blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2253838

EP2253838 - A method of operating a wind turbine [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  11.11.2011
Database last updated on 16.11.2024
Most recent event   Tooltip11.11.2011Application deemed to be withdrawnpublished on 14.12.2011  [2011/50]
Applicant(s)For all designated states
LM GLASFIBER A/S
Jupitervej 6
6000 Kolding / DK
[2010/47]
Inventor(s)01 / Fuglsang, Peter
Stentoften 30
7100, Vejle / DK
02 / Bove, Stefano
Jættehøj 5
6640, Lunderskov / DK
03 / Fuglsang, Lars
Elvej 6
5260, Odense S / DK
 [2010/47]
Representative(s)Kitchen, Steven Richard
Chas. Hude A/S
H.C. Andersens Boulevard 33
1780 Copenhagen V / DK
[N/P]
Former [2010/47]Kitchen, Steven Richard
Chas. Hude A/S H.C. Andersens Boulevard 33
1780 Copenhagen V / DK
Application number, filing date09160498.318.05.2009
[2010/47]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2253838
Date:24.11.2010
Language:EN
[2010/47]
Search report(s)(Supplementary) European search report - dispatched on:EP21.12.2009
ClassificationIPC:F03D1/06, F03D7/02
[2010/47]
CPC:
F03D1/0641 (EP,US); F03D7/0224 (EP,US); F03D7/0232 (EP,US);
F05B2240/301 (EP,US); F05B2240/305 (EP); F05B2240/3052 (EP);
F05B2240/3062 (EP); F05B2240/32 (EP,US); Y02E10/72 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2010/47]
Extension statesALNot yet paid
BANot yet paid
RSNot yet paid
TitleGerman:Verfahren zum Betrieb einer Windkraftanlage[2010/47]
English:A method of operating a wind turbine[2010/47]
French:Procédé de fonctionnement d'une éolienne[2010/47]
Examination procedure25.05.2011Application deemed to be withdrawn, date of legal effect  [2011/50]
30.06.2011Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [2011/50]
Fees paidRenewal fee
25.05.2011Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]WO0114740  (FORSKNINGSCT RISOE RISOE NAT L [DK], et al) [X] 1-9 * page 3, line 29 - line 30 * * page 6, line 31 - page 7, line 2 * * page 11, line 6 - line 9 * * page 11, line 18 - line 20 * * page 12, line 10 - line 18 * * page 12, line 25 - page 13, line 2 * * page 13, line 34 - page 14, line 11 * * figure 2 *;
 [X]EP2031242  (LM GLASFIBER AS [DK]) [X] 1-9 * paragraphs [0006] , [0019] * * figure - *;
 [X]DE19964114  (DLR EV [DE]) [X] 1-9 * figure - *;
 [X]WO0208600  (STICHTING ENERGIE [NL], et al) [X] 1-9 * figures 5,6 *;
 [X]US5088665  (VIJGEN PAUL M H W [US], et al) [X] 1-9 * figures 10-13 *;
 [X]WO2007140771  (VESTAS WIND SYS AS [DK], et al) [X] 1-9 * page 14, line 8 - line 11 * * figure - *;
 [X]EP1944505  (SIEMENS AG [DE]) [X] 1-9 * paragraphs [0007] , [0014] * * figure 1 *;
 [X]DE102006017897  (REPOWER SYSTEMS AG [DE]) [X] 1-9 * paragraphs [0023] , [0067] , [0068] * * figure - *;
 [A]WO03029644  (HAMMERFEST STROEM AS [NO], et al) [A] 1 * page 3, line 29 *
by applicantDE19833869
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.