| EP2379129 - METHODS AND SYSTEMS FOR TREATMENT OF ACUTE ISCHEMIC STROKE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.07.2018 Database last updated on 09.04.2026 | |
| Former | The patent has been granted Status updated on 11.08.2017 | ||
| Former | Grant of patent is intended Status updated on 09.04.2017 | ||
| Former | Examination is in progress Status updated on 23.11.2016 | Most recent event Tooltip | 29.05.2020 | Lapse of the patent in a contracting state New state(s): PT | published on 01.07.2020 [2020/27] | Applicant(s) | For all designated states Silk Road Medical, Inc. 735 N. Pastoria Avenue Sunnyvale, CA 94085 / US | [2017/37] |
| Former [2011/43] | For all designated states Silk Road Medical, Inc. 735 N. Pastoria Avenue Sunnyvale, CA 94085 / US | Inventor(s) | 01 /
GARRISON, Michi, E. 212 Roosevelt Avenue Half Moon Bay CA 94019 / US | 02 /
CHOU, Tony, M. 747 Bromfield Road Hillsborough CA 94010 / US | 03 /
HYDE, Gregory, M. 1449 Laurel Street Menlo Park CA 94025 / US | [2011/43] | Representative(s) | Slingsby Partners LLP 1 Kingsway London WC2B 6AN / GB | [2017/37] |
| Former [2013/15] | Mintz Levin Cohn Ferris Glovsky and Popeo LLP Alder Castle 10 Noble Street London EC2V 7JX / GB | ||
| Former [2011/43] | Campbell, Anne Elizabeth, et al Mintz Levin Cohn Ferris Glovsky and Popeo Intellectual Property LLP Alder Castle 10 Noble Street London EC2V 7JX / GB | Application number, filing date | 09803966.2 | 22.12.2009 | [2017/37] | WO2009US69300 | Priority number, date | US20080140601P | 23.12.2008 Original published format: US 140601 P | US20090176463P | 07.05.2009 Original published format: US 176463 P | [2011/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010075445 | Date: | 01.07.2010 | Language: | EN | [2010/26] | Type: | A1 Application with search report | No.: | EP2379129 | Date: | 26.10.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 01.07.2010 takes the place of the publication of the European patent application. | [2011/43] | Type: | B1 Patent specification | No.: | EP2379129 | Date: | 13.09.2017 | Language: | EN | [2017/37] | Search report(s) | International search report - published on: | EP | 01.07.2010 | Classification | IPC: | A61B17/3207, A61M1/36, A61M25/10, A61N7/00, // A61B17/22, A61M29/02, A61F2/01 | [2017/14] | CPC: |
A61M1/3621 (EP,US);
A61B17/320725 (EP,US);
A61M1/3613 (EP,US);
A61M1/3656 (EP,US);
A61M1/3659 (EP,US);
A61M25/0662 (EP,US);
A61M25/10 (EP,US);
A61N7/00 (EP,US);
A61B17/22004 (EP,US);
A61B2017/320716 (EP,US);
A61B2017/320733 (EP,US);
A61F2/013 (EP);
A61M1/3653 (EP,US);
A61M2025/0031 (EP,US);
A61M2025/0037 (EP,US);
A61M2025/0042 (EP,US);
A61M2025/0681 (EP,US);
A61M2025/1052 (EP,US);
A61M2205/7545 (EP,US);
A61M25/007 (EP,US);
A61M29/02 (EP,US);
A61N2007/0043 (EP,US)
(-)
|
| Former IPC [2011/43] | A61M1/36 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2017/37] | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN UND SYSTEME ZUR BEHANDLUNG VON AKUTEM ISCHÄMISCHEM SCHLAGANFALL | [2011/43] | English: | METHODS AND SYSTEMS FOR TREATMENT OF ACUTE ISCHEMIC STROKE | [2011/43] | French: | MÉTHODES ET SYSTÈMES POUR LE TRAITEMENT D'UN ACCIDENT CÉRÉBRAL ISCHÉMIQUE AIGU | [2011/43] | Entry into regional phase | 19.07.2011 | National basic fee paid | 19.07.2011 | Designation fee(s) paid | 19.07.2011 | Examination fee paid | Examination procedure | 19.07.2011 | Examination requested [2011/43] | 01.02.2012 | Amendment by applicant (claims and/or description) | 03.10.2013 | Despatch of a communication from the examining division (Time limit: M06) | 04.04.2014 | Reply to a communication from the examining division | 18.03.2015 | Despatch of a communication from the examining division (Time limit: M06) | 18.09.2015 | Reply to a communication from the examining division | 19.07.2016 | Despatch of a communication from the examining division (Time limit: M04) | 17.11.2016 | Reply to a communication from the examining division | 10.04.2017 | Communication of intention to grant the patent | 01.08.2017 | Fee for grant paid | 01.08.2017 | Fee for publishing/printing paid | 01.08.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 03.10.2013 | Opposition(s) | 14.06.2018 | No opposition filed within time limit [2018/34] | Fees paid | Renewal fee | 27.12.2011 | Renewal fee patent year 03 | 26.12.2012 | Renewal fee patent year 04 | 27.12.2013 | Renewal fee patent year 05 | 29.12.2014 | Renewal fee patent year 06 | 28.12.2015 | Renewal fee patent year 07 | 27.12.2016 | Renewal fee patent year 08 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.12.2009 | AT | 13.09.2017 | CY | 13.09.2017 | CZ | 13.09.2017 | DK | 13.09.2017 | EE | 13.09.2017 | ES | 13.09.2017 | FI | 13.09.2017 | HR | 13.09.2017 | IT | 13.09.2017 | LT | 13.09.2017 | LV | 13.09.2017 | MC | 13.09.2017 | MK | 13.09.2017 | NL | 13.09.2017 | PL | 13.09.2017 | PT | 13.09.2017 | RO | 13.09.2017 | SE | 13.09.2017 | SI | 13.09.2017 | SK | 13.09.2017 | SM | 13.09.2017 | TR | 13.09.2017 | BG | 13.12.2017 | NO | 13.12.2017 | GR | 14.12.2017 | IE | 22.12.2017 | LU | 22.12.2017 | MT | 22.12.2017 | BE | 31.12.2017 | CH | 31.12.2017 | LI | 31.12.2017 | IS | 13.01.2018 | [2020/27] |
| Former [2020/16] | HU | 22.12.2009 | |
| AT | 13.09.2017 | ||
| CY | 13.09.2017 | ||
| CZ | 13.09.2017 | ||
| DK | 13.09.2017 | ||
| EE | 13.09.2017 | ||
| ES | 13.09.2017 | ||
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| IT | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| MC | 13.09.2017 | ||
| MK | 13.09.2017 | ||
| NL | 13.09.2017 | ||
| PL | 13.09.2017 | ||
| RO | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| SI | 13.09.2017 | ||
| SK | 13.09.2017 | ||
| SM | 13.09.2017 | ||
| TR | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| IE | 22.12.2017 | ||
| LU | 22.12.2017 | ||
| MT | 22.12.2017 | ||
| BE | 31.12.2017 | ||
| CH | 31.12.2017 | ||
| LI | 31.12.2017 | ||
| IS | 13.01.2018 | ||
| Former [2019/51] | HU | 22.12.2009 | |
| AT | 13.09.2017 | ||
| CY | 13.09.2017 | ||
| CZ | 13.09.2017 | ||
| DK | 13.09.2017 | ||
| EE | 13.09.2017 | ||
| ES | 13.09.2017 | ||
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| IT | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| MC | 13.09.2017 | ||
| MK | 13.09.2017 | ||
| NL | 13.09.2017 | ||
| PL | 13.09.2017 | ||
| RO | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| SI | 13.09.2017 | ||
| SK | 13.09.2017 | ||
| SM | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| IE | 22.12.2017 | ||
| LU | 22.12.2017 | ||
| MT | 22.12.2017 | ||
| BE | 31.12.2017 | ||
| CH | 31.12.2017 | ||
| LI | 31.12.2017 | ||
| IS | 13.01.2018 | ||
| Former [2019/46] | HU | 22.12.2009 | |
| AT | 13.09.2017 | ||
| CY | 13.09.2017 | ||
| CZ | 13.09.2017 | ||
| DK | 13.09.2017 | ||
| EE | 13.09.2017 | ||
| ES | 13.09.2017 | ||
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| IT | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| MC | 13.09.2017 | ||
| NL | 13.09.2017 | ||
| PL | 13.09.2017 | ||
| RO | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| SI | 13.09.2017 | ||
| SK | 13.09.2017 | ||
| SM | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| IE | 22.12.2017 | ||
| LU | 22.12.2017 | ||
| MT | 22.12.2017 | ||
| BE | 31.12.2017 | ||
| CH | 31.12.2017 | ||
| LI | 31.12.2017 | ||
| IS | 13.01.2018 | ||
| Former [2019/31] | HU | 22.12.2009 | |
| AT | 13.09.2017 | ||
| CZ | 13.09.2017 | ||
| DK | 13.09.2017 | ||
| EE | 13.09.2017 | ||
| ES | 13.09.2017 | ||
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| IT | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| MC | 13.09.2017 | ||
| NL | 13.09.2017 | ||
| PL | 13.09.2017 | ||
| RO | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| SI | 13.09.2017 | ||
| SK | 13.09.2017 | ||
| SM | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| IE | 22.12.2017 | ||
| LU | 22.12.2017 | ||
| MT | 22.12.2017 | ||
| BE | 31.12.2017 | ||
| CH | 31.12.2017 | ||
| LI | 31.12.2017 | ||
| IS | 13.01.2018 | ||
| Former [2019/30] | AT | 13.09.2017 | |
| CZ | 13.09.2017 | ||
| DK | 13.09.2017 | ||
| EE | 13.09.2017 | ||
| ES | 13.09.2017 | ||
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| IT | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| MC | 13.09.2017 | ||
| NL | 13.09.2017 | ||
| PL | 13.09.2017 | ||
| RO | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| SI | 13.09.2017 | ||
| SK | 13.09.2017 | ||
| SM | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| IE | 22.12.2017 | ||
| LU | 22.12.2017 | ||
| MT | 22.12.2017 | ||
| BE | 31.12.2017 | ||
| CH | 31.12.2017 | ||
| LI | 31.12.2017 | ||
| IS | 13.01.2018 | ||
| Former [2018/52] | AT | 13.09.2017 | |
| CZ | 13.09.2017 | ||
| DK | 13.09.2017 | ||
| EE | 13.09.2017 | ||
| ES | 13.09.2017 | ||
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| IT | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| NL | 13.09.2017 | ||
| PL | 13.09.2017 | ||
| RO | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| SI | 13.09.2017 | ||
| SK | 13.09.2017 | ||
| SM | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| IE | 22.12.2017 | ||
| LU | 22.12.2017 | ||
| MT | 22.12.2017 | ||
| BE | 31.12.2017 | ||
| CH | 31.12.2017 | ||
| LI | 31.12.2017 | ||
| IS | 13.01.2018 | ||
| Former [2018/50] | AT | 13.09.2017 | |
| CZ | 13.09.2017 | ||
| DK | 13.09.2017 | ||
| EE | 13.09.2017 | ||
| ES | 13.09.2017 | ||
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| IT | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| NL | 13.09.2017 | ||
| PL | 13.09.2017 | ||
| RO | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| SK | 13.09.2017 | ||
| SM | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| IE | 22.12.2017 | ||
| LU | 22.12.2017 | ||
| MT | 22.12.2017 | ||
| BE | 31.12.2017 | ||
| IS | 13.01.2018 | ||
| Former [2018/45] | AT | 13.09.2017 | |
| CZ | 13.09.2017 | ||
| DK | 13.09.2017 | ||
| EE | 13.09.2017 | ||
| ES | 13.09.2017 | ||
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| IT | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| NL | 13.09.2017 | ||
| PL | 13.09.2017 | ||
| RO | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| SK | 13.09.2017 | ||
| SM | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| IE | 22.12.2017 | ||
| LU | 22.12.2017 | ||
| MT | 22.12.2017 | ||
| IS | 13.01.2018 | ||
| Former [2018/43] | AT | 13.09.2017 | |
| CZ | 13.09.2017 | ||
| DK | 13.09.2017 | ||
| EE | 13.09.2017 | ||
| ES | 13.09.2017 | ||
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| IT | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| NL | 13.09.2017 | ||
| PL | 13.09.2017 | ||
| RO | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| SK | 13.09.2017 | ||
| SM | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| LU | 22.12.2017 | ||
| MT | 22.12.2017 | ||
| IS | 13.01.2018 | ||
| Former [2018/35] | AT | 13.09.2017 | |
| CZ | 13.09.2017 | ||
| DK | 13.09.2017 | ||
| EE | 13.09.2017 | ||
| ES | 13.09.2017 | ||
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| IT | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| NL | 13.09.2017 | ||
| PL | 13.09.2017 | ||
| RO | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| SK | 13.09.2017 | ||
| SM | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| IS | 13.01.2018 | ||
| Former [2018/24] | AT | 13.09.2017 | |
| CZ | 13.09.2017 | ||
| EE | 13.09.2017 | ||
| ES | 13.09.2017 | ||
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| IT | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| NL | 13.09.2017 | ||
| PL | 13.09.2017 | ||
| RO | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| SK | 13.09.2017 | ||
| SM | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| IS | 13.01.2018 | ||
| Former [2018/23] | AT | 13.09.2017 | |
| CZ | 13.09.2017 | ||
| EE | 13.09.2017 | ||
| ES | 13.09.2017 | ||
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| NL | 13.09.2017 | ||
| PL | 13.09.2017 | ||
| RO | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| SK | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| IS | 13.01.2018 | ||
| Former [2018/21] | CZ | 13.09.2017 | |
| ES | 13.09.2017 | ||
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| NL | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| Former [2018/15] | ES | 13.09.2017 | |
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| NL | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| Former [2018/12] | ES | 13.09.2017 | |
| FI | 13.09.2017 | ||
| HR | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| LV | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| BG | 13.12.2017 | ||
| NO | 13.12.2017 | ||
| GR | 14.12.2017 | ||
| Former [2018/10] | FI | 13.09.2017 | |
| HR | 13.09.2017 | ||
| LT | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| NO | 13.12.2017 | ||
| Former [2018/09] | FI | 13.09.2017 | |
| LT | 13.09.2017 | ||
| SE | 13.09.2017 | ||
| NO | 13.12.2017 | ||
| Former [2018/08] | FI | 13.09.2017 | |
| LT | 13.09.2017 | ||
| NO | 13.12.2017 | ||
| Former [2018/07] | LT | 13.09.2017 | |
| NO | 13.12.2017 | Cited in | by applicant | FRAZEE, J. G.; X. LUO: "Retrograde transvenous perfusion", CRIT CARE CLIN, vol. 15, no. 4, 1999, pages 777 - 88 | FRAZEE, J. G.; X. LUO ET AL.: "Retrograde transvenous neuroperfusion: a back door treatment for stroke", STROKE, vol. 29, no. 9, 1998, pages 1912 - 6 | RIBO ET AL.: "Transcranial Doppler Monitoring of Transcervical Carotid Stenting with Flow Reversal Protection: A Novel Carotid Revascularization Technique", STROKE, vol. 37, 2006, pages 2846 - 2849 | SHEKEL ET AL.: "Experience of 500 Cases of Neurophysiological Monitoring in Carotid Endarterectomy", ACTA NEUROCHIR, vol. 149, 2007, pages 681 - 689, XP019544445, DOI: doi:10.1007/s00701-007-1228-8 DOI: http://dx.doi.org/10.1007/s00701-007-1228-8 |