EP2313965 - POWER SUPPLY WITH ACCURATE ENERGY MEASUREMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.11.2017 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 16.12.2016 | ||
Former | Grant of patent is intended Status updated on 09.12.2016 | Most recent event Tooltip | 06.03.2020 | Lapse of the patent in a contracting state New state(s): TR | published on 08.04.2020 [2020/15] | Applicant(s) | For all designated states Cirrus Logic, Inc. 2901 Via Fortuna Austin, TX 78746 / US | [2011/17] | Inventor(s) | 01 /
MELANSON, John, L. 901 W. 9th 201 Austin TX 78703 / US | [2011/17] | Representative(s) | Hackney, Nigel John, et al Mewburn Ellis LLP City Tower 40 Basinghall Street London EC2V 5DE / GB | [2017/03] |
Former [2011/17] | Hackney, Nigel John, et al Mewburn Ellis LLP 33 Gutter Lane London EC2V 8AS / GB | Application number, filing date | 09800820.4 | 16.07.2009 | [2011/17] | WO2009US50831 | Priority number, date | US20080242024 | 30.09.2008 Original published format: US 242024 | US20080083717P | 25.07.2008 Original published format: US 83717 P | [2011/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010011559 | Date: | 28.01.2010 | Language: | EN | [2010/04] | Type: | A1 Application with search report | No.: | EP2313965 | Date: | 27.04.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.01.2010 takes the place of the publication of the European patent application. | [2011/17] | Type: | B1 Patent specification | No.: | EP2313965 | Date: | 18.01.2017 | Language: | EN | [2017/03] | Search report(s) | International search report - published on: | US | 28.01.2010 | (Supplementary) European search report - dispatched on: | EP | 05.10.2015 | Classification | IPC: | H02M5/42, H02M1/42 | [2015/45] | CPC: |
H01F38/02 (EP,US);
H01F3/10 (EP,US);
H02M1/42 (EP,US);
H01F2038/026 (EP,US);
H01F3/14 (EP,US);
H01F38/08 (EP,US);
|
Former IPC [2011/17] | H02M5/42 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2017/03] |
Former [2011/17] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | STROMVERSORGUNG MIT PRÄZISER ENERGIEMESSUNG | [2011/17] | English: | POWER SUPPLY WITH ACCURATE ENERGY MEASUREMENT | [2011/17] | French: | ALIMENTATION ÉLECTRIQUE AVEC MESURE D'ÉNERGIE PRÉCISE | [2011/17] | Entry into regional phase | 15.02.2011 | National basic fee paid | 15.02.2011 | Search fee paid | 15.02.2011 | Designation fee(s) paid | 15.02.2011 | Examination fee paid | Examination procedure | 15.02.2011 | Examination requested [2011/17] | 22.04.2016 | Amendment by applicant (claims and/or description) | 23.05.2016 | Despatch of a communication from the examining division (Time limit: M02) | 09.06.2016 | Reply to a communication from the examining division | 01.08.2016 | Communication of intention to grant the patent | 07.12.2016 | Fee for grant paid | 07.12.2016 | Fee for publishing/printing paid | 07.12.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.05.2016 | Opposition(s) | 19.10.2017 | No opposition filed within time limit [2017/52] | Fees paid | Renewal fee | 25.07.2011 | Renewal fee patent year 03 | 25.07.2012 | Renewal fee patent year 04 | 29.07.2013 | Renewal fee patent year 05 | 28.07.2014 | Renewal fee patent year 06 | 27.07.2015 | Renewal fee patent year 07 | 27.07.2016 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.07.2009 | AT | 18.01.2017 | CY | 18.01.2017 | CZ | 18.01.2017 | DK | 18.01.2017 | EE | 18.01.2017 | ES | 18.01.2017 | FI | 18.01.2017 | HR | 18.01.2017 | IT | 18.01.2017 | LT | 18.01.2017 | LV | 18.01.2017 | MC | 18.01.2017 | MK | 18.01.2017 | NL | 18.01.2017 | PL | 18.01.2017 | RO | 18.01.2017 | SE | 18.01.2017 | SI | 18.01.2017 | SK | 18.01.2017 | SM | 18.01.2017 | TR | 18.01.2017 | BG | 18.04.2017 | NO | 18.04.2017 | GR | 19.04.2017 | IS | 18.05.2017 | PT | 18.05.2017 | IE | 16.07.2017 | LU | 16.07.2017 | MT | 16.07.2017 | BE | 31.07.2017 | CH | 31.07.2017 | FR | 31.07.2017 | LI | 31.07.2017 | [2020/15] |
Former [2019/51] | HU | 16.07.2009 | |
AT | 18.01.2017 | ||
CY | 18.01.2017 | ||
CZ | 18.01.2017 | ||
DK | 18.01.2017 | ||
EE | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
IT | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
MC | 18.01.2017 | ||
MK | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
RO | 18.01.2017 | ||
SE | 18.01.2017 | ||
SI | 18.01.2017 | ||
SK | 18.01.2017 | ||
SM | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
IE | 16.07.2017 | ||
LU | 16.07.2017 | ||
MT | 16.07.2017 | ||
BE | 31.07.2017 | ||
CH | 31.07.2017 | ||
FR | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2019/46] | HU | 16.07.2009 | |
AT | 18.01.2017 | ||
CY | 18.01.2017 | ||
CZ | 18.01.2017 | ||
DK | 18.01.2017 | ||
EE | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
IT | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
MC | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
RO | 18.01.2017 | ||
SE | 18.01.2017 | ||
SI | 18.01.2017 | ||
SK | 18.01.2017 | ||
SM | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
IE | 16.07.2017 | ||
LU | 16.07.2017 | ||
MT | 16.07.2017 | ||
BE | 31.07.2017 | ||
CH | 31.07.2017 | ||
FR | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2019/31] | HU | 16.07.2009 | |
AT | 18.01.2017 | ||
CZ | 18.01.2017 | ||
DK | 18.01.2017 | ||
EE | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
IT | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
MC | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
RO | 18.01.2017 | ||
SE | 18.01.2017 | ||
SI | 18.01.2017 | ||
SK | 18.01.2017 | ||
SM | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
IE | 16.07.2017 | ||
LU | 16.07.2017 | ||
MT | 16.07.2017 | ||
BE | 31.07.2017 | ||
CH | 31.07.2017 | ||
FR | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2019/30] | AT | 18.01.2017 | |
CZ | 18.01.2017 | ||
DK | 18.01.2017 | ||
EE | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
IT | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
MC | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
RO | 18.01.2017 | ||
SE | 18.01.2017 | ||
SI | 18.01.2017 | ||
SK | 18.01.2017 | ||
SM | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
IE | 16.07.2017 | ||
LU | 16.07.2017 | ||
MT | 16.07.2017 | ||
BE | 31.07.2017 | ||
CH | 31.07.2017 | ||
FR | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2018/43] | AT | 18.01.2017 | |
CZ | 18.01.2017 | ||
DK | 18.01.2017 | ||
EE | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
IT | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
RO | 18.01.2017 | ||
SE | 18.01.2017 | ||
SI | 18.01.2017 | ||
SK | 18.01.2017 | ||
SM | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
IE | 16.07.2017 | ||
LU | 16.07.2017 | ||
MT | 16.07.2017 | ||
BE | 31.07.2017 | ||
CH | 31.07.2017 | ||
FR | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2018/39] | AT | 18.01.2017 | |
CZ | 18.01.2017 | ||
DK | 18.01.2017 | ||
EE | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
IT | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
RO | 18.01.2017 | ||
SE | 18.01.2017 | ||
SI | 18.01.2017 | ||
SK | 18.01.2017 | ||
SM | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
IE | 16.07.2017 | ||
LU | 16.07.2017 | ||
BE | 31.07.2017 | ||
CH | 31.07.2017 | ||
FR | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2018/34] | AT | 18.01.2017 | |
CZ | 18.01.2017 | ||
DK | 18.01.2017 | ||
EE | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
IT | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
RO | 18.01.2017 | ||
SE | 18.01.2017 | ||
SI | 18.01.2017 | ||
SK | 18.01.2017 | ||
SM | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
IE | 16.07.2017 | ||
LU | 16.07.2017 | ||
CH | 31.07.2017 | ||
FR | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2018/29] | AT | 18.01.2017 | |
CZ | 18.01.2017 | ||
DK | 18.01.2017 | ||
EE | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
IT | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
RO | 18.01.2017 | ||
SE | 18.01.2017 | ||
SI | 18.01.2017 | ||
SK | 18.01.2017 | ||
SM | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
IE | 16.07.2017 | ||
CH | 31.07.2017 | ||
FR | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2018/23] | AT | 18.01.2017 | |
CZ | 18.01.2017 | ||
DK | 18.01.2017 | ||
EE | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
IT | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
RO | 18.01.2017 | ||
SE | 18.01.2017 | ||
SI | 18.01.2017 | ||
SK | 18.01.2017 | ||
SM | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
IE | 16.07.2017 | ||
CH | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2018/21] | AT | 18.01.2017 | |
CZ | 18.01.2017 | ||
DK | 18.01.2017 | ||
EE | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
IT | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
RO | 18.01.2017 | ||
SE | 18.01.2017 | ||
SI | 18.01.2017 | ||
SK | 18.01.2017 | ||
SM | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
CH | 31.07.2017 | ||
LI | 31.07.2017 | ||
Former [2018/14] | AT | 18.01.2017 | |
CZ | 18.01.2017 | ||
DK | 18.01.2017 | ||
EE | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
IT | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
RO | 18.01.2017 | ||
SE | 18.01.2017 | ||
SI | 18.01.2017 | ||
SK | 18.01.2017 | ||
SM | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
Former [2017/51] | AT | 18.01.2017 | |
CZ | 18.01.2017 | ||
DK | 18.01.2017 | ||
EE | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
IT | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
RO | 18.01.2017 | ||
SE | 18.01.2017 | ||
SK | 18.01.2017 | ||
SM | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
Former [2017/50] | AT | 18.01.2017 | |
CZ | 18.01.2017 | ||
DK | 18.01.2017 | ||
EE | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
IT | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
RO | 18.01.2017 | ||
SE | 18.01.2017 | ||
SK | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
Former [2017/49] | AT | 18.01.2017 | |
CZ | 18.01.2017 | ||
EE | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
IT | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
RO | 18.01.2017 | ||
SE | 18.01.2017 | ||
SK | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
Former [2017/48] | AT | 18.01.2017 | |
CZ | 18.01.2017 | ||
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
SE | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | ||
Former [2017/40] | AT | 18.01.2017 | |
ES | 18.01.2017 | ||
FI | 18.01.2017 | ||
HR | 18.01.2017 | ||
LT | 18.01.2017 | ||
LV | 18.01.2017 | ||
NL | 18.01.2017 | ||
PL | 18.01.2017 | ||
SE | 18.01.2017 | ||
BG | 18.04.2017 | ||
NO | 18.04.2017 | ||
GR | 19.04.2017 | ||
IS | 18.05.2017 | ||
PT | 18.05.2017 | Documents cited: | Search | [Y]US2007145956 (TAKEUCHI TOSHIROU [JP]) [Y] 1-16 * abstract * * paragraphs [0008] - [0010] *; | [A]US2005128773 (YANG TA-YUNG [US], et al) [A] 1,11,16 * abstract *; | [A]US2005269997 (USUI HIROSHI [JP], et al) [A] 1,11,16 * abstract *; | [Y]JP2005216113 (FUJI ELECTRIC SYSTEMS CO LTD) [Y] 1-16 * abstract *; | [AP]JP2008310729 (CENTRAL RES INST ELECT) [AP] 1,11 * abstract *; | [A]JP2002296299 (SEKISUI CHEMICAL CO LTD, et al) [A] 1,11 * abstract * | International search | [A]US4700188 (JAMES WESLEY [US]); | [X]US5638265 (GABOR GEORGE [US]); | [A]US5691890 (HYDE RICHARD CHARLES [GB]); | [A]US5834858 (CROSMAN III ALEXANDER C [US], et al) |