blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2101015

EP2101015 - Method for manufacturing a wall of a construction structure [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  27.02.2015
Database last updated on 02.09.2024
Most recent event   Tooltip27.02.2015Application deemed to be withdrawnpublished on 01.04.2015  [2015/14]
Applicant(s)For all designated states
RUND-STAHL-BAU GESELLSCHAFT M.B.H.
RSB-Haus Schilfweg 1
6972 Fussach / AT
[2009/38]
Inventor(s)01 / Mathis, Hugo, Mag. Dipl.-Ing.
Im Rebgärtle 1
6900 Bregenz / AT
 [2009/38]
Representative(s)Hofmann, Ralf U., et al
Hofmann & Fechner
Patentanwälte
Hörnlingerstrasse 3
Postfach 5
6830 Rankweil / AT
[N/P]
Former [2009/38]Hofmann, Ralf U., et al
Hefel & Hofmann Patentanwälte Egelseestrasse 65a Postfach 61
6806 Feldkirch / AT
Application number, filing date09003091.704.03.2009
[2009/38]
Priority number, dateAT2008000039312.03.2008         Original published format: AT 3932008
AT2008000039412.03.2008         Original published format: AT 3942008
[2009/38]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP2101015
Date:16.09.2009
Language:DE
[2009/38]
Type: A3 Search report 
No.:EP2101015
Date:11.06.2014
Language:DE
[2014/24]
Search report(s)(Supplementary) European search report - dispatched on:EP09.05.2014
ClassificationIPC:E04G11/04
[2009/38]
CPC:
E04G11/04 (EP); E04G11/28 (EP)
Designated contracting states(deleted) [2015/08]
Former [2009/38]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Verfahren zur Herstellung einer Wand eines Bauwerks[2009/38]
English:Method for manufacturing a wall of a construction structure[2009/38]
French:Procédé de fabrication d'un mur de construction[2009/38]
Examination procedure01.10.2014Application deemed to be withdrawn, date of legal effect  [2015/14]
29.10.2014Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2015/14]
Fees paidRenewal fee
24.03.2011Renewal fee patent year 03
15.03.2012Renewal fee patent year 04
19.03.2013Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
31.03.201406   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XDAY]AT346060B  (HEINZLE OTTO) [XD] 1,4,7 * the whole document * [A] 12-15 [Y] 1-3,5,6,8,9,11;
 [YDA]WO2008019408  (RUND STAHL BAU GMBH & CO [AT], et al) [YD] 1,5,6,8,9,11 * the whole document * [A] 2,3,7,10,12-15;
 [Y]DE1932517  (SIEMENS BAUUNION GMBH) [Y] 2,3 * page 4, paragraph 1 - page 7, paragraph 1; figure -; claim 5 *;
 [A]EP0350525  (GLEITBAU GES MIT BESCHRANKTER [AT]) [A] 1 * column 2, lines 10-35 * * column 4, line 1 - column 5, line 41 * * column 9, lines 5-35 * * figure - *;
 [A]CH360196  (ALUMINIUM IND AG [CH]) [A] 1-15 * the whole document *;
 [AD]DE2733628  (DYCKERHOFF & WIDMANN AG) [AD] 1-15 * the whole document *
by applicantAT346060B
 WO2008019408
 DE2733628
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.