EP2288990 - SCHEDULING COLLECTIONS IN A SCHEDULER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.07.2019 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 03.08.2018 | ||
Former | Grant of patent is intended Status updated on 10.04.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Microsoft Technology Licensing, LLC One Microsoft Way Redmond, WA 98052 / US | [2015/12] |
Former [2011/09] | For all designated states Microsoft Corporation One Microsoft Way Redmond, WA 98052-6399 / US | Inventor(s) | 01 /
RINGSETH, Paul, F. One Microsoft Way Redmond WA 98052-6399 / US | 02 /
FERNANDES, Genevieve One Microsoft Way Redmond Washington 98052-6399 / US | 03 /
GUSTAFSSON, Niklas One Microsoft Way Redmond Washington 98052-6399 / US | 04 /
MOLLOY, Rick One Microsoft Way Redmond Washington 98052-6399 / US | [2011/09] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2018/36] |
Former [2011/09] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät Leopoldstrasse 4 80802 München / DE | Application number, filing date | 09747052.0 | 27.03.2009 | [2011/09] | WO2009US38658 | Priority number, date | US20080121794 | 16.05.2008 Original published format: US 121794 | [2011/09] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009139966 | Date: | 19.11.2009 | Language: | EN | [2009/47] | Type: | A1 Application with search report | No.: | EP2288990 | Date: | 02.03.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.11.2009 takes the place of the publication of the European patent application. | [2011/09] | Type: | B1 Patent specification | No.: | EP2288990 | Date: | 05.09.2018 | Language: | EN | [2018/36] | Search report(s) | International search report - published on: | KR | 19.11.2009 | (Supplementary) European search report - dispatched on: | EP | 24.08.2016 | Classification | IPC: | G06F9/46, G06F9/48 | [2016/23] | CPC: |
G06F9/4881 (EP,US);
G06F2209/483 (EP,US)
|
Former IPC [2011/09] | G06F9/46, G06F9/06, G06F13/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/36] |
Former [2011/09] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | PLANUNG VON SAMMLUNGEN BEI EINEM PLANER | [2011/09] | English: | SCHEDULING COLLECTIONS IN A SCHEDULER | [2011/09] | French: | ENSEMBLES DE PROGRAMMATION DANS UN PROGRAMMATEUR | [2011/09] | Entry into regional phase | 15.11.2010 | National basic fee paid | 15.11.2010 | Search fee paid | 15.11.2010 | Designation fee(s) paid | 15.11.2010 | Examination fee paid | Examination procedure | 15.11.2010 | Examination requested [2011/09] | 27.10.2016 | Amendment by applicant (claims and/or description) | 11.04.2018 | Communication of intention to grant the patent | 25.07.2018 | Fee for grant paid | 25.07.2018 | Fee for publishing/printing paid | 25.07.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.04.2018 | Opposition(s) | 06.06.2019 | No opposition filed within time limit [2019/33] | Fees paid | Renewal fee | 15.03.2011 | Renewal fee patent year 03 | 14.03.2012 | Renewal fee patent year 04 | 08.03.2013 | Renewal fee patent year 05 | 10.03.2014 | Renewal fee patent year 06 | 06.03.2015 | Renewal fee patent year 07 | 10.03.2016 | Renewal fee patent year 08 | 10.03.2017 | Renewal fee patent year 09 | 13.03.2018 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.03.2009 | AT | 05.09.2018 | CY | 05.09.2018 | CZ | 05.09.2018 | DK | 05.09.2018 | EE | 05.09.2018 | FI | 05.09.2018 | HR | 05.09.2018 | LT | 05.09.2018 | LV | 05.09.2018 | MC | 05.09.2018 | MK | 05.09.2018 | PL | 05.09.2018 | RO | 05.09.2018 | SE | 05.09.2018 | SI | 05.09.2018 | SK | 05.09.2018 | TR | 05.09.2018 | BG | 05.12.2018 | NO | 05.12.2018 | GR | 06.12.2018 | IS | 05.01.2019 | PT | 05.01.2019 | IE | 27.03.2019 | LU | 27.03.2019 | MT | 27.03.2019 | BE | 31.03.2019 | CH | 31.03.2019 | LI | 31.03.2019 | [2022/31] |
Former [2021/32] | HU | 27.03.2009 | |
AT | 05.09.2018 | ||
CY | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
IE | 27.03.2019 | ||
LU | 27.03.2019 | ||
MT | 27.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2021/26] | AT | 05.09.2018 | |
CY | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
IE | 27.03.2019 | ||
LU | 27.03.2019 | ||
MT | 27.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/29] | AT | 05.09.2018 | |
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
IE | 27.03.2019 | ||
LU | 27.03.2019 | ||
MT | 27.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/17] | AT | 05.09.2018 | |
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
IE | 27.03.2019 | ||
LU | 27.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/11] | AT | 05.09.2018 | |
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
IE | 27.03.2019 | ||
LU | 27.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/09] | AT | 05.09.2018 | |
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
IE | 27.03.2019 | ||
LU | 27.03.2019 | ||
Former [2020/01] | AT | 05.09.2018 | |
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
LU | 27.03.2019 | ||
Former [2019/46] | AT | 05.09.2018 | |
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/37] | AT | 05.09.2018 | |
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/34] | AT | 05.09.2018 | |
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/26] | AT | 05.09.2018 | |
CZ | 05.09.2018 | ||
EE | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/23] | AT | 05.09.2018 | |
CZ | 05.09.2018 | ||
EE | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/22] | CZ | 05.09.2018 | |
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/21] | FI | 05.09.2018 | |
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/12] | FI | 05.09.2018 | |
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/11] | FI | 05.09.2018 | |
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/10] | FI | 05.09.2018 | |
LT | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/08] | FI | 05.09.2018 | |
LT | 05.09.2018 | ||
NO | 05.12.2018 | ||
Former [2019/07] | LT | 05.09.2018 | Documents cited: | Search | [X]US2008066072 (YUREKLI SAVAS [TR], et al) [X] 1-8* paragraphs 17-43; 70;; figures 1-3 * | International search | [A]WO0201344 (KONINKL PHILIPS ELECTRONICS NV [NL], et al); | [A]US2003037091 (NISHIMURA KOZO [JP], et al); | [A]US2005149916 (SHPEISMAN TATIANA [US], et al); | [A]KR100538727B (TOSHIBA CO., LTD.); | [A]KR20070090649 (SAMSUNG ELECTRONICS CO LTD [KR]); | [A]US2008066072 (YUREKLI SAVAS [TR], et al) | by applicant | US2008066072 |