2014 | ||
GR | 21.11.2014 | ||
IS | 20.12.2014 | ||
PT | 22.12.2014 | ||
Former [2015/22] | AT | 20.08.2014 | |
DK | 20.08.2014 | ||
FI | 20.08.2014 | ||
HR | 20.08.2014 | ||
LT | 20.08.2014 | ||
LV | 20.08.2014 | ||
RO | 20.08.2014 | ||
SE | 20.08.2014 | ||
BG | 20.11.2014 | ||
NO | 20.11.2014 | ||
GR | 21.11.2014 | ||
IS | 20.12.2014 | ||
PT | 22.12.2014 | ||
Former [2015/12] | AT | 20.08.2014 | |
FI | 20.08.2014 | ||
HR | 20.08.2014 | ||
LT | 20.08.2014 | ||
LV | 20.08.2014 | ||
SE | 20.08.2014 | ||
BG | 20.11.2014 | ||
NO | 20.11.2014 | ||
GR | 21.11.2014 | ||
IS | 20.12.2014 | ||
PT | 22.12.2014 | ||
Former [2015/11] | FI | 20.08.2014 | |
LT | 20.08.2014 | ||
SE | 20.08.2014 | ||
BG | 20.11.2014 | ||
NO | 20.11.2014 | ||
GR | 21.11.2014 | ||
PT | 22.12.2014 | ||
Former [2015/10] | FI | 20.08.2014 | |
LT | 20.08.2014 | ||
SE | 20.08.2014 | ||
BG | 20.11.2014 | ||
NO | 20.11.2014 | ||
Former [2015/09] | FI | 20.08.2014 | |
LT | 20.08.2014 | ||
SE | 20.08.2014 | ||
Former [2015/08] | LT | 20.08.2014 | Documents cited: | Search | [A]US2006122444 (PETERS UDO [DE], et al) [A] 1-10 * pages 8-9, paragraph 0137 * * pages 9-10; examples 1, 3, 4 *; | [A]US2006235253 (GARTSIDE ROBERT J [US], et al) [A] 1-10 * claim 1 * * page 5, paragraphs 47-50 ** figure 3 * | International search | [A]US2004267067 (BRIDGES ROBERT S [US], et al); | [A]US2005124839 (GARTSIDE ROBERT J [US], et al); | [A]US2006161033 (CHODORGE JEAN-ALAIN [FR], et al); | [A]US7262332 (DUPLAN JEAN-LUC [FR], et al); | [E]US7459593 (KRUPA STEVEN L [US], et al) | by applicant | US5877372 | US6689927 | US2005124839 |