blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2257408

EP2257408 - METHOD FOR PRODUCING A ONE-PIECE BLADED DISC, WITH TEMPORARY BLADE-SUPPORTING RING WHICH IS REMOVED AFTER A FINISH-MILLING STEP [Right-click to bookmark this link]
Former [2010/49]IMPROVED METHOD FOR PRODUCING A ONE-PIECE BLADED DISC, WITH TEMPORARY BLADE-SUPPORTING RING WHICH IS REMOVED AFTER A FINISH-MILLING STEP
[2016/15]
StatusNo opposition filed within time limit
Status updated on  14.07.2017
Database last updated on 03.09.2024
Most recent event   Tooltip06.03.2020Lapse of the patent in a contracting state
New state(s): TR
published on 08.04.2020  [2020/15]
Applicant(s)For all designated states
Snecma
2 Bld du Général Martial Valin
75015 Paris / FR
[2016/36]
Former [2010/49]For all designated states
Snecma
2 Bld du General Martial Valin
75015 Paris / FR
Inventor(s)01 / BERLANGER, Serge
7 rue des Vignes
F-91310 Leuville Sur Orge / FR
02 / BORDU, Sébastien
Résidence Le Prés Leroy
Rue de Cossigny
F-77170 Brie Comte Robert / FR
03 / MALEVILLE, Thierry, Jean
9 route de Boutigny
Ste Blaise
F-91490 Milly La Foret / FR
04 / ROCA, Christophe, Charles, Maurice
2 Square Ludvig Van Beethoven
F-91450 Soisy Sur Seine / FR
 [2016/36]
Former [2010/49]01 / BERLANGER, Serge
7 rue des Vignes
F-91310 Leuville Sur Orge / FR
02 / BORDU, Sébastien
Résidence Le Prés Leroy Rue de Cossigny
F-77170 Brie Comte Robert / FR
03 / MALEVILLE, Thierry, Jean
9 route de Boutigny Ste Blaise
F-91490 Milly La Foret / FR
04 / ROCA, Christophe, Charles, Maurice
2 Square Ludvig Van Beethoven
F-91450 Soisy Sur Seine / FR
Representative(s)Ilgart, Jean-Christophe, et al
BREVALEX
95, Rue d'Amsterdam
75378 Paris Cedex 8 / FR
[N/P]
Former [2016/36]Ilgart, Jean-Christophe, et al
BREVALEX
95, rue d'Amsterdam
75378 Paris Cedex 8 / FR
Former [2010/49]Ilgart, Jean-Christophe, et al
BREVALEX 3, rue du Docteur Lancereaux
75008 Paris / FR
Application number, filing date09727744.625.03.2009
[2010/49]
WO2009EP53497
Priority number, dateFR2008005207531.03.2008         Original published format: FR 0852075
[2010/49]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2009121768
Date:08.10.2009
Language:FR
[2009/41]
Type: A1 Application with search report 
No.:EP2257408
Date:08.12.2010
Language:FR
The application published by WIPO in one of the EPO official languages on 08.10.2009 takes the place of the publication of the European patent application.
[2010/49]
Type: B1 Patent specification 
No.:EP2257408
Date:07.09.2016
Language:FR
[2016/36]
Search report(s)International search report - published on:EP08.10.2009
ClassificationIPC:B23P13/02, B23P15/00, B23C3/18, B23Q11/00, B24C1/04, F01D5/34, B24C1/08
[2016/15]
CPC:
B23P13/02 (EP,US); B23C3/18 (EP,US); B23P15/006 (EP,US);
B24C1/045 (EP,US); B24C1/086 (EP,US); F01D5/34 (EP,US);
B23C2220/28 (EP,US); B23C2220/60 (EP,US); F05D2230/10 (EP,US);
Y10T29/49316 (EP,US); Y10T29/4932 (EP,US); Y10T29/49325 (EP,US);
Y10T29/49336 (EP,US) (-)
Former IPC [2010/49]B23P13/02, B23P15/00, B23C3/18, B23Q11/00, B24C1/04, F01D5/34
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2016/36]
Former [2010/49]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINER EINTEILIGEN SCHAUFELSCHEIBE MIT TEMPORÄREM SCHAUFELSTÜTZRING, DER VOR EINEM SCHLICHTFRÄSSCHRITT ENTFERNT WIRD[2016/15]
English:METHOD FOR PRODUCING A ONE-PIECE BLADED DISC, WITH TEMPORARY BLADE-SUPPORTING RING WHICH IS REMOVED AFTER A FINISH-MILLING STEP[2016/15]
French:PROCÉDÉ DE FABRICATION D'UN DISQUE AUBAGÉ MONOBLOC, AVEC ANNEAU PROVISOIRE DE MAINTIEN DES AUBES RETIRÉ APRÈS UNE ÉTAPE DE FINITION PAR FRAISAGE[2016/15]
Former [2010/49]VERBESSERTES VERFAHREN ZUR HERSTELLUNG EINER EINTEILIGEN SCHAUFELSCHEIBE MIT TEMPORÄREM SCHAUFELSTÜTZRING, DER VOR EINEM LACKFRÄSUNGSSCHRITT ENTFERNT WIRD
Former [2010/49]IMPROVED METHOD FOR PRODUCING A ONE-PIECE BLADED DISC, WITH TEMPORARY BLADE-SUPPORTING RING WHICH IS REMOVED AFTER A FINISH-MILLING STEP
Former [2010/49]PROCEDE AMELIORE DE FABRICATION D'UN DISQUE AUBAGE MONOBLOC, AVEC ANNEAU PROVISOIRE DE MAINTIEN DES AUBES RETIRE APRES UNE ETAPE DE FINITION PAR FRAISAGE
Entry into regional phase23.09.2010National basic fee paid 
23.09.2010Designation fee(s) paid 
23.09.2010Examination fee paid 
Examination procedure23.09.2010Examination requested  [2010/49]
01.04.2016Communication of intention to grant the patent
29.07.2016Fee for grant paid
29.07.2016Fee for publishing/printing paid
29.07.2016Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  01.04.2016
Opposition(s)08.06.2017No opposition filed within time limit [2017/33]
Fees paidRenewal fee
28.03.2011Renewal fee patent year 03
26.03.2012Renewal fee patent year 04
26.03.2013Renewal fee patent year 05
25.03.2014Renewal fee patent year 06
24.03.2015Renewal fee patent year 07
23.03.2016Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.03.2009
AT07.09.2016
CY07.09.2016
CZ07.09.2016
DK07.09.2016
EE07.09.2016
ES07.09.2016
FI07.09.2016
HR07.09.2016
LT07.09.2016
LV07.09.2016
MC07.09.2016
MK07.09.2016
MT07.09.2016
NL07.09.2016
PL07.09.2016
RO07.09.2016
SI07.09.2016
SK07.09.2016
TR07.09.2016
BG07.12.2016
NO07.12.2016
GR08.12.2016
IS07.01.2017
PT09.01.2017
IE25.03.2017
LU25.03.2017
BE31.03.2017
CH31.03.2017
LI31.03.2017
[2020/15]
Former [2019/51]HU25.03.2009
AT07.09.2016
CY07.09.2016
CZ07.09.2016
DK07.09.2016
EE07.09.2016
ES07.09.2016
FI07.09.2016
HR07.09.2016
LT07.09.2016
LV07.09.2016
MC07.09.2016
MK07.09.2016
MT07.09.2016
NL07.09.2016
PL07.09.2016
RO07.09.2016
SI07.09.2016
SK07.09.2016
BG07.12.2016
NO07.12.2016
GR08.12.2016
IS07.01.2017
PT09.01.2017
IE25.03.2017
LU25.03.2017
BE31.03.2017
CH31.03.2017
LI31.03.2017
Former [2019/46]HU25.03.2009
AT07.09.2016
CY07.09.2016
CZ07.09.2016
DK07.09.2016
EE07.09.2016
ES07.09.2016
FI07.09.2016
HR07.09.2016
LT07.09.2016
LV07.09.2016
MC07.09.2016
MT07.09.2016
NL07.09.2016
PL07.09.2016
RO07.09.2016
SI07.09.2016
SK07.09.2016
BG07.12.2016
NO07.12.2016
GR08.12.2016
IS07.01.2017
PT09.01.2017
IE25.03.2017
LU25.03.2017
BE31.03.2017
CH31.03.2017
LI31.03.2017
Former [2019/31]HU25.03.2009
AT07.09.2016
CZ07.09.2016
DK07.09.2016
EE07.09.2016
ES07.09.2016
FI07.09.2016
HR07.09.2016
LT07.09.2016
LV07.09.2016
MC07.09.2016
MT07.09.2016
NL07.09.2016
PL07.09.2016
RO07.09.2016
SI07.09.2016
SK07.09.2016
BG07.12.2016
NO07.12.2016
GR08.12.2016
IS07.01.2017
PT09.01.2017
IE25.03.2017
LU25.03.2017
BE31.03.2017
CH31.03.2017
LI31.03.2017
Former [2018/43]AT07.09.2016
CZ07.09.2016
DK07.09.2016
EE07.09.2016
ES07.09.2016
FI07.09.2016
HR07.09.2016
LT07.09.2016
LV07.09.2016
MC07.09.2016
MT07.09.2016
NL07.09.2016
PL07.09.2016
RO07.09.2016
SI07.09.2016
SK07.09.2016
BG07.12.2016
NO07.12.2016
GR08.12.2016
IS07.01.2017
PT09.01.2017
IE25.03.2017
LU25.03.2017
BE31.03.2017
CH31.03.2017
LI31.03.2017
Former [2018/24]AT07.09.2016
CZ07.09.2016
DK07.09.2016
EE07.09.2016
ES07.09.2016
FI07.09.2016
HR07.09.2016
LT07.09.2016
LV07.09.2016
MC07.09.2016
NL07.09.2016
PL07.09.2016
RO07.09.2016
SI07.09.2016
SK07.09.2016
BG07.12.2016
NO07.12.2016
GR08.12.2016
IS07.01.2017
PT09.01.2017
IE25.03.2017
LU25.03.2017
BE31.03.2017
CH31.03.2017
LI31.03.2017
Former [2018/13]AT07.09.2016
CZ07.09.2016
DK07.09.2016
EE07.09.2016
ES07.09.2016
FI07.09.2016
HR07.09.2016
LT07.09.2016
LV07.09.2016
MC07.09.2016
NL07.09.2016
PL07.09.2016
RO07.09.2016
SI07.09.2016
SK07.09.2016
BG07.12.2016
NO07.12.2016
GR08.12.2016
IS07.01.2017
PT09.01.2017
IE25.03.2017
LU25.03.2017
CH31.03.2017
LI31.03.2017
Former [2018/10]AT07.09.2016
CZ07.09.2016
DK07.09.2016
EE07.09.2016
ES07.09.2016
FI07.09.2016
HR07.09.2016
LT07.09.2016
LV07.09.2016
MC07.09.2016
NL07.09.2016
PL07.09.2016
RO07.09.2016
SI07.09.2016
SK07.09.2016
BG07.12.2016
NO07.12.2016
GR08.12.2016
IS07.01.2017
PT09.01.2017
LU25.03.2017
Former [2018/01]AT07.09.2016
CZ07.09.2016
DK07.09.2016
EE07.09.2016
ES07.09.2016
FI07.09.2016
HR07.09.2016
LT07.09.2016
LV07.09.2016
MC07.09.2016
NL07.09.2016
PL07.09.2016
RO07.09.2016
SI07.09.2016
SK07.09.2016
BG07.12.2016
NO07.12.2016
GR08.12.2016
IS07.01.2017
PT09.01.2017
Former [2017/37]AT07.09.2016
CZ07.09.2016
DK07.09.2016
EE07.09.2016
ES07.09.2016
FI07.09.2016
HR07.09.2016
LT07.09.2016
LV07.09.2016
NL07.09.2016
PL07.09.2016
RO07.09.2016
SI07.09.2016
SK07.09.2016
BG07.12.2016
NO07.12.2016
GR08.12.2016
IS07.01.2017
PT09.01.2017
Former [2017/34]AT07.09.2016
CZ07.09.2016
DK07.09.2016
EE07.09.2016
ES07.09.2016
FI07.09.2016
HR07.09.2016
LT07.09.2016
LV07.09.2016
NL07.09.2016
PL07.09.2016
RO07.09.2016
SK07.09.2016
BG07.12.2016
NO07.12.2016
GR08.12.2016
IS07.01.2017
PT09.01.2017
Former [2017/32]AT07.09.2016
CZ07.09.2016
EE07.09.2016
ES07.09.2016
FI07.09.2016
HR07.09.2016
LT07.09.2016
LV07.09.2016
NL07.09.2016
PL07.09.2016
RO07.09.2016
SK07.09.2016
BG07.12.2016
NO07.12.2016
GR08.12.2016
IS07.01.2017
PT09.01.2017
Former [2017/13]ES07.09.2016
FI07.09.2016
HR07.09.2016
LT07.09.2016
LV07.09.2016
NL07.09.2016
NO07.12.2016
GR08.12.2016
Former [2017/11]ES07.09.2016
FI07.09.2016
HR07.09.2016
LT07.09.2016
NO07.12.2016
GR08.12.2016
Former [2017/10]FI07.09.2016
HR07.09.2016
LT07.09.2016
NO07.12.2016
Former [2017/09]FI07.09.2016
LT07.09.2016
NO07.12.2016
Former [2017/07]LT07.09.2016
Cited inInternational search[A]EP1285714  (SNECMA MOTEURS [FR]) [A] 1-11 * paragraph [0015] - paragraph [0022]; figure - *;
 [A]EP1502682  (MTU AERO ENGINES GMBH [DE]) [A] 1,6-11 * paragraph [0003] - paragraph [0005]; figure - *;
 [A]US6276899  (LAMBERT TOM [US], et al) [A] 1 * column 3, line 21 - line 28; figure -; claims 1,2 *;
 [A]FR2699850  (SNECMA [FR], et al) [A] 1 * page 1, line 33 - page 2, line 7; figure - *;
 [A]WO2007082504  (MTU AERO ENGINES GMBH [DE], et al) [A] 1-11 * claim - *;
 [A]US5867885  (BALES DANIEL A [US], et al) [A] 1-11 * figure -; claim - *;
 [A]EP1433557  (GEN ELECTRIC [US]) [A] 1 * abstract *
ExaminationEP1652611
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.