EP2326246 - GAS SAMPLING LINE FOR RESPIRATORY GASES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.03.2020 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 29.03.2019 | ||
Former | Grant of patent is intended Status updated on 27.11.2018 | ||
Former | Examination is in progress Status updated on 30.11.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Masimo Corporation 40 Parker Irvine, CA 92618 / US | [2019/18] |
Former [2014/41] | For all designated states Masimo Corporation 40 Parker Irvine, CA 92618 / US | ||
Former [2011/22] | For all designated states Phasein AB Svärdvägen 15 18233 Danderyd / SE | Inventor(s) | 01 /
ZYZANSKI, Robert Eriksbergsgatan 13 114 30 Stockholm / SE | 02 /
ECKERBOM, Anders Stefan Löfvings väg 49 185 41 Vaxholm / SE | [2019/18] |
Former [2011/22] | 01 /
ZYZANSKI, Robert Eriksbergsgatan 13 S-114 30 Stockholm / SE | ||
02 /
ECKERBOM, Anders Stefan Löfvings väg 49 S-185 41 Vaxholm / SE | Representative(s) | Zacco Sweden AB P.O. Box 5581 Löjtnantsgatan 21 114 85 Stockholm / SE | [N/P] |
Former [2019/18] | Zacco Sweden AB P.O. Box 5581 114 85 Stockholm / SE | ||
Former [2011/22] | Presland, Torbjörn Awapatent AB P.O. Box 45086 104 30 Stockholm / SE | Application number, filing date | 09813309.3 | 11.09.2009 | [2011/22] | WO2009SE51012 | Priority number, date | SE20080001967 | 15.09.2008 Original published format: SE 0801967 | [2011/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010030226 | Date: | 18.03.2010 | Language: | EN | [2010/11] | Type: | A1 Application with search report | No.: | EP2326246 | Date: | 01.06.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 18.03.2010 takes the place of the publication of the European patent application. | [2011/22] | Type: | B1 Patent specification | No.: | EP2326246 | Date: | 01.05.2019 | Language: | EN | [2019/18] | Search report(s) | International search report - published on: | SE | 18.03.2010 | (Supplementary) European search report - dispatched on: | EP | 07.12.2012 | Classification | IPC: | A61B5/097, A61B5/08, A62B9/00, B01D53/22 | [2011/22] | CPC: |
A61B5/097 (EP,US);
A61B5/08 (SE);
A61B5/082 (EP,SE,US);
B01D53/22 (SE)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2019/18] |
Former [2011/22] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | GASPROBENLEITUNG FÜR ATEMGASE | [2011/22] | English: | GAS SAMPLING LINE FOR RESPIRATORY GASES | [2011/22] | French: | LIGNE D'ÉCHANTILLONNAGE DE GAZ POUR GAZ RESPIRATOIRES | [2011/22] | Entry into regional phase | 09.03.2011 | National basic fee paid | 09.03.2011 | Search fee paid | 09.03.2011 | Designation fee(s) paid | 09.03.2011 | Examination fee paid | Examination procedure | 09.03.2011 | Examination requested [2011/27] | 20.09.2012 | Observations by third parties | 01.07.2013 | Amendment by applicant (claims and/or description) | 02.06.2015 | Observations by third parties | 10.08.2015 | Despatch of a communication from the examining division (Time limit: M06) | 09.02.2016 | Reply to a communication from the examining division | 20.05.2016 | Despatch of a communication from the examining division (Time limit: M06) | 29.11.2016 | Reply to a communication from the examining division | 14.03.2017 | Despatch of a communication from the examining division (Time limit: M06) | 14.09.2017 | Reply to a communication from the examining division | 12.10.2018 | Cancellation of oral proceeding that was planned for 17.10.2018 | 17.10.2018 | Date of oral proceedings (cancelled) | 28.11.2018 | Communication of intention to grant the patent | 20.03.2019 | Fee for grant paid | 20.03.2019 | Fee for publishing/printing paid | 20.03.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.08.2015 | Opposition(s) | 04.02.2020 | No opposition filed within time limit [2020/15] | Fees paid | Renewal fee | 08.09.2011 | Renewal fee patent year 03 | 07.09.2012 | Renewal fee patent year 04 | 06.09.2013 | Renewal fee patent year 05 | 12.09.2014 | Renewal fee patent year 06 | 11.09.2015 | Renewal fee patent year 07 | 13.09.2016 | Renewal fee patent year 08 | 12.09.2017 | Renewal fee patent year 09 | 11.09.2018 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.09.2009 | AT | 01.05.2019 | CY | 01.05.2019 | CZ | 01.05.2019 | DK | 01.05.2019 | EE | 01.05.2019 | ES | 01.05.2019 | FI | 01.05.2019 | HR | 01.05.2019 | IT | 01.05.2019 | LT | 01.05.2019 | LV | 01.05.2019 | MC | 01.05.2019 | MK | 01.05.2019 | MT | 01.05.2019 | NL | 01.05.2019 | PL | 01.05.2019 | RO | 01.05.2019 | SE | 01.05.2019 | SI | 01.05.2019 | SK | 01.05.2019 | SM | 01.05.2019 | TR | 01.05.2019 | BG | 01.08.2019 | NO | 01.08.2019 | GR | 02.08.2019 | IS | 01.09.2019 | PT | 01.09.2019 | IE | 11.09.2019 | LU | 11.09.2019 | BE | 30.09.2019 | CH | 30.09.2019 | LI | 30.09.2019 | [2022/31] |
Former [2021/34] | HU | 11.09.2009 | |
AT | 01.05.2019 | ||
CY | 01.05.2019 | ||
CZ | 01.05.2019 | ||
DK | 01.05.2019 | ||
EE | 01.05.2019 | ||
ES | 01.05.2019 | ||
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
IT | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
MC | 01.05.2019 | ||
MT | 01.05.2019 | ||
NL | 01.05.2019 | ||
PL | 01.05.2019 | ||
RO | 01.05.2019 | ||
SE | 01.05.2019 | ||
SI | 01.05.2019 | ||
SK | 01.05.2019 | ||
SM | 01.05.2019 | ||
TR | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
IE | 11.09.2019 | ||
LU | 11.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2021/32] | HU | 11.09.2009 | |
AT | 01.05.2019 | ||
CY | 01.05.2019 | ||
CZ | 01.05.2019 | ||
DK | 01.05.2019 | ||
EE | 01.05.2019 | ||
ES | 01.05.2019 | ||
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
IT | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
MC | 01.05.2019 | ||
NL | 01.05.2019 | ||
PL | 01.05.2019 | ||
RO | 01.05.2019 | ||
SE | 01.05.2019 | ||
SI | 01.05.2019 | ||
SK | 01.05.2019 | ||
SM | 01.05.2019 | ||
TR | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
IE | 11.09.2019 | ||
LU | 11.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2021/26] | AT | 01.05.2019 | |
CY | 01.05.2019 | ||
CZ | 01.05.2019 | ||
DK | 01.05.2019 | ||
EE | 01.05.2019 | ||
ES | 01.05.2019 | ||
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
IT | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
MC | 01.05.2019 | ||
NL | 01.05.2019 | ||
PL | 01.05.2019 | ||
RO | 01.05.2019 | ||
SE | 01.05.2019 | ||
SI | 01.05.2019 | ||
SK | 01.05.2019 | ||
SM | 01.05.2019 | ||
TR | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
IE | 11.09.2019 | ||
LU | 11.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/38] | AT | 01.05.2019 | |
CZ | 01.05.2019 | ||
DK | 01.05.2019 | ||
EE | 01.05.2019 | ||
ES | 01.05.2019 | ||
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
IT | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
MC | 01.05.2019 | ||
NL | 01.05.2019 | ||
PL | 01.05.2019 | ||
RO | 01.05.2019 | ||
SE | 01.05.2019 | ||
SI | 01.05.2019 | ||
SK | 01.05.2019 | ||
SM | 01.05.2019 | ||
TR | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
IE | 11.09.2019 | ||
LU | 11.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/36] | AT | 01.05.2019 | |
CZ | 01.05.2019 | ||
DK | 01.05.2019 | ||
EE | 01.05.2019 | ||
ES | 01.05.2019 | ||
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
IT | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
MC | 01.05.2019 | ||
NL | 01.05.2019 | ||
PL | 01.05.2019 | ||
RO | 01.05.2019 | ||
SE | 01.05.2019 | ||
SI | 01.05.2019 | ||
SK | 01.05.2019 | ||
SM | 01.05.2019 | ||
TR | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
IE | 11.09.2019 | ||
LU | 11.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/35] | AT | 01.05.2019 | |
CZ | 01.05.2019 | ||
DK | 01.05.2019 | ||
EE | 01.05.2019 | ||
ES | 01.05.2019 | ||
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
IT | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
MC | 01.05.2019 | ||
NL | 01.05.2019 | ||
PL | 01.05.2019 | ||
RO | 01.05.2019 | ||
SE | 01.05.2019 | ||
SI | 01.05.2019 | ||
SK | 01.05.2019 | ||
SM | 01.05.2019 | ||
TR | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
LU | 11.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/34] | AT | 01.05.2019 | |
CZ | 01.05.2019 | ||
DK | 01.05.2019 | ||
EE | 01.05.2019 | ||
ES | 01.05.2019 | ||
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
IT | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
MC | 01.05.2019 | ||
NL | 01.05.2019 | ||
PL | 01.05.2019 | ||
RO | 01.05.2019 | ||
SE | 01.05.2019 | ||
SI | 01.05.2019 | ||
SK | 01.05.2019 | ||
SM | 01.05.2019 | ||
TR | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/25] | AT | 01.05.2019 | |
CZ | 01.05.2019 | ||
DK | 01.05.2019 | ||
EE | 01.05.2019 | ||
ES | 01.05.2019 | ||
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
IT | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
MC | 01.05.2019 | ||
NL | 01.05.2019 | ||
PL | 01.05.2019 | ||
RO | 01.05.2019 | ||
SE | 01.05.2019 | ||
SI | 01.05.2019 | ||
SK | 01.05.2019 | ||
SM | 01.05.2019 | ||
TR | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
Former [2020/17] | AT | 01.05.2019 | |
CZ | 01.05.2019 | ||
DK | 01.05.2019 | ||
EE | 01.05.2019 | ||
ES | 01.05.2019 | ||
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
IT | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
NL | 01.05.2019 | ||
RO | 01.05.2019 | ||
SE | 01.05.2019 | ||
SK | 01.05.2019 | ||
SM | 01.05.2019 | ||
TR | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
Former [2020/14] | AT | 01.05.2019 | |
CZ | 01.05.2019 | ||
DK | 01.05.2019 | ||
EE | 01.05.2019 | ||
ES | 01.05.2019 | ||
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
IT | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
NL | 01.05.2019 | ||
RO | 01.05.2019 | ||
SE | 01.05.2019 | ||
SK | 01.05.2019 | ||
SM | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
Former [2020/12] | AT | 01.05.2019 | |
CZ | 01.05.2019 | ||
DK | 01.05.2019 | ||
EE | 01.05.2019 | ||
ES | 01.05.2019 | ||
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
IT | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
NL | 01.05.2019 | ||
RO | 01.05.2019 | ||
SE | 01.05.2019 | ||
SK | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
Former [2020/11] | AT | 01.05.2019 | |
CZ | 01.05.2019 | ||
DK | 01.05.2019 | ||
EE | 01.05.2019 | ||
ES | 01.05.2019 | ||
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
NL | 01.05.2019 | ||
RO | 01.05.2019 | ||
SE | 01.05.2019 | ||
SK | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
Former [2020/10] | AT | 01.05.2019 | |
CZ | 01.05.2019 | ||
DK | 01.05.2019 | ||
ES | 01.05.2019 | ||
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
NL | 01.05.2019 | ||
RO | 01.05.2019 | ||
SE | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
Former [2020/09] | CZ | 01.05.2019 | |
DK | 01.05.2019 | ||
ES | 01.05.2019 | ||
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
NL | 01.05.2019 | ||
SE | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
Former [2020/04] | ES | 01.05.2019 | |
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
NL | 01.05.2019 | ||
SE | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
IS | 01.09.2019 | ||
PT | 01.09.2019 | ||
Former [2019/51] | ES | 01.05.2019 | |
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
NL | 01.05.2019 | ||
SE | 01.05.2019 | ||
BG | 01.08.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
PT | 01.09.2019 | ||
Former [2019/50] | ES | 01.05.2019 | |
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
LT | 01.05.2019 | ||
LV | 01.05.2019 | ||
NL | 01.05.2019 | ||
SE | 01.05.2019 | ||
NO | 01.08.2019 | ||
GR | 02.08.2019 | ||
PT | 01.09.2019 | ||
Former [2019/49] | ES | 01.05.2019 | |
FI | 01.05.2019 | ||
HR | 01.05.2019 | ||
LT | 01.05.2019 | ||
NL | 01.05.2019 | ||
SE | 01.05.2019 | ||
NO | 01.08.2019 | ||
PT | 01.09.2019 | ||
Former [2019/48] | ES | 01.05.2019 | |
FI | 01.05.2019 | ||
LT | 01.05.2019 | ||
SE | 01.05.2019 | ||
NO | 01.08.2019 | ||
PT | 01.09.2019 | ||
Former [2019/47] | ES | 01.05.2019 | |
FI | 01.05.2019 | ||
LT | 01.05.2019 | ||
NO | 01.08.2019 | Documents cited: | Search | [A]GB2175208 (KENDALL & CO); | [A]US5703161 (STEENBLOCK ROLAND EUGEN [DE], et al); | [Y]US2005161042 (FUDGE BRIAN M [US], et al); | [Y]US2006014059 (WOOD ROLAND A [US]) | International search | [A]US5042500 (NORLIEN JOHN A [US], et al); | [A]WO9846277 (OHMEDA INC [US], et al); | [A]US2003191405 (RICH DAVID R [US], et al); | [A]US6783573 (RICHARDSON PETER [US]); | [A]WO2005072297 (RIC INVESTMENTS LLC [US]); | [A]WO2006120683 (ORIDION MEDICAL LTD [IL], et al) | other | US4705543 | US2004029467 | US2008034964 | US2010174239 |