blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2329333

EP2329333 - SYNCHRONISATION AND TIMING METHOD AND APPARATUS [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  07.08.2015
Database last updated on 09.09.2024
Most recent event   Tooltip07.08.2015Application deemed to be withdrawnpublished on 09.09.2015  [2015/37]
Applicant(s)For all designated states
Chronologic Pty Ltd
227 Gouger Street
Adelaide, SA 5000 / AU
[2011/23]
Inventor(s)01 / FOSTER, Peter Graham
3/15 Angas Street
Kent Town South Australia 5067 / AU
02 / SHANDAR, Sergey
45 Shoalhaven Circuit
Mawson Lakes South Australia 5095 / AU
03 / KOUZNETSOV, Alex
32 Dwyer Road
Oaklands Park South Australia 5046 / AU
 [2011/23]
Representative(s)Hauck Patentanwaltspartnerschaft mbB
Postfach 11 31 53
20431 Hamburg / DE
[N/P]
Former [2011/23]Hauck Patent- und Rechtsanwälte
Neuer Wall 50
20354 Hamburg / DE
Application number, filing date09807766.221.08.2009
[2011/23]
WO2009AU01081
Priority number, dateUS20080090638P21.08.2008         Original published format: US 90638 P
[2011/23]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2010020015
Date:25.02.2010
Language:EN
[2010/08]
Type: A1 Application with search report 
No.:EP2329333
Date:08.06.2011
Language:EN
The application published by WIPO in one of the EPO official languages on 25.02.2010 takes the place of the publication of the European patent application.
[2011/23]
Search report(s)International search report - published on:AU25.02.2010
(Supplementary) European search report - dispatched on:EP31.10.2014
ClassificationIPC:G06F1/12, G06F1/10, H04L7/04
[2014/49]
CPC:
G06F1/10 (EP,US); G06F1/12 (EP,US); G06F1/14 (US);
A61K31/496 (EP,US)
Former IPC [2011/23]G06F1/04, G06F1/10, G06F1/14, H04L7/04
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2011/23]
TitleGerman:VERFAHREN UND VORRICHTUNG FÜR SYNCHRONISIERUNG UND TAKTUNG[2011/23]
English:SYNCHRONISATION AND TIMING METHOD AND APPARATUS[2011/23]
French:PROCÉDÉ ET APPAREIL DE SYNCHRONISATION ET DE TEMPORISATION[2011/23]
Entry into regional phase15.03.2011National basic fee paid 
15.03.2011Search fee paid 
15.03.2011Designation fee(s) paid 
15.03.2011Examination fee paid 
Examination procedure15.03.2011Amendment by applicant (claims and/or description)
15.03.2011Examination requested  [2011/23]
03.03.2015Application deemed to be withdrawn, date of legal effect  [2015/37]
20.04.2015Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2015/37]
Fees paidRenewal fee
09.06.2011Renewal fee patent year 03
10.08.2012Renewal fee patent year 04
19.08.2013Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
31.08.201406   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[I]WO2007092997  (FIBERBYTE PTY LTD [AU], et al) [I] 2,9 * page 1, line 9 - page 11, line 6 * * page 14, line 20 - line 34 * * page 16, line 26 - page 18, line 7 * * page 19, line 29 - page 20, line 5 * * page 30, line 5 - page 33, line 36; figures 3-5,8,21-23; claims 1-12,68,69 *;
 [A]US2004148539  (LEYDIER ROBERT ANTOINE [FR], et al) [A] 2,9 * paragraph [0002] - paragraph [0028] * * paragraph [0054] - paragraph [0141]; figures 3-19; claims 1-15,26-40 *
International search[X]US2006146968  (LEYDIER ROBERT [FR], et al);
 [A]WO2004008330  (FIBERBYTE PTY LTD [AU]);
 [A]WO2007092997  (FIBERBYTE PTY LTD [AU], et al)
 [X]  - "Schedule Timeout - Schedule timeout event for each entity", (20080118), URL: http:/lweb.archive.org/web/20080118075455/http://www.mathworks.comlaccess/helpdesk/help/toolbox/simevents/ref/scheduletimeout.html, (20091126), XP008155049
 [A]  - DAX-2500X USER'S MANUAL, (20060822), URL: http:/lweb.archive.org/web/*/www.fiberbyte.com/PDF/DAQ2500XManual.pdf, (20091126), XP008144225
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.