blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2226221

EP2226221 - Electric connecting cable [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  12.08.2011
Database last updated on 24.08.2024
Most recent event   Tooltip12.08.2011Application deemed to be withdrawnpublished on 14.09.2011  [2011/37]
Applicant(s)For all designated states
Nexans
8, rue du Général Foy
75008 Paris / FR
[2011/12]
Former [2010/36]For all designated states
Nexans
16, rue de Monceau
75008 Paris / FR
Inventor(s)01 / Hosenfeld, Bärbel
Lindenstrasse 13
92899 Irchenrieth / DE
 [2010/36]
Representative(s)Döring, Roger
Patentanwalt
Weidenkamp 2
30855 Langenhagen / DE
[N/P]
Former [2010/36]Döring, Roger
Patentanwalt Weidenkamp 2
30855 Langenhagen / DE
Application number, filing date09290160.206.03.2009
[2010/36]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2226221
Date:08.09.2010
Language:DE
[2010/36]
Search report(s)(Supplementary) European search report - dispatched on:EP10.07.2009
ClassificationIPC:B60R16/02, H01B7/06
[2010/36]
CPC:
H01B7/06 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2010/36]
TitleGerman:Elektrische Verbindungsleitung[2010/36]
English:Electric connecting cable[2010/36]
French:Câble de liaison électrique[2010/36]
Examination procedure09.03.2011Application deemed to be withdrawn, date of legal effect  [2011/37]
20.04.2011Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [2011/37]
Fees paidPenalty fee
Additional fee for renewal fee
31.03.201103   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]JP2006190495  (YAZAKI CORP) [X] 1-4 * paragraphs [0042] , [0043] , [0054]; figures 1-10 *;
 [A]EP1443592  (KARLSRUHE FORSCHZENT [DE]) [A] 3 * paragraphs [0016] - [0018] - [0030]; figure 3 *;
 [A]JPS6296211U  (N.A.) [A] 3 * figures 1,3,5 *;
 [A]US1978591  (FRANZ MEIWALD) [A] 1 * page 1, line 1 - line 4 * * page 1, line 63 - line 72; figure 1; claim 1 *
by applicantDE1962536
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.