blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2192390

EP2192390 - Magnetic-inductive flow measuring apparatus [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.04.2022
Database last updated on 19.07.2024
FormerThe patent has been granted
Status updated on  14.05.2021
FormerGrant of patent is intended
Status updated on  03.02.2021
FormerExamination is in progress
Status updated on  11.01.2021
FormerGrant of patent is intended
Status updated on  13.12.2020
FormerExamination is in progress
Status updated on  15.09.2017
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Krohne AG
Uferstrasse 90
4019 Basel / CH
[2021/24]
Former [2010/22]For all designated states
Krohne AG
Uferstrasse 90
4019 Basel / CH
Inventor(s)01 / van Willigen, Armoud Leendert
Diabellistraat 7
2901 KC, Capelle aan den Ijssel / NL
 [2010/22]
Representative(s)Gesthuysen Patentanwälte
Patentanwälte
Postfach 10 13 54
45013 Essen / DE
[2021/24]
Former [2010/22]Gesthuysen, von Rohr & Eggert
Patentanwälte Postfach 10 13 54
45013 Essen / DE
Application number, filing date09014554.123.11.2009
[2010/22]
Priority number, dateDE2008105906726.11.2008         Original published format: DE102008059067
[2010/22]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP2192390
Date:02.06.2010
Language:DE
[2010/22]
Type: A3 Search report 
No.:EP2192390
Date:07.07.2010
[2010/27]
Type: B1 Patent specification 
No.:EP2192390
Date:16.06.2021
Language:DE
[2021/24]
Search report(s)(Supplementary) European search report - dispatched on:EP08.06.2010
ClassificationIPC:G01F1/58, G01F15/00, G01N27/08, G01F1/00
[2010/22]
CPC:
G01F1/584 (EP,US); G01F1/002 (EP,US); G01F15/006 (EP,US);
Y10T29/4902 (EP,US); Y10T29/49826 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2021/24]
Former [2010/22]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Magnetisch-induktives Durchflußmeßgerät[2010/22]
English:Magnetic-inductive flow measuring apparatus[2010/22]
French:Débitmètre à induction magnétique[2010/22]
Examination procedure06.12.2010Examination requested  [2011/03]
15.02.2011Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time
18.04.2011Amendment by applicant (claims and/or description)
06.09.2013Despatch of a communication from the examining division (Time limit: M06)
17.03.2014Reply to a communication from the examining division
30.08.2017Despatch of a communication from the examining division (Time limit: M04)
09.01.2018Reply to a communication from the examining division
21.04.2020Despatch of a communication from the examining division (Time limit: M06)
02.11.2020Reply to a communication from the examining division
14.12.2020Communication of intention to grant the patent
28.12.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
04.02.2021Communication of intention to grant the patent
03.05.2021Fee for grant paid
03.05.2021Fee for publishing/printing paid
03.05.2021Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  06.09.2013
Opposition(s)17.03.2022No opposition filed within time limit [2022/21]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
18.04.2011Request for further processing filed
18.04.2011Full payment received (date of receipt of payment)
Request granted
02.05.2011Decision despatched
Fees paidRenewal fee
30.11.2011Renewal fee patent year 03
29.11.2012Renewal fee patent year 04
25.11.2013Renewal fee patent year 05
27.11.2014Renewal fee patent year 06
25.11.2015Renewal fee patent year 07
24.11.2016Renewal fee patent year 08
28.11.2017Renewal fee patent year 09
21.11.2018Renewal fee patent year 10
20.11.2019Renewal fee patent year 11
02.11.2020Renewal fee patent year 12
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.11.2009
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
MK16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
IS16.10.2021
PT18.10.2021
AT23.11.2021
GB23.11.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
CH30.11.2021
FR30.11.2021
LI30.11.2021
[2024/22]
Former [2023/29]HU23.11.2009
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
IS16.10.2021
PT18.10.2021
AT23.11.2021
GB23.11.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
CH30.11.2021
FR30.11.2021
LI30.11.2021
Former [2023/24]CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
IS16.10.2021
PT18.10.2021
AT23.11.2021
GB23.11.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
CH30.11.2021
FR30.11.2021
LI30.11.2021
Former [2023/07]CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
IS16.10.2021
PT18.10.2021
AT23.11.2021
GB23.11.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
CH30.11.2021
FR30.11.2021
LI30.11.2021
Former [2023/01]CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
IS16.10.2021
PT18.10.2021
GB23.11.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
CH30.11.2021
FR30.11.2021
LI30.11.2021
Former [2022/48]CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
IS16.10.2021
PT18.10.2021
GB23.11.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
Former [2022/47]CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
IS16.10.2021
PT18.10.2021
GB23.11.2021
LU23.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
Former [2022/37]CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
IS16.10.2021
PT18.10.2021
LU23.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
Former [2022/36]CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
IS16.10.2021
PT18.10.2021
LU23.11.2021
BE30.11.2021
Former [2022/34]CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
IS16.10.2021
PT18.10.2021
LU23.11.2021
BE30.11.2021
Former [2022/33]CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
IS16.10.2021
PT18.10.2021
BE30.11.2021
Former [2022/29]CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/21]CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/10]CZ16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/09]CZ16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RO16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
PT18.10.2021
Former [2022/08]CZ16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
SE16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
Former [2022/07]FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
SE16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
Former [2021/50]FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
SE16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
DE27.09.2021
Former [2021/49]FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
SE16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/47]FI16.06.2021
LT16.06.2021
BG16.09.2021
Former [2021/46]FI16.06.2021
LT16.06.2021
Documents cited:Search[XAY]DE2950039  (KROHNE MESSTECHNIK KG [DE]) [X] 2-6 * page 5, line 1 - line 10 * * page 7, line 6 - line 35; figure 2 * [A] 14,18 [Y] 16;
 [XAY]US4565619  (GARDNER ROBERT J [US], et al) [X] 2-6,15 * column 5, line 9 - column 6, line 59; figures 6,7 * [A] 18 [Y] 16;
 [AD]EP0274768  (PUMPTECH NV [BE]) [AD] 1 * column 2, line 11 - column 3, line 44; figures 1-3 *;
 [X]DE4013634  (FISCHER & PORTER GMBH [DE]) [X] 14 * column 1, line 43 - column 2, line 6 *;
 [XY]DE4317366  (ULTRAKUST ELECTRONIC GMBH [DE]) [X] 1,7-9,11-13 * column 3, line 23 - column 5, line 60; figure 1 * [Y] 10;
 [Y]US5503027  (HEMP JOHN [GB]) [Y] 10 * column 13, line 1 - line 19; figure 11 *;
 [A]DE202004019442U  (BARTEC GMBH [DE]) [A] 1,7-9,11-13 * paragraph [0001] - paragraph [0007] * * paragraph [0045] - paragraph [0050]; figures 1,2 *;
 [A]DE102005019418  (KROHNE MESSTECHNIK KG [DE]) [A] 17* paragraph [0020] - paragraph [0023]; figure 1 *;
 [YD]EP1764587  (ABB PATENT GMBH [DE]) [YD] 16 * paragraph [0011] *;
 [A]DE102007005898  (FLOWTEC AG [CH]) [A] 11-13 * paragraph [0032] - paragraph [0036]; figures 2-4 *
ExaminationDE4243077
by applicantEP0608793
 DE4327826
 DE102004057696
 DE102006026310
 DE102006026311
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.