EP2242325 - METHOD, SYSTEM AND EQUIPMENT FOR ACCESS OF A NETWORK DEVICE TO A PACKET EXCHANGE NETWORK [Right-click to bookmark this link] | |||
Former [2010/42] | METHOD?SYSTEM AND EQUIPMENT FOR ACCESSING NETWORK DEVICE TO PACKET EXCHANGE NETWORK | ||
[2012/21] | Status | No opposition filed within time limit Status updated on 16.08.2013 Database last updated on 02.11.2024 | Most recent event Tooltip | 17.07.2015 | Lapse of the patent in a contracting state New state(s): HU, LU | published on 19.08.2015 [2015/34] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [N/P] |
Former [2010/42] | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District, Shenzhen Guangdong 518129 / CN | ||
Former [2010/42] | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | Inventor(s) | 01 /
LI, Jian Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | 02 /
LV, Hong Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | 03 /
JIANG, Yuping Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | [2012/41] |
Former [2010/42] | 01 /
LI, Jian Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | ||
02 /
LV, Hong Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | |||
03 /
JIANG, Yuping Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | Representative(s) | Pfenning, Meinig & Partner mbB Patent- und Rechtsanwälte Theresienhöhe 11a 80339 München / DE | [N/P] |
Former [2012/41] | Pfenning, Meinig & Partner GbR Patent- und Rechtsanwälte Theresienhöhe 13 80339 München / DE | ||
Former [2010/42] | Pfenning, Meinig & Partner GbR Patent- und Rechtsanwälte Theresienhöhe 13 80339 München / DE | Application number, filing date | 09702228.9 | 07.01.2009 | [2010/42] | WO2009CN70067 | Priority number, date | CN2008101013 | 10.01.2008 Original published format: CN200810001013 | [2010/42] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009089784 | Date: | 23.07.2009 | Language: | ZH | [2009/30] | Type: | A1 Application with search report | No.: | EP2242325 | Date: | 20.10.2010 | Language: | EN | [2010/42] | Type: | B1 Patent specification | No.: | EP2242325 | Date: | 10.10.2012 | Language: | EN | [2012/41] | Search report(s) | International search report - published on: | CN | 23.07.2009 | (Supplementary) European search report - dispatched on: | EP | 14.06.2011 | Classification | IPC: | H04W92/04, H04L12/56, H04L29/06 | [2012/19] | CPC: |
H04L45/00 (EP,US);
H04L45/24 (EP,US);
H04L45/586 (EP,US);
H04L65/103 (EP,US)
|
Former IPC [2010/42] | H04W92/04 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2010/42] | Title | German: | VERFAHREN, SYSTEM UND VORRICHTUNG FÜR DEN ZUGANG EINES NETZWERKGERÄTES ZU EINEM PAKETVERMITTUNGSNETZ | [2012/21] | English: | METHOD, SYSTEM AND EQUIPMENT FOR ACCESS OF A NETWORK DEVICE TO A PACKET EXCHANGE NETWORK | [2012/21] | French: | PROCÉDÉ, SYSTÈME ET ÉQUIPEMENT PERMETTANT L'ACCÈS D'UN DISPOSITIF RÉSEAU À UN RÉSEAU D'ÉCHANGE DE PAQUETS | [2010/42] |
Former [2010/42] | VERFAHREN, SYSTEM UND AUSRÜSTUNG ZUR DEN ZUGANG EINES NETZWERKGERÄTS ZU EINEM PAKETVERMITTUNGSNETZ | ||
Former [2010/42] | METHOD?SYSTEM AND EQUIPMENT FOR ACCESSING NETWORK DEVICE TO PACKET EXCHANGE NETWORK | Entry into regional phase | 21.07.2010 | Translation filed | 21.07.2010 | National basic fee paid | 21.07.2010 | Search fee paid | 21.07.2010 | Designation fee(s) paid | 21.07.2010 | Examination fee paid | Examination procedure | 21.07.2010 | Examination requested [2010/42] | 21.12.2011 | Amendment by applicant (claims and/or description) | 07.05.2012 | Communication of intention to grant the patent | 21.08.2012 | Fee for grant paid | 21.08.2012 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 07.05.2012 | Opposition(s) | 11.07.2013 | No opposition filed within time limit [2013/38] | Fees paid | Renewal fee | 31.01.2011 | Renewal fee patent year 03 | 31.01.2012 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.01.2009 | AT | 10.10.2012 | BE | 10.10.2012 | CY | 10.10.2012 | CZ | 10.10.2012 | DK | 10.10.2012 | EE | 10.10.2012 | FI | 10.10.2012 | HR | 10.10.2012 | LT | 10.10.2012 | LV | 10.10.2012 | MK | 10.10.2012 | MT | 10.10.2012 | NL | 10.10.2012 | PL | 10.10.2012 | RO | 10.10.2012 | SE | 10.10.2012 | SI | 10.10.2012 | SK | 10.10.2012 | TR | 10.10.2012 | IE | 07.01.2013 | LU | 07.01.2013 | BG | 10.01.2013 | NO | 10.01.2013 | GR | 11.01.2013 | CH | 31.01.2013 | LI | 31.01.2013 | MC | 31.01.2013 | IS | 10.02.2013 | PT | 11.02.2013 | [2015/34] |
Former [2015/32] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
CY | 10.10.2012 | ||
CZ | 10.10.2012 | ||
DK | 10.10.2012 | ||
EE | 10.10.2012 | ||
FI | 10.10.2012 | ||
HR | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
MK | 10.10.2012 | ||
MT | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
RO | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
SK | 10.10.2012 | ||
TR | 10.10.2012 | ||
IE | 07.01.2013 | ||
BG | 10.01.2013 | ||
NO | 10.01.2013 | ||
GR | 11.01.2013 | ||
CH | 31.01.2013 | ||
LI | 31.01.2013 | ||
MC | 31.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2014/32] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
CY | 10.10.2012 | ||
CZ | 10.10.2012 | ||
DK | 10.10.2012 | ||
EE | 10.10.2012 | ||
FI | 10.10.2012 | ||
HR | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
MT | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
RO | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
SK | 10.10.2012 | ||
IE | 07.01.2013 | ||
BG | 10.01.2013 | ||
NO | 10.01.2013 | ||
GR | 11.01.2013 | ||
CH | 31.01.2013 | ||
LI | 31.01.2013 | ||
MC | 31.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2014/07] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
CY | 10.10.2012 | ||
CZ | 10.10.2012 | ||
DK | 10.10.2012 | ||
EE | 10.10.2012 | ||
FI | 10.10.2012 | ||
HR | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
RO | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
SK | 10.10.2012 | ||
IE | 07.01.2013 | ||
BG | 10.01.2013 | ||
NO | 10.01.2013 | ||
GR | 11.01.2013 | ||
CH | 31.01.2013 | ||
LI | 31.01.2013 | ||
MC | 31.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2013/52] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
CY | 10.10.2012 | ||
CZ | 10.10.2012 | ||
DK | 10.10.2012 | ||
EE | 10.10.2012 | ||
FI | 10.10.2012 | ||
HR | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
RO | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
SK | 10.10.2012 | ||
BG | 10.01.2013 | ||
NO | 10.01.2013 | ||
GR | 11.01.2013 | ||
CH | 31.01.2013 | ||
LI | 31.01.2013 | ||
MC | 31.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2013/48] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
CZ | 10.10.2012 | ||
DK | 10.10.2012 | ||
EE | 10.10.2012 | ||
FI | 10.10.2012 | ||
HR | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
RO | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
SK | 10.10.2012 | ||
BG | 10.01.2013 | ||
NO | 10.01.2013 | ||
GR | 11.01.2013 | ||
CH | 31.01.2013 | ||
LI | 31.01.2013 | ||
MC | 31.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2013/37] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
CZ | 10.10.2012 | ||
DK | 10.10.2012 | ||
EE | 10.10.2012 | ||
FI | 10.10.2012 | ||
HR | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
RO | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
SK | 10.10.2012 | ||
BG | 10.01.2013 | ||
NO | 10.01.2013 | ||
GR | 11.01.2013 | ||
MC | 31.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2013/35] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
CZ | 10.10.2012 | ||
DK | 10.10.2012 | ||
EE | 10.10.2012 | ||
FI | 10.10.2012 | ||
HR | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
SK | 10.10.2012 | ||
BG | 10.01.2013 | ||
NO | 10.01.2013 | ||
GR | 11.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2013/34] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
DK | 10.10.2012 | ||
FI | 10.10.2012 | ||
HR | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
BG | 10.01.2013 | ||
NO | 10.01.2013 | ||
GR | 11.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2013/31] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
FI | 10.10.2012 | ||
HR | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
NO | 10.01.2013 | ||
GR | 11.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2013/28] | BE | 10.10.2012 | |
FI | 10.10.2012 | ||
HR | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
NO | 10.01.2013 | ||
GR | 11.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2013/24] | BE | 10.10.2012 | |
FI | 10.10.2012 | ||
HR | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
NO | 10.01.2013 | ||
GR | 11.01.2013 | ||
IS | 10.02.2013 | ||
Former [2013/23] | FI | 10.10.2012 | |
HR | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
NO | 10.01.2013 | ||
IS | 10.02.2013 | ||
Former [2013/22] | FI | 10.10.2012 | |
LT | 10.10.2012 | ||
NL | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
NO | 10.01.2013 | ||
IS | 10.02.2013 | ||
Former [2013/21] | LT | 10.10.2012 | |
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
NO | 10.01.2013 | ||
Former [2013/20] | LT | 10.10.2012 | |
SI | 10.10.2012 | ||
NO | 10.01.2013 | ||
Former [2013/11] | SI | 10.10.2012 | Documents cited: | Search | [A]US2007207591 (RAHMAN RESHAD A [CA], et al) [A] 1-11 * paragraph [0028] - paragraph [0055] * * figures 1-6 *; | [Y]US2007280102 (VASSEUR JEAN-PHILIPPE [US], et al) [Y] 1-11 * paragraphs [0037] , [0041] , [0070] - [0072] - [0075] * * figures 1,2,5,6 *; | [Y] - KATZ JUNIPER NETWORKS D WARD CISCO SYSTEMS D, "Generic Application of BFD; draft-ietf-bfd-generic-03.txt", IETF STANDARD-WORKING-DRAFT, INTERNET ENGINEERING TASK FORCE, IETF, CH, (20070301), vol. bfd, no. 3, ISSN 0000-0004, XP015049199 [Y] 1-11 * chapter 4, pages 8-9 * * chapter 3.2, pages 4-6 * | [AP] - XIANGPING WU ET AL, "Improve the fault management capability of IP networks", RELIABILITY, MAINTAINABILITY AND SAFETY, 2009. ICRMS 2009. 8TH INTERNATIONAL CONFERENCE ON, IEEE, PISCATAWAY, NJ, USA, (20090720), ISBN 978-1-4244-4903-3, pages 1164 - 1168, XP031532926 [AP] 1-11 * chapter V, pages 1166-1168 * | International search | [A]CN1303557 (ERICSSON TELEFON AB L M [SE]); | [A]CN1391749 (ERICSSON TELEFON AB L M PUBL [SE]) |