EP2237584 - COMMUNICATIONS SYSTEM, FORWARDING NODE AND COMMUNICATIONS CONTROL METHOD [Right-click to bookmark this link] | |||
Former [2010/40] | COMMUNICATIONS SYSTEM, FORWARDING NODE, MOBILE NODE, SERVER, AND COMMUNICATIONS CONTROL METHOD AND PROGRAM | ||
[2021/17] | Status | No opposition filed within time limit Status updated on 22.07.2022 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 13.08.2021 | ||
Former | Grant of patent is intended Status updated on 07.04.2021 | ||
Former | Examination is in progress Status updated on 05.04.2019 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states NEC Corporation 7-1, Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | [2010/40] |
Former [2010/40] | For all designated states Nec Corporation 7-1 Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | Inventor(s) | 01 /
AWANO, Jun c/o NEC Corporation 7-1 Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | [2021/37] |
Former [2010/40] | 01 /
AWANO, Jun c/o NEC Corporation 7-1 Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | Representative(s) | Betten & Resch Patent- und Rechtsanwälte PartGmbB Maximiliansplatz 14 80333 München / DE | [2021/37] |
Former [2010/40] | Betten & Resch Patentanwälte Theatinerstrasse 8 80333 München / DE | Application number, filing date | 09719450.0 | 10.03.2009 | [2010/40] | WO2009JP54501 | Priority number, date | JP20080059488 | 10.03.2008 Original published format: JP 2008059488 | [2010/40] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009113517 | Date: | 17.09.2009 | Language: | JA | [2009/38] | Type: | A1 Application with search report | No.: | EP2237584 | Date: | 06.10.2010 | Language: | EN | [2010/40] | Type: | B1 Patent specification | No.: | EP2237584 | Date: | 15.09.2021 | Language: | EN | [2021/37] | Search report(s) | International search report - published on: | JP | 17.09.2009 | (Supplementary) European search report - dispatched on: | EP | 21.03.2016 | Classification | IPC: | H04W8/04, H04W28/06, H04W80/04 | [2010/40] | CPC: |
H04W28/06 (EP,US);
H04W8/04 (EP,US);
H04W80/045 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2021/37] |
Former [2010/40] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | KOMMUNIKATIONSSYSTEM, WEITERLEITUNGSKNOTEN UND KOMMUNIKATIONSKONTROLLVERFAHREN | [2021/17] | English: | COMMUNICATIONS SYSTEM, FORWARDING NODE AND COMMUNICATIONS CONTROL METHOD | [2021/17] | French: | SYSTÈME DE COMMUNICATIONS, NOEUD DE RETRANSMISSION ET PROCÉDÉ DE COMMANDE DE COMMUNICATIONS | [2021/17] |
Former [2010/40] | KOMMUNIKATIONSSYSTEM, WEITERLEITUNGSKNOTEN, MOBILKNOTEN, SERVER UND KOMMUNIKATIONSKONTROLLVERFAHREN UND PROGRAMM | ||
Former [2010/40] | COMMUNICATIONS SYSTEM, FORWARDING NODE, MOBILE NODE, SERVER, AND COMMUNICATIONS CONTROL METHOD AND PROGRAM | ||
Former [2010/40] | SYSTÈME DE COMMUNICATIONS, NOEUD DE RETRANSMISSION, NOEUD MOBILE, SERVEUR, ET PROCÉDÉ ET PROGRAMME DE COMMANDE DE COMMUNICATIONS | Entry into regional phase | 19.08.2010 | Translation filed | 19.08.2010 | National basic fee paid | 19.08.2010 | Search fee paid | 19.08.2010 | Designation fee(s) paid | 19.08.2010 | Examination fee paid | Examination procedure | 09.12.2009 | Request for preliminary examination filed International Preliminary Examining Authority: JP | 19.08.2010 | Examination requested [2010/40] | 06.10.2016 | Amendment by applicant (claims and/or description) | 09.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 09.08.2019 | Reply to a communication from the examining division | 12.06.2020 | Despatch of a communication from the examining division (Time limit: M04) | 12.10.2020 | Reply to a communication from the examining division | 08.04.2021 | Communication of intention to grant the patent | 06.08.2021 | Fee for grant paid | 06.08.2021 | Fee for publishing/printing paid | 06.08.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 09.04.2019 | Opposition(s) | 16.06.2022 | No opposition filed within time limit [2022/34] | Fees paid | Renewal fee | 31.03.2011 | Renewal fee patent year 03 | 31.03.2012 | Renewal fee patent year 04 | 02.04.2013 | Renewal fee patent year 05 | 31.03.2014 | Renewal fee patent year 06 | 31.03.2015 | Renewal fee patent year 07 | 31.03.2016 | Renewal fee patent year 08 | 10.03.2017 | Renewal fee patent year 09 | 13.03.2018 | Renewal fee patent year 10 | 13.03.2019 | Renewal fee patent year 11 | 12.03.2020 | Renewal fee patent year 12 | 12.03.2021 | Renewal fee patent year 13 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.03.2009 | AT | 15.09.2021 | CY | 15.09.2021 | CZ | 15.09.2021 | DK | 15.09.2021 | EE | 15.09.2021 | ES | 15.09.2021 | FI | 15.09.2021 | HR | 15.09.2021 | IT | 15.09.2021 | LT | 15.09.2021 | LV | 15.09.2021 | MC | 15.09.2021 | MK | 15.09.2021 | MT | 15.09.2021 | NL | 15.09.2021 | PL | 15.09.2021 | RO | 15.09.2021 | SE | 15.09.2021 | SI | 15.09.2021 | SK | 15.09.2021 | BG | 15.12.2021 | NO | 15.12.2021 | GR | 16.12.2021 | IS | 15.01.2022 | PT | 17.01.2022 | IE | 10.03.2022 | LU | 10.03.2022 | BE | 31.03.2022 | CH | 31.03.2022 | FR | 31.03.2022 | LI | 31.03.2022 | [2024/41] |
Former [2024/22] | HU | 10.03.2009 | |
AT | 15.09.2021 | ||
CY | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
MK | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
IE | 10.03.2022 | ||
LU | 10.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/20] | HU | 10.03.2009 | |
AT | 15.09.2021 | ||
CY | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
IE | 10.03.2022 | ||
LU | 10.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/18] | HU | 10.03.2009 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
IE | 10.03.2022 | ||
LU | 10.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/10] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
IE | 10.03.2022 | ||
LU | 10.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/09] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
IE | 10.03.2022 | ||
LU | 10.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/08] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
IE | 10.03.2022 | ||
LU | 10.03.2022 | ||
FR | 31.03.2022 | ||
Former [2023/06] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
FR | 31.03.2022 | ||
Former [2022/47] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/36] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/24] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/23] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
PL | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
PT | 17.01.2022 | ||
Former [2022/21] | AT | 15.09.2021 | |
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
Former [2022/12] | FI | 15.09.2021 | |
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
Former [2022/08] | FI | 15.09.2021 | |
LT | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
Former [2022/07] | LT | 15.09.2021 | |
NO | 15.12.2021 | Documents cited: | Search | [X]US2004047348 (O'NEILL ALAN [AU]) [X] 1-9 * abstract * * paragraphs [0021] - [0039]; figures 1,2,8 *; | [X]WO2006071474 (UTSTARCOM INC [US], et al) [X] 1-9 * abstract * * page 3, line 1 - line 21; figure 4 *; | [X]WO2007047145 (QUALCOMM FLARION TECH [US], et al) [X] 1-9 * abstract * * paragraphs [0054] - [0061] - [0072]; figure 6 *; | [A] - PERKINS C, "RFC - 3344 IP Mobility Support for IPv4", INTERNET CITATION, (200208), URL: http://tools.ietf.org/html/rfc3344, (20061205), XP002410440 [A] 1-9 * the whole document * | International search | [X]WO2007047145 (QUALCOMM FLARION TECH [US], et al); | [X]JP2004241895 (MOTOROLA INC); | [A]JP2003534719 (MOTOROLA, INC.) | Examination | US2003088765 | US6987771 | WO2006010382 | by applicant | JP3972880B | - "IP Mobility support for IPv4", RFC3344, (20080117), URL: http://www.ietf.org/rfc/rfc3344 | - WIMAX FORUM/3GPP2 PROXY MOBILE IPV4, (20070920), URL: http://tools.ietf.org/html/draft-leung-mip4-proxy-mode-4 |