EP2356460 - METHOD FOR PREDICTION OF THE PROGRESSION RISK OF TUMORS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.11.2018 Database last updated on 04.11.2024 | |
Former | The patent has been granted Status updated on 22.12.2017 | ||
Former | Grant of patent is intended Status updated on 15.12.2017 | ||
Former | Examination is in progress Status updated on 25.10.2017 | ||
Former | Grant of patent is intended Status updated on 19.06.2017 | ||
Former | Examination is in progress Status updated on 01.03.2017 | Most recent event Tooltip | 26.06.2020 | Lapse of the patent in a contracting state New state(s): MK | published on 29.07.2020 [2020/31] | Applicant(s) | For all designated states Ventana Medical Systems, Inc. 1910 E. Innovation Park Drive Tucson, Arizona 85755 / US | [2018/03] |
Former [2015/32] | For all designated states Ventana Medical Systems, Inc. 1910 Innovation Park Drive Tucson AZ 85755 / US | ||
Former [2011/33] | For all designated states MTM Laboratories AG Im Neuenheimer Feld 583 69120 Heidelberg / DE | Inventor(s) | 01 /
MARTIN, Peter Buchensteige 4 69251 Gaiberg / DE | 02 /
RIDDER, Rüdiger Untere Kippstrasse 5b 69198 Schriesheim / DE | [2011/33] | Representative(s) | Göhring, Frank Roche Diagnostics GmbH Patent Department (LPP.....6164) P.O. Box 11 52 82372 Penzberg / DE | [2013/07] |
Former [2011/33] | Martin, Peter mtm laboratories AG Im Neuenheimer Feld 583 69120 Heidelberg / DE | Application number, filing date | 09736808.8 | 04.09.2009 | [2011/33] | WO2009EP06415 | Priority number, date | EP20080105235 | 04.09.2008 Original published format: EP 08105235 | [2011/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010025928 | Date: | 11.03.2010 | Language: | EN | [2010/10] | Type: | A1 Application with search report | No.: | EP2356460 | Date: | 17.08.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.03.2010 takes the place of the publication of the European patent application. | [2011/33] | Type: | B1 Patent specification | No.: | EP2356460 | Date: | 24.01.2018 | Language: | EN | [2018/04] | Search report(s) | International search report - published on: | EP | 11.03.2010 | Classification | IPC: | G01N33/574 | [2011/33] | CPC: |
G01N33/57415 (EP,US);
C12Q1/6886 (EP,US);
G01N33/57496 (EP,US);
C12Q2600/118 (EP,US);
G01N2333/4704 (US);
G01N2333/4706 (US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2018/04] |
Former [2011/33] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN ZUR VORHERSAGE DER GEFAHR DES FORTSCHREITENS VON TUMOREN | [2011/33] | English: | METHOD FOR PREDICTION OF THE PROGRESSION RISK OF TUMORS | [2011/33] | French: | PROCÉDÉ DE PRÉDICTION DU RISQUE DE PROGRESSION DE TUMEURS | [2011/33] | Entry into regional phase | 28.03.2011 | National basic fee paid | 28.03.2011 | Designation fee(s) paid | 18.05.2011 | Examination fee paid | Examination procedure | 11.05.2011 | Despatch of communication that the application is deemed to be withdrawn, reason: filing fee / search fee not paid in time | 18.05.2011 | Examination requested [2011/33] | 03.06.2011 | Amendment by applicant (claims and/or description) | 10.09.2012 | Despatch of a communication from the examining division (Time limit: M04) | 18.12.2012 | Reply to a communication from the examining division | 27.05.2014 | Despatch of a communication from the examining division (Time limit: M06) | 11.11.2014 | Reply to a communication from the examining division | 20.02.2017 | Despatch of a communication from the examining division (Time limit: M04) | 03.04.2017 | Reply to a communication from the examining division | 03.05.2017 | Despatch of a communication from the examining division (Time limit: M02) | 08.05.2017 | Reply to a communication from the examining division | 20.06.2017 | Communication of intention to grant the patent | 17.10.2017 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 18.10.2017 | Fee for grant paid | 18.10.2017 | Fee for publishing/printing paid | 15.12.2017 | Information about intention to grant a patent | 15.12.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.09.2012 | Opposition(s) | 25.10.2018 | No opposition filed within time limit [2019/01] | Request for further processing for: | The application is deemed to be withdrawn due to non-payment of the examination fee | 18.05.2011 | Request for further processing filed | 18.05.2011 | Full payment received (date of receipt of payment) Request granted | 12.07.2011 | Decision despatched | Fees paid | Renewal fee | 10.11.2011 | Renewal fee patent year 03 | 12.11.2012 | Renewal fee patent year 04 | 09.09.2013 | Renewal fee patent year 05 | 08.09.2014 | Renewal fee patent year 06 | 08.09.2015 | Renewal fee patent year 07 | 08.09.2016 | Renewal fee patent year 08 | 11.09.2017 | Renewal fee patent year 09 | Penalty fee | Additional fee for renewal fee | 30.09.2011 | 03   M06   Fee paid on   10.11.2011 | 30.09.2012 | 04   M06   Fee paid on   12.11.2012 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.09.2009 | AT | 24.01.2018 | CY | 24.01.2018 | CZ | 24.01.2018 | EE | 24.01.2018 | FI | 24.01.2018 | HR | 24.01.2018 | LT | 24.01.2018 | LV | 24.01.2018 | MC | 24.01.2018 | MK | 24.01.2018 | NL | 24.01.2018 | PL | 24.01.2018 | PT | 24.01.2018 | RO | 24.01.2018 | SE | 24.01.2018 | SI | 24.01.2018 | SK | 24.01.2018 | SM | 24.01.2018 | TR | 24.01.2018 | BG | 24.04.2018 | NO | 24.04.2018 | GR | 25.04.2018 | IS | 24.05.2018 | IE | 04.09.2018 | LU | 04.09.2018 | MT | 04.09.2018 | BE | 30.09.2018 | [2020/31] |
Former [2020/27] | HU | 04.09.2009 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
PT | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
IE | 04.09.2018 | ||
LU | 04.09.2018 | ||
MT | 04.09.2018 | ||
BE | 30.09.2018 | ||
Former [2020/16] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
IE | 04.09.2018 | ||
LU | 04.09.2018 | ||
MT | 04.09.2018 | ||
BE | 30.09.2018 | ||
Former [2020/08] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
IE | 04.09.2018 | ||
LU | 04.09.2018 | ||
MT | 04.09.2018 | ||
BE | 30.09.2018 | ||
Former [2019/38] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
IE | 04.09.2018 | ||
LU | 04.09.2018 | ||
BE | 30.09.2018 | ||
Former [2019/33] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
IE | 04.09.2018 | ||
LU | 04.09.2018 | ||
Former [2019/30] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
LU | 04.09.2018 | ||
Former [2019/24] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2019/13] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/52] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/50] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/49] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
EE | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/40] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/39] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
SE | 24.01.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/37] | CY | 24.01.2018 | |
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
Former [2018/36] | CY | 24.01.2018 | |
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
NO | 24.04.2018 | ||
Former [2018/35] | CY | 24.01.2018 | |
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
NO | 24.04.2018 | ||
Former [2018/34] | FI | 24.01.2018 | |
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
NO | 24.04.2018 | Cited in | International search | [X]EP1507148 (MTM LAB AG [DE]) [X] 1-7 * abstract * * paragraph [0013] *; | [X]EP1510820 (MTM LAB AG [DE]) [X] 1-15 * abstract ** paragraphs [0024] , [0 93] , [0 94] , [0 98] * |