EP2332150 - A CHARGE TRANSFER ZERO LOSS POWER AND SIGNAL TRANSMISSION CABLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.04.2024 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 12.05.2023 | ||
Former | Grant of patent is intended Status updated on 26.10.2022 | ||
Former | Examination is in progress Status updated on 07.07.2017 | Most recent event Tooltip | 19.07.2024 | Lapse of the patent in a contracting state New state(s): CH | published on 21.08.2024 [2024/34] | Applicant(s) | For all designated states Enertechnos Limited 19 Kingsmill Business Park Chapel Mill Road Kingston Upon Thames, Surrey KT1 3GZ / GB | [2023/24] |
Former [2020/13] | For all designated states Capacitive Technologies Limited 19 Kingsmill Business Park Chapel Mill Road Surrey KT1 3GZ / GB | ||
Former [2011/24] | For all designated states Mantock, Paul Lenworth 95 Evergreen Way Hayes, Middlesex UB3 2BH / GB | Inventor(s) | 01 /
MANTOCK, Paul Lenwoth 95 Evergreen Way Hayes, Middlesex UB3 2BH / GB | [2023/24] |
Former [2011/24] | 01 /
see applicant ... | Representative(s) | Schlich, George William, et al Schlich 9 St. Catherine's Road Littlehampton, West Sussex BN17 5HS / GB | [N/P] |
Former [2023/24] | Schlich, George, et al Schlich 9 St Catherine's Road Littlehampton, West Sussex BN17 5HS / GB | Application number, filing date | 09785049.9 | 03.09.2009 | [2011/24] | WO2009GB02122 | Priority number, date | GB20080016106 | 04.09.2008 Original published format: GB 0816106 | [2011/24] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010026380 | Date: | 11.03.2010 | Language: | EN | [2010/10] | Type: | A1 Application with search report | No.: | EP2332150 | Date: | 15.06.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.03.2010 takes the place of the publication of the European patent application. | [2011/24] | Type: | B1 Patent specification | No.: | EP2332150 | Date: | 14.06.2023 | Language: | EN | [2023/24] | Search report(s) | International search report - published on: | EP | 11.03.2010 | Classification | IPC: | H01B7/30 | [2011/24] | CPC: |
H01B7/30 (EP,GB,KR,US);
H01B11/00 (GB,KR);
H01B7/04 (KR);
H01B9/00 (GB);
H01M10/46 (KR);
H02J7/0024 (KR);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2023/24] |
Former [2011/24] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | KABEL FÜR LADUNGSÜBERTRAGUNG MIT NULL VERLUSTLEISTUNG UND SIGNALÜBERTRAGUNG | [2011/24] | English: | A CHARGE TRANSFER ZERO LOSS POWER AND SIGNAL TRANSMISSION CABLE | [2011/24] | French: | CÂBLE DE TRANSMISSION DE SIGNAUX ET DE TRANSFERT DE CHARGE À PERTE DE PUISSANCE NULLE | [2011/24] | Entry into regional phase | 29.03.2011 | National basic fee paid | 29.03.2011 | Designation fee(s) paid | 29.03.2011 | Examination fee paid | Examination procedure | 04.04.2011 | Examination requested [2011/24] | 27.10.2011 | Amendment by applicant (claims and/or description) | 10.07.2017 | Despatch of a communication from the examining division (Time limit: M04) | 24.10.2017 | Reply to a communication from the examining division | 25.10.2019 | Despatch of a communication from the examining division (Time limit: M04) | 13.12.2019 | Reply to a communication from the examining division | 02.06.2020 | Despatch of a communication from the examining division (Time limit: M04) | 07.10.2020 | Reply to a communication from the examining division | 03.01.2022 | Despatch of a communication from the examining division (Time limit: M04) | 27.04.2022 | Reply to a communication from the examining division | 27.10.2022 | Communication of intention to grant the patent | 23.02.2023 | Fee for grant paid | 23.02.2023 | Fee for publishing/printing paid | 23.02.2023 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.07.2017 | Opposition(s) | 15.03.2024 | No opposition filed within time limit [2024/21] | Fees paid | Renewal fee | 18.10.2011 | Renewal fee patent year 03 | 28.03.2013 | Renewal fee patent year 04 | 25.03.2014 | Renewal fee patent year 05 | 16.09.2014 | Renewal fee patent year 06 | 28.08.2015 | Renewal fee patent year 07 | 22.08.2016 | Renewal fee patent year 08 | 01.09.2017 | Renewal fee patent year 09 | 24.08.2018 | Renewal fee patent year 10 | 09.09.2019 | Renewal fee patent year 11 | 21.09.2020 | Renewal fee patent year 12 | 15.09.2021 | Renewal fee patent year 13 | 24.08.2022 | Renewal fee patent year 14 | Penalty fee | Additional fee for renewal fee | 30.09.2011 | 03   M06   Fee paid on   18.10.2011 | 30.09.2012 | 04   M06   Fee paid on   28.03.2013 | 30.09.2013 | 05   M06   Fee paid on   25.03.2014 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 14.06.2023 | ES | 14.06.2023 | HR | 14.06.2023 | MC | 14.06.2023 | PL | 14.06.2023 | RO | 14.06.2023 | SK | 14.06.2023 | SM | 14.06.2023 | IE | 03.09.2023 | NO | 14.09.2023 | CH | 30.09.2023 | IS | 14.10.2023 | [2024/34] |
Former [2024/33] | CZ | 14.06.2023 | |
ES | 14.06.2023 | ||
HR | 14.06.2023 | ||
MC | 14.06.2023 | ||
PL | 14.06.2023 | ||
RO | 14.06.2023 | ||
SK | 14.06.2023 | ||
SM | 14.06.2023 | ||
IE | 03.09.2023 | ||
NO | 14.09.2023 | ||
IS | 14.10.2023 | ||
Former [2024/28] | CZ | 14.06.2023 | |
ES | 14.06.2023 | ||
HR | 14.06.2023 | ||
MC | 14.06.2023 | ||
PL | 14.06.2023 | ||
RO | 14.06.2023 | ||
SK | 14.06.2023 | ||
SM | 14.06.2023 | ||
NO | 14.09.2023 | ||
IS | 14.10.2023 | ||
Former [2024/10] | CZ | 14.06.2023 | |
ES | 14.06.2023 | ||
HR | 14.06.2023 | ||
PL | 14.06.2023 | ||
RO | 14.06.2023 | ||
SK | 14.06.2023 | ||
SM | 14.06.2023 | ||
NO | 14.09.2023 | ||
IS | 14.10.2023 | ||
Former [2024/08] | ES | 14.06.2023 | |
HR | 14.06.2023 | ||
SK | 14.06.2023 | ||
SM | 14.06.2023 | ||
NO | 14.09.2023 | ||
Former [2023/51] | ES | 14.06.2023 | |
HR | 14.06.2023 | ||
NO | 14.09.2023 | ||
Former [2023/48] | ES | 14.06.2023 | |
NO | 14.09.2023 | ||
Former [2023/46] | ES | 14.06.2023 | Cited in | International search | [X]US3968321 (OLSZEWSKI JERZY ADAM, et al); | [A]US4204129 (HUTCHINS LOREN H JR [US]); | [A]WO03005386 (MANTOCK PAUL LENWORTH [GB]); | [A]WO2006106314 (MANTOCK PAUL LENWORTH [GB]) |