EP2175237 - System and methods for image-based navigation using line features matching [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.06.2019 Database last updated on 12.11.2024 | |
Former | The patent has been granted Status updated on 20.07.2018 | ||
Former | Grant of patent is intended Status updated on 10.04.2018 | ||
Former | Examination is in progress Status updated on 11.07.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Honeywell International Inc. 115 Tabor Road Morris Plains, NJ 07950 / US | [2015/51] |
Former [2010/15] | For all designated states Honeywell International, Inc. 101 Columbia Road Morristown NJ 07962 / US | Inventor(s) | 01 /
Susca, Sara Honeywell International Inc. Patent Services M/S AB/2B 101 Columbia Road P.O. Box 2245 Morristown, NJ 07962-2245 / US | 02 /
Krishnaswamy, Kailash Honeywell International Inc. Patent Services M/S AB/2B 101 Columbia Road P.O. Box 2245 Morristown, NJ 07962-2245 / US | [2018/34] |
Former [2010/15] | 01 /
Susca, Sara Honeywell International Inc. Patent Services M/S AB/2B 101 Columbia Road P.O. Box 2245 Morristown, NJ 07962-2245 / US | ||
02 /
Krishnaswamy, Kailash Honeywell International Inc. Patent Services M/S AB/2B 101 Columbia Road P.O. Box 2245 Morristown, NJ 07962-2245 / US | Representative(s) | Houghton, Mark Phillip, et al Patent Outsourcing Limited 1 King Street Bakewell, Derbyshire DE45 1DZ / GB | [2018/34] |
Former [2010/15] | Buckley, Guy Julian Patent Outsourcing Limited 1 King Street Bakewell Derbyshire DE45 1DZ / GB | Application number, filing date | 09172481.5 | 07.10.2009 | [2010/15] | Priority number, date | US20080250457 | 13.10.2008 Original published format: US 250457 | [2010/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2175237 | Date: | 14.04.2010 | Language: | EN | [2010/15] | Type: | B1 Patent specification | No.: | EP2175237 | Date: | 22.08.2018 | Language: | EN | [2018/34] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.02.2010 | Classification | IPC: | G01C21/12, G01C21/16, G05D1/02, G06T7/00, G06T7/20, G06T7/33 | [2018/14] | CPC: |
G01C21/1656 (EP,US);
G01C21/12 (EP,US);
G01C21/1652 (EP,US);
G01C21/1654 (EP,US);
G06T7/33 (EP,US);
G06T2207/10028 (EP,US)
|
Former IPC [2010/15] | G01C21/12, G01C21/16, G05D1/02, G06T7/00, G06T7/20 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2018/34] |
Former [2010/15] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | System und Verfahren zur bildbasierten Navigation mithilfe der Übereinstimmung von Linienmerkmale | [2010/15] | English: | System and methods for image-based navigation using line features matching | [2010/15] | French: | Système et procédés pour la navigation basée sur des images et utilisant la concordance entre des caractéristiques de lignes | [2010/15] | Examination procedure | 07.10.2009 | Examination requested [2010/15] | 08.03.2010 | Despatch of a communication from the examining division (Time limit: M06) | 12.08.2010 | Reply to a communication from the examining division | 29.06.2017 | Despatch of a communication from the examining division (Time limit: M04) | 30.10.2017 | Reply to a communication from the examining division | 11.04.2018 | Communication of intention to grant the patent | 12.07.2018 | Fee for grant paid | 12.07.2018 | Fee for publishing/printing paid | 12.07.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 08.03.2010 | Opposition(s) | 23.05.2019 | No opposition filed within time limit [2019/31] | Fees paid | Renewal fee | 10.10.2011 | Renewal fee patent year 03 | 05.10.2012 | Renewal fee patent year 04 | 07.10.2013 | Renewal fee patent year 05 | 07.10.2014 | Renewal fee patent year 06 | 07.10.2015 | Renewal fee patent year 07 | 07.10.2016 | Renewal fee patent year 08 | 31.10.2017 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.10.2009 | AT | 22.08.2018 | CY | 22.08.2018 | CZ | 22.08.2018 | DK | 22.08.2018 | EE | 22.08.2018 | ES | 22.08.2018 | FI | 22.08.2018 | HR | 22.08.2018 | IT | 22.08.2018 | LT | 22.08.2018 | LV | 22.08.2018 | MC | 22.08.2018 | MK | 22.08.2018 | NL | 22.08.2018 | PL | 22.08.2018 | PT | 22.08.2018 | RO | 22.08.2018 | SE | 22.08.2018 | SI | 22.08.2018 | SK | 22.08.2018 | SM | 22.08.2018 | TR | 22.08.2018 | IE | 07.10.2018 | LU | 07.10.2018 | MT | 07.10.2018 | FR | 22.10.2018 | BE | 31.10.2018 | CH | 31.10.2018 | LI | 31.10.2018 | BG | 22.11.2018 | NO | 22.11.2018 | GR | 23.11.2018 | IS | 22.12.2018 | [2020/31] |
Former [2020/30] | HU | 07.10.2009 | |
AT | 22.08.2018 | ||
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
PT | 22.08.2018 | ||
RO | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
TR | 22.08.2018 | ||
IE | 07.10.2018 | ||
LU | 07.10.2018 | ||
MT | 07.10.2018 | ||
FR | 22.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2020/27] | AT | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
PT | 22.08.2018 | ||
RO | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
TR | 22.08.2018 | ||
IE | 07.10.2018 | ||
LU | 07.10.2018 | ||
MT | 07.10.2018 | ||
FR | 22.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2020/17] | AT | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
TR | 22.08.2018 | ||
IE | 07.10.2018 | ||
LU | 07.10.2018 | ||
MT | 07.10.2018 | ||
FR | 22.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2020/08] | AT | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
IE | 07.10.2018 | ||
LU | 07.10.2018 | ||
MT | 07.10.2018 | ||
FR | 22.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/48] | AT | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
IE | 07.10.2018 | ||
LU | 07.10.2018 | ||
FR | 22.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/40] | AT | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
LU | 07.10.2018 | ||
FR | 22.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/38] | AT | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
LU | 07.10.2018 | ||
FR | 22.10.2018 | ||
BE | 31.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/37] | AT | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
LU | 07.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/30] | AT | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
SE | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
LU | 07.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/28] | AT | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
SE | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/26] | AT | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
SE | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/23] | AT | 22.08.2018 | |
CZ | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
SE | 22.08.2018 | ||
SK | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/22] | CZ | 22.08.2018 | |
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/21] | ES | 22.08.2018 | |
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
NL | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/12] | ES | 22.08.2018 | |
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
NL | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/11] | FI | 22.08.2018 | |
HR | 22.08.2018 | ||
LT | 22.08.2018 | ||
NL | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/10] | FI | 22.08.2018 | |
LT | 22.08.2018 | ||
NL | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/09] | FI | 22.08.2018 | |
LT | 22.08.2018 | ||
NL | 22.08.2018 | ||
NO | 22.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/08] | FI | 22.08.2018 | |
LT | 22.08.2018 | ||
NO | 22.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/07] | LT | 22.08.2018 | Documents cited: | Search | [I]EP0364353 (COMMISSARIAT ENERGIE ATOMIQUE [FR]) [I] 1-10 * column 1, line 36 - column 3, line 43 * * figures 1-3 *; | [I]EP1975646 (HONEYWELL INT INC [US]) [I] 1-10 * paragraphs [0003] , [0005] , [0006] , [0008] * * paragraphs [0013] , [0016] * * paragraphs [0017] , [0018] , [0021] - [0023] * * figures 1-3 *; | [I] - UIJT DE HAAG M ET AL, "Implementation of a Flash-LADAR aided inertial navigator", POSITION, LOCATION AND NAVIGATION SYMPOSIUM, 2008 IEEE/ION, IEEE, PISCATAWAY, NJ, USA, (20080505), ISBN 978-1-4244-1536-6, pages 560 - 567, XP031340887 [I] 1-10 * abstract * * page 561, column l, paragraph 2 - column r, paragraph 2 * * page 562 * * page 565, column r * | [A] - T. MATSUYAMA, H. ARITA, M. NAGAO, "Structural matching of line drawings using the geometric relationship between line segments", COMPUTER VISION, GRAPHICS, AND IMAGE PROCESSING, (1984), vol. 27, pages 177 - 194, XP002565328 [A] 1-10 * page 177 * * page 178, paragraph 5 - page 179 * * page 185 * DOI: http://dx.doi.org/10.1016/S0734-189X(84)80042-0 |