Extract from the Register of European Patents

EP About this file: EP2090395

EP2090395 - Device and method for manufacturing metallic material compounds and compound semi-finished products [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.08.2017
Database last updated on 26.03.2026
Most recent event   Tooltip06.03.2020Lapse of the patent in a contracting state
New state(s): TR
published on 08.04.2020  [2020/15]
Applicant(s)For all designated states
Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V.
Hansastrasse 27c
80686 München / DE
For all designated states
MEC Lasertec AG
Hauptstrasse 150
5733 Leimbach / CH
[N/P]
Former [2012/10]For all designated states
Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V.
Hansastrasse 27c
80686 München / DE
For all designated states
MEC Lasertec AG
Hauptstrasse 150
5733 Leimbach / CH
Former [2009/51]For all designated states
Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V.
Hansastrasse 27c
80686 München / DE
Former [2009/34]For all designated states
Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V.
Hansastrasse 27c
80686 München / DE
Inventor(s)01 / Brenner, Berndt
Ahornweg 24
01328 Dresden / DE
02 / Fux, Volker
Birkwitzer Mittelweg 4
01796 Pirna / DE
03 / Merz, Karl
Höhenweg 14
5734 Reinach / CH
 [2011/50]
Former [2009/34]01 / Brenner, Berndt
Ahornweg 24
01328 Dresden / DE
02 / Fux, Volker
Birkwitzer Mittelweg 4
01796 Pirna / DE
Application number, filing date09002003.313.02.2009
[2009/34]
Priority number, dateDE2008100883313.02.2008         Original published format: DE102008008833
DE2008103643505.08.2008         Original published format: DE102008036435
[2009/34]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP2090395
Date:19.08.2009
Language:DE
[2009/34]
Type: A3 Search report 
No.:EP2090395
Date:06.10.2010
[2010/40]
Type: B1 Patent specification 
No.:EP2090395
Date:28.09.2016
Language:DE
[2016/39]
Search report(s)(Supplementary) European search report - dispatched on:EP02.09.2010
ClassificationIPC:B23K20/04, B23K26/24, B23K13/01, B32B15/01
[2009/34]
CPC:
B23K20/04 (EP); B23K13/015 (EP); B23K26/0846 (EP);
B23K26/244 (EP); B32B15/01 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2016/39]
Former [2009/34]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Verfahren und Vorrichtung zum Herstellen von metallischen Werkstoffverbunden und Verbund-Halbzeugen[2009/34]
English:Device and method for manufacturing metallic material compounds and compound semi-finished products[2009/34]
French:Procédé et dispositif de fabrication de composites de matière active métalliques et produits semi-finis composites[2009/34]
Examination procedure01.04.2011Examination requested  [2011/20]
13.05.2011Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time
12.07.2011Amendment by applicant (claims and/or description)
05.06.2015Despatch of a communication from the examining division (Time limit: M04)
02.10.2015Reply to a communication from the examining division
13.04.2016Communication of intention to grant the patent
11.08.2016Fee for grant paid
11.08.2016Fee for publishing/printing paid
11.08.2016Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  05.06.2015
Opposition(s)29.06.2017No opposition filed within time limit [2017/36]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
12.07.2011Request for further processing filed
12.07.2011Full payment received (date of receipt of payment)
Request granted
28.07.2011Decision despatched
Fees paidRenewal fee
24.02.2011Renewal fee patent year 03
28.02.2012Renewal fee patent year 04
27.02.2013Renewal fee patent year 05
27.02.2014Renewal fee patent year 06
26.02.2015Renewal fee patent year 07
26.02.2016Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.02.2009
CY28.09.2016
CZ28.09.2016
DK28.09.2016
EE28.09.2016
ES28.09.2016
FI28.09.2016
HR28.09.2016
IT28.09.2016
LT28.09.2016
LV28.09.2016
MC28.09.2016
MK28.09.2016
MT28.09.2016
NL28.09.2016
PL28.09.2016
RO28.09.2016
SE28.09.2016
SK28.09.2016
TR28.09.2016
BG28.12.2016
NO28.12.2016
GR29.12.2016
IS28.01.2017
PT30.01.2017
GB13.02.2017
IE13.02.2017
LU13.02.2017
BE28.02.2017
[2020/15]
Former [2019/52]HU13.02.2009
CY28.09.2016
CZ28.09.2016
DK28.09.2016
EE28.09.2016
ES28.09.2016
FI28.09.2016
HR28.09.2016
IT28.09.2016
LT28.09.2016
LV28.09.2016
MC28.09.2016
MK28.09.2016
MT28.09.2016
NL28.09.2016
PL28.09.2016
RO28.09.2016
SE28.09.2016
SK28.09.2016
BG28.12.2016
NO28.12.2016
GR29.12.2016
IS28.01.2017
PT30.01.2017
GB13.02.2017
IE13.02.2017
LU13.02.2017
BE28.02.2017
Former [2019/46]HU13.02.2009
CY28.09.2016
CZ28.09.2016
DK28.09.2016
EE28.09.2016
ES28.09.2016
FI28.09.2016
HR28.09.2016
IT28.09.2016
LT28.09.2016
LV28.09.2016
MC28.09.2016
MT28.09.2016
NL28.09.2016
PL28.09.2016
RO28.09.2016
SE28.09.2016
SK28.09.2016
BG28.12.2016
NO28.12.2016
GR29.12.2016
IS28.01.2017
PT30.01.2017
GB13.02.2017
IE13.02.2017
LU13.02.2017
BE28.02.2017
Former [2019/31]HU13.02.2009
CZ28.09.2016
DK28.09.2016
EE28.09.2016
ES28.09.2016
FI28.09.2016
HR28.09.2016
IT28.09.2016
LT28.09.2016
LV28.09.2016
MC28.09.2016
MT28.09.2016
NL28.09.2016
PL28.09.2016
RO28.09.2016
SE28.09.2016
SK28.09.2016
BG28.12.2016
NO28.12.2016
GR29.12.2016
IS28.01.2017
PT30.01.2017
GB13.02.2017
IE13.02.2017
LU13.02.2017
BE28.02.2017
Former [2018/43]CZ28.09.2016
DK28.09.2016
EE28.09.2016
ES28.09.2016
FI28.09.2016
HR28.09.2016
IT28.09.2016
LT28.09.2016
LV28.09.2016
MC28.09.2016
MT28.09.2016
NL28.09.2016
PL28.09.2016
RO28.09.2016
SE28.09.2016
SK28.09.2016
BG28.12.2016
NO28.12.2016
GR29.12.2016
IS28.01.2017
PT30.01.2017
GB13.02.2017
IE13.02.2017
LU13.02.2017
BE28.02.2017
Former [2018/13]CZ28.09.2016
DK28.09.2016
EE28.09.2016
ES28.09.2016
FI28.09.2016
HR28.09.2016
IT28.09.2016
LT28.09.2016
LV28.09.2016
MC28.09.2016
NL28.09.2016
PL28.09.2016
RO28.09.2016
SE28.09.2016
SK28.09.2016
BG28.12.2016
NO28.12.2016
GR29.12.2016
IS28.01.2017
PT30.01.2017
GB13.02.2017
IE13.02.2017
LU13.02.2017
BE28.02.2017
Former [2018/04]CZ28.09.2016
DK28.09.2016
EE28.09.2016
ES28.09.2016
FI28.09.2016
HR28.09.2016
IT28.09.2016
LT28.09.2016
LV28.09.2016
MC28.09.2016
NL28.09.2016
PL28.09.2016
RO28.09.2016
SE28.09.2016
SK28.09.2016
BG28.12.2016
NO28.12.2016
GR29.12.2016
IS28.01.2017
PT30.01.2017
LU13.02.2017
BE28.02.2017
Former [2017/42]CZ28.09.2016
DK28.09.2016
EE28.09.2016
ES28.09.2016
FI28.09.2016
HR28.09.2016
IT28.09.2016
LT28.09.2016
LV28.09.2016
MC28.09.2016
NL28.09.2016
PL28.09.2016
RO28.09.2016
SE28.09.2016
SK28.09.2016
BG28.12.2016
NO28.12.2016
GR29.12.2016
IS28.01.2017
PT30.01.2017
BE28.02.2017
Former [2017/34]CZ28.09.2016
DK28.09.2016
EE28.09.2016
ES28.09.2016
FI28.09.2016
HR28.09.2016
IT28.09.2016
LT28.09.2016
LV28.09.2016
NL28.09.2016
PL28.09.2016
RO28.09.2016
SE28.09.2016
SK28.09.2016
BG28.12.2016
NO28.12.2016
GR29.12.2016
IS28.01.2017
PT30.01.2017
BE28.02.2017
Former [2017/32]CZ28.09.2016
EE28.09.2016
ES28.09.2016
FI28.09.2016
HR28.09.2016
IT28.09.2016
LT28.09.2016
LV28.09.2016
NL28.09.2016
PL28.09.2016
RO28.09.2016
SE28.09.2016
SK28.09.2016
BG28.12.2016
NO28.12.2016
GR29.12.2016
IS28.01.2017
PT30.01.2017
BE28.02.2017
Former [2017/13]FI28.09.2016
HR28.09.2016
LT28.09.2016
LV28.09.2016
NL28.09.2016
SE28.09.2016
NO28.12.2016
GR29.12.2016
Former [2017/11]FI28.09.2016
HR28.09.2016
LT28.09.2016
SE28.09.2016
NO28.12.2016
GR29.12.2016
Former [2017/10]FI28.09.2016
HR28.09.2016
LT28.09.2016
SE28.09.2016
NO28.12.2016
Former [2017/09]FI28.09.2016
LT28.09.2016
NO28.12.2016
Former [2017/07]LT28.09.2016
Documents cited:Search[IY] EP0739678  (NIPPON KOKAN KK et al.)
 [Y] DE19502140  (THYSSEN STAHL AG et al.)
 [A] EP1127651  (GEN ELECTRIC et al.)
 [A] US4803334  (BURKE MICHAEL A et al.)
 [A] EP1285719  (FRAUNHOFER GES FORSCHUNG et al.)
by applicantDE3713975
 DE19502140
 DE4429913
 WO02100588
   ALUMINIUM, vol. 56, no. 2, pages 147 - 149
   JRGEN HIRSCH: "Walzen von Flachprodukten", 2001, WILEY-VCH, pages: 15
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.