EP2520069 - MANAGING SESSION DATA OF A COMPOSITE SERVICE SESSION IN A COMMUNICATION NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.04.2018 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 28.04.2017 | ||
Former | Grant of patent is intended Status updated on 12.03.2017 | Most recent event Tooltip | 29.05.2020 | Lapse of the patent in a contracting state New state(s): PT | published on 01.07.2020 [2020/27] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2017/22] |
Former [2012/45] | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
LEVENSHTEYN, Roman Mohnheimsallee 1 52062 Aachen / DE | 02 /
VANDIKAS, Konstantinos Theaterstrasse 13 52062 Aachen / DE | 03 /
FREITER, Eugen Schagenstr. 182 52078 Aachen / DE | 04 /
FIKOURAS, loannis Büchel 22-24 52062 Aachen / DE | [2012/45] | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [2017/22] |
Former [2012/45] | Kribber, Klaus-Dieter, et al Ericsson GmbH Patent Department Ericsson Allee 1 52134 Herzogenrath / DE | Application number, filing date | 09812422.5 | 31.12.2009 | [2017/22] | WO2009EP09346 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011079855 | Date: | 07.07.2011 | Language: | EN | [2011/27] | Type: | A1 Application with search report | No.: | EP2520069 | Date: | 07.11.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.07.2011 takes the place of the publication of the European patent application. | [2012/45] | Type: | B1 Patent specification | No.: | EP2520069 | Date: | 31.05.2017 | Language: | EN | [2017/22] | Search report(s) | International search report - published on: | EP | 07.07.2011 | Classification | IPC: | H04L29/08 | [2012/45] | CPC: |
H04L65/1069 (EP,US);
H04L65/1066 (US);
H04L65/401 (EP,US);
H04L67/10 (EP,US);
H04L67/14 (EP,US);
H04L67/567 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/45] | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | VERWALTUNG VON SITZUNGSDATEN EINER COMPOSITE-SERVICE-SITZUNG IN EINEM KOMMUNIKATIONSNETZWERK | [2012/45] | English: | MANAGING SESSION DATA OF A COMPOSITE SERVICE SESSION IN A COMMUNICATION NETWORK | [2012/45] | French: | GESTION DE DONNÉES DE SESSION D'UNE SESSION DE SERVICE COMPOSITE DANS UN RÉSEAU DE COMMUNICATION | [2012/45] | Entry into regional phase | 27.07.2012 | National basic fee paid | 27.07.2012 | Designation fee(s) paid | 27.07.2012 | Examination fee paid | Examination procedure | 31.10.2011 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 27.07.2012 | Examination requested [2012/45] | 08.02.2013 | Amendment by applicant (claims and/or description) | 23.04.2013 | Despatch of a communication from the examining division (Time limit: M06) | 30.10.2013 | Reply to a communication from the examining division | 13.03.2017 | Communication of intention to grant the patent | 19.04.2017 | Fee for grant paid | 19.04.2017 | Fee for publishing/printing paid | 19.04.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.04.2013 | Opposition(s) | 01.03.2018 | No opposition filed within time limit [2018/19] | Fees paid | Renewal fee | 12.07.2012 | Renewal fee patent year 03 | 26.12.2012 | Renewal fee patent year 04 | 27.12.2013 | Renewal fee patent year 05 | 29.12.2014 | Renewal fee patent year 06 | 28.12.2015 | Renewal fee patent year 07 | 27.12.2016 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.12.2009 | AT | 31.05.2017 | CY | 31.05.2017 | CZ | 31.05.2017 | DK | 31.05.2017 | EE | 31.05.2017 | ES | 31.05.2017 | FI | 31.05.2017 | HR | 31.05.2017 | IT | 31.05.2017 | LT | 31.05.2017 | LV | 31.05.2017 | MC | 31.05.2017 | MK | 31.05.2017 | NL | 31.05.2017 | PL | 31.05.2017 | PT | 31.05.2017 | RO | 31.05.2017 | SE | 31.05.2017 | SI | 31.05.2017 | SK | 31.05.2017 | SM | 31.05.2017 | TR | 31.05.2017 | BG | 31.08.2017 | NO | 31.08.2017 | GR | 01.09.2017 | IS | 30.09.2017 | BE | 31.12.2017 | CH | 31.12.2017 | IE | 31.12.2017 | LI | 31.12.2017 | LU | 31.12.2017 | MT | 31.12.2017 | [2020/27] |
Former [2020/15] | HU | 31.12.2009 | |
AT | 31.05.2017 | ||
CY | 31.05.2017 | ||
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MC | 31.05.2017 | ||
MK | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
TR | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
IE | 31.12.2017 | ||
LI | 31.12.2017 | ||
LU | 31.12.2017 | ||
MT | 31.12.2017 | ||
Former [2019/51] | HU | 31.12.2009 | |
AT | 31.05.2017 | ||
CY | 31.05.2017 | ||
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MC | 31.05.2017 | ||
MK | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
IE | 31.12.2017 | ||
LI | 31.12.2017 | ||
LU | 31.12.2017 | ||
MT | 31.12.2017 | ||
Former [2019/46] | HU | 31.12.2009 | |
AT | 31.05.2017 | ||
CY | 31.05.2017 | ||
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MC | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
IE | 31.12.2017 | ||
LI | 31.12.2017 | ||
LU | 31.12.2017 | ||
MT | 31.12.2017 | ||
Former [2019/31] | HU | 31.12.2009 | |
AT | 31.05.2017 | ||
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MC | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
IE | 31.12.2017 | ||
LI | 31.12.2017 | ||
LU | 31.12.2017 | ||
MT | 31.12.2017 | ||
Former [2019/30] | AT | 31.05.2017 | |
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
MC | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
IE | 31.12.2017 | ||
LI | 31.12.2017 | ||
LU | 31.12.2017 | ||
MT | 31.12.2017 | ||
Former [2018/52] | AT | 31.05.2017 | |
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
IE | 31.12.2017 | ||
LI | 31.12.2017 | ||
LU | 31.12.2017 | ||
MT | 31.12.2017 | ||
Former [2018/50] | AT | 31.05.2017 | |
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
BE | 31.12.2017 | ||
IE | 31.12.2017 | ||
LU | 31.12.2017 | ||
MT | 31.12.2017 | ||
Former [2018/45] | AT | 31.05.2017 | |
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
IE | 31.12.2017 | ||
LU | 31.12.2017 | ||
MT | 31.12.2017 | ||
Former [2018/43] | AT | 31.05.2017 | |
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
LU | 31.12.2017 | ||
MT | 31.12.2017 | ||
Former [2018/25] | AT | 31.05.2017 | |
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SI | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2018/11] | AT | 31.05.2017 | |
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
IT | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
PL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SK | 31.05.2017 | ||
SM | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2018/10] | AT | 31.05.2017 | |
CZ | 31.05.2017 | ||
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
RO | 31.05.2017 | ||
SE | 31.05.2017 | ||
SK | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2018/09] | AT | 31.05.2017 | |
DK | 31.05.2017 | ||
EE | 31.05.2017 | ||
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
SE | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2017/52] | AT | 31.05.2017 | |
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
NL | 31.05.2017 | ||
SE | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2017/50] | AT | 31.05.2017 | |
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
LV | 31.05.2017 | ||
SE | 31.05.2017 | ||
BG | 31.08.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | ||
Former [2017/49] | AT | 31.05.2017 | |
ES | 31.05.2017 | ||
FI | 31.05.2017 | ||
HR | 31.05.2017 | ||
LT | 31.05.2017 | ||
NO | 31.08.2017 | ||
GR | 01.09.2017 | ||
IS | 30.09.2017 | Cited in | International search | [A]EP1879358 (HEWLETT PACKARD DEVELOPMENT CO [US]) [A] 1-24 * paragraphs [0001] - [0029] *; | [AD]EP1978758 (ERICSSON TELEFON AB L M [SE]) [AD] 1-24 * abstract ** paragraphs [0001] - [0048] *; | [I] - WU B ET AL, "Workflow-based resource allocation to optimize overall performance of composite services", FUTURE GENERATIONS COMPUTER SYSTEMS, ELSEVIER SCIENCE PUBLISHERS. AMSTERDAM, NL LNKD- DOI:10.1016/J.FUTURE.2008.06.003, vol. 25, no. 3, ISSN 0167-739X, (20090301), pages 199 - 212, (20080625), XP025671056 [I] 1-24 * abstract * * sections 1. - 4., 6. ,7. * DOI: http://dx.doi.org/10.1016/j.future.2008.06.003 | [I] - BANGYU WU ET AL, "Resource Allocation Based On Workflow For Enhancing the Performance of Composite Service", SERVICES COMPUTING, 2007. SCC 2007. IEEE INTERNATIONAL CONFERENCE ON, IEEE, PISCATAWAY, NJ, USA, (20070701), ISBN 978-0-7695-2925-7, pages 552 - 559, XP031119523 [I] 1-24 * abstract * * sections 1., 3., 4. * | [A] - SALAS J ET AL, "WS-REPLICATION: A FRAMEWORK FOR HIGHLY AVAILABLE WEB SERVICES", WWW 2006,, (20060523), ISBN 978-1-59593-323-2, pages 357 - 366, XP002502965 [A] 1-24 * abstract * * sections 1. - 3. * DOI: http://dx.doi.org/10.1145/1135777.1135831 | [A] - JÖRG NIEMÖLLER ET AL, Aspect Orientation for Composite Services in the Telecommunication Domain, SERVICE-ORIENTED COMPUTING, SPRINGER BERLIN HEIDELBERG, BERLIN, HEIDELBERG, PAGE(S) 19 - 33, (20091124), ISBN 978-3-642-10382-7, XP019134565 [A] 1-24 * abstract * * sections 1 - 3 * DOI: http://dx.doi.org/10.1007/978-3-642-10383-4_2 | by applicant | EP1978758 | WO2008119364 |