EP2135670 - A selective hydrogenation catalyst [Right-click to bookmark this link] | |||
Former [2009/52] | A selective hydrogenation catalyst and its methods of preparation | ||
[2016/39] | Status | No opposition filed within time limit Status updated on 05.01.2018 Database last updated on 06.11.2024 | |
Former | The patent has been granted Status updated on 27.01.2017 | ||
Former | Grant of patent is intended Status updated on 16.01.2017 | Most recent event Tooltip | 06.03.2020 | Lapse of the patent in a contracting state New state(s): TR | published on 08.04.2020 [2020/15] | Applicant(s) | For all designated states IFP Energies nouvelles 1 & 4 avenue de Bois-Préau 92500 Rueil-Malmaison / FR | [2017/44] |
Former [2017/09] | For all designated states IFP Énergies nouvelles 1 & 4, avenue de Bois-Préau 92852 Rueil-Malmaison Cedex / FR | ||
Former [2010/40] | For all designated states IFP Energies nouvelles 1 & 4, avenue de Bois-Préau 92852 Rueil-Malmaison Cedex / FR | ||
Former [2009/52] | For all designated states IFP 1 et 4 Avenue de Bois Préau 92852 Rueil-Malmaison Cédex / FR | Inventor(s) | 01 /
Fecant, Antoine 3 allée des Tulipes 69530 Brignais / FR | 02 /
Fischer, Lars 15B Chemin de Collonges Dom. de C. 38200 Vienne / FR | 03 /
Rebours, Bernadette 47, rue Elie Rochette 69007 Lyon / FR | 04 /
Revel, Renaud Ham de Mons 38200 Serpaize / FR | 05 /
Thomazeau, Cécile 11, rue Paul Valéry 69530 Brignais / FR | [2009/52] | Application number, filing date | 09290405.1 | 29.05.2009 | [2009/52] | Priority number, date | FR20080003482 | 20.06.2008 Original published format: FR 0803482 | [2009/52] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP2135670 | Date: | 23.12.2009 | Language: | FR | [2009/52] | Type: | B1 Patent specification | No.: | EP2135670 | Date: | 01.03.2017 | Language: | FR | [2017/09] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.07.2009 | Classification | IPC: | B01J21/04, B01J23/44, B01J37/00, B01J37/02, B01J37/10, C10G45/40, C01F7/02, C07C5/02 | [2009/52] | CPC: |
B01J21/04 (EP,US);
B01J23/44 (EP,US);
B01J37/0009 (EP,US);
B01J37/0201 (EP,US);
B01J37/10 (EP,US);
C01F7/448 (EP,US);
C07C5/02 (EP,US);
C10G45/40 (EP,US);
B01J35/615 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2017/09] |
Former [2009/52] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | Katalysator zur selektiven Hydrierung | [2016/39] | English: | A selective hydrogenation catalyst | [2016/39] | French: | Catalyseur d'hydrogénation sélective | [2016/39] |
Former [2009/52] | Katalysator zur selektiven Hydrierung und Verfahren zu seiner Herstellung | ||
Former [2009/52] | A selective hydrogenation catalyst and its methods of preparation | ||
Former [2009/52] | Catalyseur d'hydrogénation sélective et ses procédé de préparation | Examination procedure | 23.06.2010 | Examination requested [2010/31] | 16.07.2010 | Despatch of a communication from the examining division (Time limit: M06) | 14.01.2011 | Reply to a communication from the examining division | 13.02.2013 | Despatch of a communication from the examining division (Time limit: M06) | 06.08.2013 | Reply to a communication from the examining division | 06.02.2015 | Despatch of a communication from the examining division (Time limit: M04) | 04.06.2015 | Reply to a communication from the examining division | 28.09.2016 | Communication of intention to grant the patent | 11.01.2017 | Fee for grant paid | 11.01.2017 | Fee for publishing/printing paid | 11.01.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 16.07.2010 | Opposition(s) | 04.12.2017 | No opposition filed within time limit [2018/06] | Fees paid | Renewal fee | 31.05.2011 | Renewal fee patent year 03 | 31.05.2012 | Renewal fee patent year 04 | 31.05.2013 | Renewal fee patent year 05 | 02.06.2014 | Renewal fee patent year 06 | 01.06.2015 | Renewal fee patent year 07 | 31.05.2016 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.05.2009 | AT | 01.03.2017 | CY | 01.03.2017 | EE | 01.03.2017 | ES | 01.03.2017 | FI | 01.03.2017 | HR | 01.03.2017 | IT | 01.03.2017 | LT | 01.03.2017 | LV | 01.03.2017 | MC | 01.03.2017 | MK | 01.03.2017 | MT | 01.03.2017 | PL | 01.03.2017 | RO | 01.03.2017 | SE | 01.03.2017 | SI | 01.03.2017 | SK | 01.03.2017 | TR | 01.03.2017 | IE | 29.05.2017 | LU | 29.05.2017 | CH | 31.05.2017 | LI | 31.05.2017 | BG | 01.06.2017 | NO | 01.06.2017 | GR | 02.06.2017 | IS | 01.07.2017 | PT | 03.07.2017 | [2020/15] |
Former [2019/51] | HU | 29.05.2009 | |
AT | 01.03.2017 | ||
CY | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
MK | 01.03.2017 | ||
MT | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
IE | 29.05.2017 | ||
LU | 29.05.2017 | ||
CH | 31.05.2017 | ||
LI | 31.05.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2019/46] | HU | 29.05.2009 | |
AT | 01.03.2017 | ||
CY | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
MT | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
IE | 29.05.2017 | ||
LU | 29.05.2017 | ||
CH | 31.05.2017 | ||
LI | 31.05.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2019/31] | HU | 29.05.2009 | |
AT | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
MT | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
IE | 29.05.2017 | ||
LU | 29.05.2017 | ||
CH | 31.05.2017 | ||
LI | 31.05.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2018/43] | AT | 01.03.2017 | |
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
MT | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
IE | 29.05.2017 | ||
LU | 29.05.2017 | ||
CH | 31.05.2017 | ||
LI | 31.05.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2018/23] | AT | 01.03.2017 | |
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
IE | 29.05.2017 | ||
LU | 29.05.2017 | ||
CH | 31.05.2017 | ||
LI | 31.05.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2018/17] | AT | 01.03.2017 | |
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
LU | 29.05.2017 | ||
CH | 31.05.2017 | ||
LI | 31.05.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2018/13] | AT | 01.03.2017 | |
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
CH | 31.05.2017 | ||
LI | 31.05.2017 | ||
LU | 31.05.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2018/06] | AT | 01.03.2017 | |
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
SE | 01.03.2017 | ||
SK | 01.03.2017 | ||
LU | 31.05.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2017/51] | AT | 01.03.2017 | |
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
SE | 01.03.2017 | ||
SK | 01.03.2017 | ||
LU | 31.05.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2017/50] | AT | 01.03.2017 | |
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
SE | 01.03.2017 | ||
SK | 01.03.2017 | ||
LU | 31.05.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
Former [2017/49] | AT | 01.03.2017 | |
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
RO | 01.03.2017 | ||
SE | 01.03.2017 | ||
SK | 01.03.2017 | ||
LU | 31.05.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
Former [2017/41] | AT | 01.03.2017 | |
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
SE | 01.03.2017 | ||
LU | 31.05.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | Documents cited: | Search | [XD]EP0576828 (HUELS CHEMISCHE WERKE AG [DE]); | [XY]EP0903177 (INST FRANCAIS DU PETROLE [FR]); | [XY]FR2787040 (INST FRANCAIS DU PETROLE [FR]); | [XY]US6437206 (MEYER GERALD [DE], et al); | [A]EP1897613 (REPSOL YPF [ES]) | by applicant | EP0576828 | US6437206 |