| EP2263171 - HARDWARE INTERFACE FOR ENABLING DIRECT ACCESS AND SECURITY ASSESSMENT SHARING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.07.2021 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 24.07.2020 | ||
| Former | Grant of patent is intended Status updated on 05.04.2020 | ||
| Former | Examination is in progress Status updated on 20.04.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Microsoft Technology Licensing, LLC One Microsoft Way Redmond, WA 98052 / US | [2015/12] |
| Former [2010/51] | For all designated states Microsoft Corporation One Microsoft Way Redmond, WA 98052-6399 / US | Inventor(s) | 01 /
NICE, Nir One Microsoft Way Redmond Washington 98052-6399 / US | 02 /
WALKER, Lee, F. One Microsoft Way Redmond Washington 98052-6399 / US | [2010/51] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2020/35] |
| Former [2010/51] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät Leopoldstrasse 4 80802 München / DE | Application number, filing date | 09728663.7 | 06.03.2009 | [2010/51] | WO2009US36410 | Priority number, date | US20080042691P | 04.04.2008 Original published format: US 42691 P | US20080144863 | 24.06.2008 Original published format: US 144863 | [2010/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009123826 | Date: | 08.10.2009 | Language: | EN | [2009/41] | Type: | A1 Application with search report | No.: | EP2263171 | Date: | 22.12.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.10.2009 takes the place of the publication of the European patent application. | [2010/51] | Type: | B1 Patent specification | No.: | EP2263171 | Date: | 26.08.2020 | Language: | EN | [2020/35] | Search report(s) | International search report - published on: | KR | 08.10.2009 | (Supplementary) European search report - dispatched on: | EP | 21.03.2016 | Classification | IPC: | H04L29/06 | [2020/15] | CPC: |
H04L63/0485 (EP,US)
|
| Former IPC [2016/16] | G06F17/28, H04L29/06 | ||
| Former IPC [2010/51] | G06F17/28 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2020/35] |
| Former [2010/51] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | HARDWARE-SCHNITTSTELLE FÜR DIREKTZUGANGSAKTIVIERUNG UND GEMEINSAME SICHERHEITSBEWERTUNG | [2010/51] | English: | HARDWARE INTERFACE FOR ENABLING DIRECT ACCESS AND SECURITY ASSESSMENT SHARING | [2010/51] | French: | INTERFACE MATÉRIELLE POUR PERMETTRE L'ACCÈS DIRECT ET LE PARTAGE DES VÉRIFICATIONS DE SÉCURITÉ | [2010/51] | Entry into regional phase | 04.10.2010 | National basic fee paid | 04.10.2010 | Search fee paid | 04.10.2010 | Designation fee(s) paid | 04.10.2010 | Examination fee paid | Examination procedure | 04.10.2010 | Examination requested [2010/51] | 21.09.2016 | Amendment by applicant (claims and/or description) | 23.04.2018 | Despatch of a communication from the examining division (Time limit: M04) | 31.08.2018 | Reply to a communication from the examining division | 06.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 24.06.2019 | Reply to a communication from the examining division | 25.10.2019 | Despatch of a communication from the examining division (Time limit: M04) | 27.11.2019 | Reply to a communication from the examining division | 06.04.2020 | Communication of intention to grant the patent | 16.07.2020 | Fee for grant paid | 16.07.2020 | Fee for publishing/printing paid | 16.07.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.04.2018 | Opposition(s) | 27.05.2021 | No opposition filed within time limit [2021/31] | Fees paid | Renewal fee | 15.03.2011 | Renewal fee patent year 03 | 14.03.2012 | Renewal fee patent year 04 | 08.03.2013 | Renewal fee patent year 05 | 10.03.2014 | Renewal fee patent year 06 | 06.03.2015 | Renewal fee patent year 07 | 10.03.2016 | Renewal fee patent year 08 | 10.03.2017 | Renewal fee patent year 09 | 13.03.2018 | Renewal fee patent year 10 | 13.03.2019 | Renewal fee patent year 11 | 12.03.2020 | Renewal fee patent year 12 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.03.2009 | AT | 26.08.2020 | CY | 26.08.2020 | CZ | 26.08.2020 | DK | 26.08.2020 | EE | 26.08.2020 | ES | 26.08.2020 | FI | 26.08.2020 | HR | 26.08.2020 | IT | 26.08.2020 | LT | 26.08.2020 | LV | 26.08.2020 | MC | 26.08.2020 | MK | 26.08.2020 | MT | 26.08.2020 | NL | 26.08.2020 | PL | 26.08.2020 | RO | 26.08.2020 | SE | 26.08.2020 | SI | 26.08.2020 | SK | 26.08.2020 | TR | 26.08.2020 | BG | 26.11.2020 | NO | 26.11.2020 | GR | 27.11.2020 | IS | 26.12.2020 | PT | 28.12.2020 | IE | 06.03.2021 | LU | 06.03.2021 | BE | 31.03.2021 | CH | 31.03.2021 | LI | 31.03.2021 | [2024/41] |
| Former [2024/29] | HU | 06.03.2009 | |
| AT | 26.08.2020 | ||
| CY | 26.08.2020 | ||
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| ES | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| IT | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| MC | 26.08.2020 | ||
| MK | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| TR | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| IE | 06.03.2021 | ||
| LU | 06.03.2021 | ||
| BE | 31.03.2021 | ||
| CH | 31.03.2021 | ||
| LI | 31.03.2021 | ||
| Former [2024/22] | HU | 06.03.2009 | |
| AT | 26.08.2020 | ||
| CY | 26.08.2020 | ||
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| ES | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| IT | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| MC | 26.08.2020 | ||
| MK | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| IE | 06.03.2021 | ||
| LU | 06.03.2021 | ||
| BE | 31.03.2021 | ||
| CH | 31.03.2021 | ||
| LI | 31.03.2021 | ||
| Former [2023/27] | HU | 06.03.2009 | |
| AT | 26.08.2020 | ||
| CY | 26.08.2020 | ||
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| ES | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| IT | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| MC | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| IE | 06.03.2021 | ||
| LU | 06.03.2021 | ||
| BE | 31.03.2021 | ||
| CH | 31.03.2021 | ||
| LI | 31.03.2021 | ||
| Former [2023/24] | AT | 26.08.2020 | |
| CY | 26.08.2020 | ||
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| ES | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| IT | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| MC | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| IE | 06.03.2021 | ||
| LU | 06.03.2021 | ||
| BE | 31.03.2021 | ||
| CH | 31.03.2021 | ||
| LI | 31.03.2021 | ||
| Former [2022/34] | AT | 26.08.2020 | |
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| ES | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| IT | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| MC | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| IE | 06.03.2021 | ||
| LU | 06.03.2021 | ||
| BE | 31.03.2021 | ||
| CH | 31.03.2021 | ||
| LI | 31.03.2021 | ||
| Former [2022/11] | AT | 26.08.2020 | |
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| ES | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| IT | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| MC | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| IE | 06.03.2021 | ||
| LU | 06.03.2021 | ||
| CH | 31.03.2021 | ||
| LI | 31.03.2021 | ||
| Former [2022/09] | AT | 26.08.2020 | |
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| ES | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| IT | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| MC | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| IE | 06.03.2021 | ||
| LU | 06.03.2021 | ||
| Former [2022/07] | AT | 26.08.2020 | |
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| ES | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| IT | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| MC | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| IE | 06.03.2021 | ||
| Former [2021/45] | AT | 26.08.2020 | |
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| ES | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| IT | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| MC | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/36] | AT | 26.08.2020 | |
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| ES | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| IT | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/34] | AT | 26.08.2020 | |
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| ES | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| IT | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/28] | AT | 26.08.2020 | |
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| ES | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/25] | AT | 26.08.2020 | |
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| ES | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/24] | AT | 26.08.2020 | |
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/22] | CZ | 26.08.2020 | |
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/20] | DK | 26.08.2020 | |
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/12] | FI | 26.08.2020 | |
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/10] | FI | 26.08.2020 | |
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/09] | FI | 26.08.2020 | |
| LT | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/08] | FI | 26.08.2020 | |
| LT | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/07] | FI | 26.08.2020 | |
| LT | 26.08.2020 | ||
| NO | 26.11.2020 | Documents cited: | Search | [A] US2002162026 (NEUMAN MICHAEL et al.) [A] 1-15 * paragraph [0029] - paragraph [0040] * * paragraph [0056] - paragraph [0058] * * paragraph [0080] - paragraph [0081]; figure 6A * | [A] KR20070121323 (UNIV KYUNG HEE UNIV IND COOP GROUP et al.) [A] 1-15 * abstract * | International search | [A] KR20070121323 (UNIV KYUNG HEE UNIV IND COOP GROUP et al.) [A] | [A] US6795917 (YLONEN TATU et al.) [A] | [A] US6708219 (BORELLA MICHAEL S et al.) [A] | Examination | US2006253701 | US2005010821 | WO02097587 | US2006031938 | by applicant | US2002162026 | KR20070121323 |