EP2297976 - PIEZOELECTRIC MEMS MICROPHONE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.08.2021 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 28.08.2020 | ||
Former | Grant of patent is intended Status updated on 28.04.2020 | ||
Former | Examination is in progress Status updated on 08.06.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states The Regents of the University of Michigan U-M Office of Technology Transfer 1600 Huron Parkway, 2nd Floor Ann Arbor, MI 48104-2590 / US | [2011/12] | Inventor(s) | 01 /
GROSH, Karl 2026 G.G. Brown Building 2350 Hayward Street Ann Arbor, MI 48109-2125 / US | 02 /
LITTRELL, Robert, J. 239 W Channel Rd Santa Monica CA 90402-1105 / US | [2020/40] |
Former [2011/17] | 01 /
GROSH, Karl 2026 G.G. Brown Building 2350 Hayward Street Ann Arbor, MI 48109-2125 / US | ||
02 /
LITTRELL, Robert, J. 239 W Channel Rd Santa Monica CA 90402-1105 / US | |||
Former [2011/12] | 01 /
GROSH, Karl 2026 G.G. Brown Building 2350 Hayward Street Ann Arbor, MI 48109-2125 / US | ||
02 /
LITTRELL, Robert, J. 1322 S Forest Ave Apt 2 Ann Arbor MI 48104 / US | Representative(s) | HGF HGF Limited 1 City Walk Leeds LS11 9DX / GB | [N/P] |
Former [2020/40] | HGF 1 City Walk Leeds LS11 9DX / GB | ||
Former [2014/07] | Barker, Rosemary Anne, et al Harrison Goddard Foote LLP 4th Floor, Merchant Exchange 17-19 Whitworth Street West Manchester M1 5WG / GB | ||
Former [2011/12] | Harrison Goddard Foote 4th Floor Merchant Exchange 17-19 Whitworth Street West Manchester M1 5WG / GB | Application number, filing date | 09774338.9 | 30.06.2009 | [2011/12] | WO2009US49248 | Priority number, date | US20080076928P | 30.06.2008 Original published format: US 76928 P | [2011/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2010002887 | Date: | 07.01.2010 | Language: | EN | [2010/01] | Type: | A2 Application without search report | No.: | EP2297976 | Date: | 23.03.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.01.2010 takes the place of the publication of the European patent application. | [2011/12] | Type: | B1 Patent specification | No.: | EP2297976 | Date: | 30.09.2020 | Language: | EN | [2020/40] | Search report(s) | International search report - published on: | KR | 08.04.2010 | (Supplementary) European search report - dispatched on: | EP | 03.02.2014 | Classification | IPC: | H04R17/00, H04R17/02 | [2011/12] | CPC: |
H04R17/10 (EP);
H04R17/02 (EP,KR,US);
H10N30/50 (US);
B81B3/0021 (US);
B81C1/0015 (US);
B81C1/00158 (US);
H04R17/00 (EP,US);
H10N30/05 (US);
H10N30/302 (US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2020/40] |
Former [2011/12] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | PIEZOELEKTRISCHES MEMS-MIKROFON | [2011/12] | English: | PIEZOELECTRIC MEMS MICROPHONE | [2011/12] | French: | MICROPHONE PIÉZOÉLECTRIQUE EN TECHNOLOGIE MEMS | [2011/12] | Entry into regional phase | 23.12.2010 | National basic fee paid | 23.12.2010 | Search fee paid | 23.12.2010 | Designation fee(s) paid | 23.12.2010 | Examination fee paid | Examination procedure | 23.12.2010 | Examination requested [2011/12] | 01.09.2014 | Amendment by applicant (claims and/or description) | 12.06.2018 | Despatch of a communication from the examining division (Time limit: M06) | 21.12.2018 | Reply to a communication from the examining division | 30.03.2020 | Cancellation of oral proceeding that was planned for 05.05.2020 | 29.04.2020 | Communication of intention to grant the patent | 05.05.2020 | Date of oral proceedings (cancelled) | 19.08.2020 | Fee for grant paid | 19.08.2020 | Fee for publishing/printing paid | 19.08.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20199098.3 / EP3796671 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.06.2018 | Opposition(s) | 01.07.2021 | No opposition filed within time limit [2021/36] | Fees paid | Renewal fee | 27.06.2011 | Renewal fee patent year 03 | 26.06.2012 | Renewal fee patent year 04 | 27.06.2013 | Renewal fee patent year 05 | 30.06.2014 | Renewal fee patent year 06 | 29.06.2015 | Renewal fee patent year 07 | 27.06.2016 | Renewal fee patent year 08 | 27.06.2017 | Renewal fee patent year 09 | 27.06.2018 | Renewal fee patent year 10 | 27.06.2019 | Renewal fee patent year 11 | 22.06.2020 | Renewal fee patent year 12 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.06.2009 | AT | 30.09.2020 | CY | 30.09.2020 | CZ | 30.09.2020 | DK | 30.09.2020 | EE | 30.09.2020 | ES | 30.09.2020 | FI | 30.09.2020 | HR | 30.09.2020 | IT | 30.09.2020 | LT | 30.09.2020 | LV | 30.09.2020 | MC | 30.09.2020 | MK | 30.09.2020 | MT | 30.09.2020 | NL | 30.09.2020 | PL | 30.09.2020 | RO | 30.09.2020 | SE | 30.09.2020 | SI | 30.09.2020 | SK | 30.09.2020 | TR | 30.09.2020 | BG | 30.12.2020 | NO | 30.12.2020 | GR | 31.12.2020 | IS | 30.01.2021 | PT | 01.02.2021 | BE | 30.06.2021 | CH | 30.06.2021 | FR | 30.06.2021 | GB | 30.06.2021 | IE | 30.06.2021 | LI | 30.06.2021 | LU | 30.06.2021 | [2024/41] |
Former [2024/29] | HU | 30.06.2009 | |
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
MK | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
TR | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
GB | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
Former [2024/22] | HU | 30.06.2009 | |
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
MK | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
GB | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
Former [2023/29] | HU | 30.06.2009 | |
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
GB | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
Former [2023/24] | AT | 30.09.2020 | |
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
GB | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
Former [2022/34] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
GB | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
Former [2022/23] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
GB | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
Former [2022/22] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
CH | 30.06.2021 | ||
GB | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
Former [2022/21] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
CH | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
Former [2022/18] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
LU | 30.06.2021 | ||
Former [2022/10] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2022/08] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/50] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/48] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/37] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/28] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/25] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/24] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/22] | CZ | 30.09.2020 | |
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/21] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/20] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/10] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LV | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/08] | FI | 30.09.2020 | |
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
Former [2021/07] | FI | 30.09.2020 | |
NO | 30.12.2020 | Cited in | International search | [Y]KR20030075906 (SAMSUNG ELECTRONICS CO LTD [KR]); | [A]US6857501 (HAN CHEOL-HYUN [US], et al); | [A]US2005200242 (DEGERTEKIN F L [US]); | [A]US2007089516 (KHURI-YAKUB BUTRUS T [US], et al); | [A]KR20070098735 (TOSHIBA KK [JP]); | [X]US2007287233 (ZHAN CHANGQING [US], et al) | by applicant | US6857501 |